PAS改良孵化技術(shù)公司大樓
Pas Reform
地點:荷蘭杜廷赫姆
業(yè)主:Pas改良孵化技術(shù)公司
面積:4 592平方米(一期);3 868平方米(二期)
完工:2011年(一期);2013年(二期)
攝影:Léon van Woerkom
Address: Informaticaweg 14, Doetinchem, the Netherlands
Client: Pas Reform Hatchery Technologies, Zeddam the Netherlands
Gfa: 4 592 m2(phase 1); 3 868 m2(phase 2)
Realization: 2011 (phase 1); 2013 (phase 2)
Photography: Léon van Woerkom
PAS改良孵化技術(shù)公司是一家家禽業(yè)孵化技術(shù)領(lǐng)域的國際化公司。該公司產(chǎn)品包括孵化器部件。近年,該公司分兩期新建了一座由cepezed設(shè)計的8 500平方米的小型樓宇。在此過程中,也考慮了未來的三期擴建。
一期項目單純用于運輸和配送,因此設(shè)計極為簡單、高效,但也以極低的預(yù)算展現(xiàn)了其異乎尋常的優(yōu)秀質(zhì)量。總體上,建筑物包括一座獨立的大樓,在東南角另有一個約六米見方的雙兩層建筑;辦公區(qū)設(shè)于首層,餐廳設(shè)在二樓。建筑內(nèi)還設(shè)有衛(wèi)生間、更衣室和淋浴間。建筑內(nèi)的屋頂和地板很薄,集合了所有建筑設(shè)施。主樓采用細(xì)長的鋼結(jié)構(gòu),柱網(wǎng)基于標(biāo)準(zhǔn)棧板架的尺寸。大廳采用數(shù)量極少的細(xì)長柱,最前方的25米完全沒有柱子,以便卡車駛?cè)?。升降門和裝卸棚等立面開口采用與立面相同的壓型鋼板覆蓋,關(guān)閉時完全對齊,形成一個不間斷的正立面。立面本身主要由隔熱內(nèi)箱組成,外部帶有黑色鋼板樁涂層飾面。在四個角落,板材采用斜接方式,接縫已密封,營造出一種非常高雅精致的效果。無延伸的灌澆混凝土地板內(nèi)含與蓄熱系統(tǒng)相連的水管。
二期工程與一期無縫對接,位于地塊南側(cè),大部分區(qū)域也布滿儲存和運輸架。與一期工程一樣,建筑物還包含東翼的一個內(nèi)部建筑,其中設(shè)有培訓(xùn)室和演示區(qū)。未來可能實施三期工程,為PAS改良公司提供辦公場所,而目前公司的辦公區(qū)仍位于澤丹。一期項目在2012年東部地區(qū)BNA年度建筑獎評選中獲獎。評委在報告中稱:“純粹、纖細(xì)、高雅、可控——是這座建筑給評委帶來的深刻印象,評委為其展示的工藝所折服。”
Pas Reform Hatching Technologies is an international player in the field of hatchery technology for the poultry sector. The company’s products include components for hatching incubators. In recent years, it has realized in two phases a small 8,500 m2 new-build, designed by cepezed. During this process, further expansion in a possible third phase was factored in.
The capacity realized in phase one is intended purely for transfer and distribution and has, partly as a result of this, an exceptionally simple and efficient design, where nonetheless an unusually high-quality appearance has been achieved within a very modest budget. In essence, the building component consists of a single large sober volume, where another two-storey volume circa six metres square has been placed in the south-east corner; it has an office space on the ground floor and a canteen on the first floor. The toilets, changing rooms and showers are also situated in this inner volume. The inner volume has an extremely thin roof and floor package in which all the building services are integrated. The main volume has a slender steel construction where the column grid is based on the dimensions of standard pallet racks. The hall is characterized by a minimum number of slender columns, while the foremost 25 metres are entirely columnfree to allow lorries to manoeuvre better. The fa?ade apertures such as overhead doors and dock shelters are clad with the same profiled sheeting as the fa?ades and align perfectly when closed, to create an uninterrupted frontage. The fa?ades themselves consist mainly of insulated interior boxes with an exterior finish of black coated sheet piling. At the corners the sheeting has been mitred and the seams have been sealed shut, which creates a very refined impression. The non-expanded poured concrete floor contains water piping that is connected to a thermal storage system.
Phase two dovetails seamlessly, fills the plot in a southerly direction and is for the most part also filled with racks for storage and transfer. Just like phase one, this building block also contains an inner volume in the east wing, which houses a training room and demonstration area. A possible third phase would provide space for the office functions of Pas Reform, which are still located in Zeddam. Phase one was the winner of the BNA Building of the Year competition in the year 2012 in the East region. An excerpt from the jury rapport: ‘Pure, slender, elegant, controlled – the jury is deeply impressed by the craftsmanship manifested by this building.’