    Risk Assessment, Management and Application in Nuclear Power Plant Operation

    2014-08-12 02:31:06SHENGGuolong圣國龍QIUYanrong邱艷榮LIQiongzhe李瓊哲

    SHENG Guo-long(圣國龍), QIU Yan-rong(邱艷榮), LI Qiong-zhe(李瓊哲)

    1. Suzhou Nuclear Power Research Institute, Shenzhen 518028, China 2. Nuclear and Radiation Safety Center, Beijing 10082, China

    Risk Assessment, Management and Application in Nuclear Power Plant Operation

    SHENG Guo-long(圣國龍)1, QIU Yan-rong(邱艷榮)2*, LI Qiong-zhe(李瓊哲)1

    1.SuzhouNuclearPowerResearchInstitute,Shenzhen518028,China2.NuclearandRadiationSafetyCenter,Beijing10082,China

    To introduce the basic concepts of technical specification of nuclear power plant, a risk assessment and management technique based on the probabilistic safety analysis (PSA) method was proposed. The risk-informed method was used, and an example was given to show how to use some specific risk metrics like CDF/LERF/ICDP/ILERP to analyze and manage the risk associated with activities in nuclear power plant operation. The advantage of this technique can be concluded from this paper, and this technique should be used more widely and deeply in nuclear industry.

    technicalspecification;probabilisticsafetyanalysis(PSA);riskassessment;riskmanagement

    Introduction

    Probabilistic safety analysis (PSA), also named probabilistic risk assessment, is a logical tool, based on both probabilistic methodology and reliability engineering, for deriving numerical estimates of risk from nuclear power plant (or indeed any plant in general). PSA was firstly applied extensively into nuclear plant safety in 1975. After being developed rapidly, it has been recognized as an effective tool of risk assessment and integrated gradually into plant operation management, resulting in the formation of risk informed regulation that combines both deterministic methodology and probabilistic methodology. In 1998, U.S. Nuclear Regulation Committee (NRC) issued a series of regulatory guidelines, advocating the use of the risk-informed management which gained a positive response among the nuclear industry[1]. Technical specification defines the basic rules that can guarantee the safety of nuclear power plant operation. The use of PSA to optimize technical specification is a very important activity following NRC’s regulatory guidelines with a purpose of improving the security and economy of nuclear power plant.

    However, use of PSA to optimize technical specification has not been implemented detailed in the nuclear industry, one reason is that it’s difficult to incorporate this technique into the actual plant activities. This paper focuses on the meaning of risk management and how to use risk metrics and insights to support plant operation decisions. In addition, we also discuss the relationship between different applications, and how to improve the applications in a more reasonable way.

    1 Probabilistic Safety Analysis (PSA)

    Based on the probabilistic methodology and reliability engineering, PSA can build a logical model for a nuclear power plant by conducting fault tree analysis, event tree analysis, human reliability analysis, data analysis, and so on. After building this logical model, qualification and quantification analysis can be conducted with the model. With a number of characteristics, PSA method is able to largely remedy the weaknesses of traditional deterministic methodology, among which the core feature is that PSA can make a quantitative evaluation on risk.

    There are three levels of PSA. Level 1 PSA studies the accident progress and accident sequences which lead to core damage, and the main result of Level 1 PSA is core damage frequency (CDF, its unit is per year); Level 2 PSA, based on the analysis results from Level 1, researches the accident process and containment response after core damage, and the main result of Level 2 PSA is large early release frequency (LERF, its unit is per year); Level 3 PSA analyzes the dispersion of radionuclides to the surrounding environment, analyzing the potential effects for both environment and health.

    Generally, PSA includes the following major technical elements[2].

    (1) Initiating events analysis

    Identification of initiating events is the starting point of PSA. Initiating events are the incidents which may potentially lead to core damage if additional failures of the safety systems to perform safety functions occur. Identified initiating events which have similar plant response need to be grouped.

    (2) Accident sequence analysis

    This technical element is to determine the response of the plant to each initiating event group identified above. The response of the plant includes safety functions of safety systems and operator actions. Success criteria of each safety system need to be determined by thermal hydraulic analysis or expert judgment.

    (3) Systems analysis

    This technical element is to model the systems failures which are identified in the accident sequence analysis, by using the fault tree analysis technique. Fault trees are developed to provide a logical failure model for different systems.

    (4) Human reliability analysis

    This technical element is to identify human errors which may contribute to core damage. Human errors include three types which occur before the initiating events occur, which lead to the occurrence of an initiating event, and which occur after the initiating events occur.

    (5) Data analysis

    Data required for PSA include initiating events frequencies, equipment reliability, and availability data, human reliability data, common cause failure data,etc., are used to implement the quantification analysis of PSA model.

    (6) Quantification analysis

    This technical element employs a computer code to calculate the numerical results of the PSA model. Results derived from PSA include: CDF, LERF, uncertainty results of CDF and LERF, importance measures, and sensitivity measures.

    CDF and LERF can be regarded as the metrics of plant safety level. Based on CDF and LERF, other risk metrics such as incremental core damage probability (ICDP), and incremental large early release probability (ILERP) can be calculated.

    These results, so-called the risk insights, are mainly used to support the decision-making of plant safety issues, plant operation and maintenance as well as the optimization of relevant management programs or procedures involving technical specification, testing or maintenance program.

    2 Technical Specification and Nuclear Power Plant Operation

    Technical specification is an important document used for nuclear safety regulation in nuclear power plant, and the technical specification defines the basic technical requirements for the unit to meet. It has the following functions:

    (1) define the limits for normal operation to ensure that the reactor is operated as it is designed;

    (2) define the essential safety functions;

    (3) when the reactor runs out of the limits or some safety functions are inoperable, the required control strategies are defined to modify the situation. A completion time and a mode according to fallback to are also usually defined.

    Figure 1[3]below is an example to show how technical specification is used in nuclear power plant operation.

    Fig.1 Part of a technical specification

    Technical specification requires that both the two trains(X and Y) of a system shall be operable. When the plant fails to meet this requirement, which means that one or two trains become inoperable, the requirements in Fig.1 shall be met to ensure that the plant keeps sufficient safety margin. The requirements in Fig.1 include actions need to be taken and the allowed outage time (the same as the completion time), for each condition.

    According to Fig.1:

    if one function X train is inoperable, then the condition A is entered and the operator shall restore the X train to operable status within 7 d;

    if one function Y train is inoperable, then the condition B is entered and the operator shall restore the Y train to operable status within 72 h;

    if both of the two trains are inoperable, then the condition C is entered and the operator shall restore one of the two trains within 72 h. If required action C.2 is completed within the specified completion time, then conditions B and C are exited, and the plant enters condition A; operator shall continue to follow the requirements for condition A.

    At present, technical specification is basically developed on the basis of traditional deterministic methodology. With the operational experience accumulated and safety analysis technique developed, the traditional deterministic methodology has increasingly exposed its inherent limitation and conservation. For instance, this traditional method considers the system and equipment reliability as well as the frequency of accident occurrence too conservative. Besides, it is not able to comprehensively and systematically evaluate the entire risk of the nuclear power plante. In addition, for some cases, following the traditional technical specification may even lead the plant to a more dangerous condition. Actually, the practical experience has indicated that the traditional technical specification integrated with the deterministic methodology shows too conservative and possesses unreasonable clauses that severely restrict the flexibility of plant operation and are not conducive to improving the plant achievements.

    3 Application of Risk Assessment and Management in Nuclear Power Plant Operation

    The risk assessment and risk management technology combined with PSA have been put into use at a large scale in the nuclear industry, of which one crucial application is the exertion into technical specification. The technology connected PSA with technical specification is called risk informed technical specification whose overall objective is to extend the plant operational flexibility with risk assessment and risk management, making the operational mode change and shutdown more reasonable.

    Regulators and utilities in many countries have identified several initiatives to optimize technical specification by using PSA technique. Some of these initiatives are described as below[4].

    Preferred end states: this initiative allows, after a risk assessment, some systems to enter hot shutdown rather than cold shutdown to repair equipment.

    Risk-informed treatment of missed surveillances: this initiative allows licensee to use a structured, objective process to evaluate the risk implications of the missed surveillance test which is required by the technical specification; if the risk impact is not significant, the plant is allowed to continue operating.

    Risk-informed mode change: licensees can justify a mode change when not all of the requirements for this mode change are met. This process allows concurrent operational activities to continue to make a more effective mode change plan.

    Risk-informed allowed outage times(AOT): this initiative allows licensees to extend the AOTs for some components in technical specification, or provides a process to allow the licensees to control the AOTs in technical specification, which means that change in AOTs will not need the approval of the regulator.

    Risk-informed surveillance frequencies control program(RISFCP): this initiative is similar to the risk-informed AOT. The RISFCP allows licensees to extend the surveillance test intervals (STIs) for some components, or provides a licensee-controlled process to determine the STIs.

    This paper emphasizes on the introduction to the risk informed AOT.

    3.1 Use of PSA to extend allowed outage time in technical specification

    Technical specification specifies the allowed outage time when some components are inoperable, the AOTs in the traditional technical specification are determined in a very conservative way. On one hand, this may limit the flexibility of plant operation; on the other hand, unnecessary mode change will increase unexpected transient risk.

    The AOTs in technical specification can be optimized with the help of PSA. A four-step approach is identified to evaluate proposed changes to AOTs in the technical specification, which is shown as follows.

    Step 1: define the proposed changes.

    The first step is to determine the proposed change to the AOT, and the affected systems, components, or parameters modeled in the PSA model and all elements in the PSA that the change impacts should be determined. A description of the proposed change should include the information above.

    Step 2: perform engineering analysis.

    The second step is to perform an engineering analysis on the impact of the proposed change. Engineering analysis include two aspects: traditional deterministic analysis and probabilistic analysis.

    For the traditional deterministic analysis, the proposed AOT change should be examined to verify that it meets the existing applicable rules and regulations. And the licensee should determine how the change impacts defense-in-depth aspects of the plant’s design and operation and determine the impact on the adequacy of safety margins. In addition, the licensee should consider how plant and industry operating experience relates to the proposed change.

    For the probabilistic analysis, the licensee should perform risk-informed evaluations of the proposed change to determine the impact on plant risk. In the evaluation, the specific plant equipment affected by the proposed AOT change should be explicitly considered, and also the impacts of the proposed change on the functionality, reliability, and availability of the affected equipment, and also human error probabilities.

    A three-tier analysis approach[1]is developed to perform the probabilistic analysis, and each of these three tiers is described below.

    Tier 1: quantitative analysis of risk impact

    Quantitative analysis of the impact on plant risk of AOT change is calculated by the PSA model, and ICDP and ILERP are the risk metrics which are needed to extend the AOT. The equations are as follows:

    ICDP=(CDF1-CDF0)△T,
    ILERP=(LERF1-LERF0)△T,

    where △Tis the individual allowed outage time;CDF0is the baseline CDF with nominal expected equipment unavailability; CDF1is the conditional CDF with the subject equipment out of service and nominal expected equipment unavailability for other equipment permitted to be out of service by the Technical Specification; LERF0is the baseline LERF with nominal expected equipment unavailability; LERF1is the conditional LERF with the subject equipment out of service and nominal expected equipment unavailability for other equipment permitted to be out of service by the technical specification.

    The meaning of ICDP is the incremental probability of the occurrence of core damage event during the time when the component is inoperable. ILERP is similar to ICDP and refers to the large early release event. The acceptable criterion for ICDP and ILERP is: ICDP<1.0E-6 with ILERP<1.0E-7.

    If the proposed AOT can satisfy the above acceptable criterion, the AOT is considered reasonable.

    Tier 2: identification of risk-significant plant configurations

    Based on Tier 1 analysis, an identification of potential high-risk configurations that could exist if equipment, in addition to that associated with the AOT change, was to be taken out of service simultaneously, was also involved. The objective of this analysis is to ensure that appropriate restrictions on risk-significant configurations associated with the change are in place, then the risk-significant configurations can be eliminated.

    Tier 3: risk-informed configuration risk management

    Because many random failures of equipment and many emergency events may happen during the plant operation, not all of the risk-significant configuration can be identified in the Tier 2 analysis. This requires the plant to have the ability to access the real time risk based on the different configurations, and also the ability to manage the risk. A software called risk monitor is developed to provide this ability and a program called configuration risk management program is developed to guide the plant how to use the risk monitor.

    Step 3: define implementation and monitoring program

    This step is to ensure that no adverse safety degradation occurs because of the AOT change and also to ensure that the engineering evaluation conducted to examine the impact of the proposed changes continues to reflect the actual reliability and availability of related component. The licensee should consider implementation and performance monitoring strategies.

    Step 4: submit proposed change

    The final step is about documentation of the above analysis and submitting the license amendment request.

    3.2 Risk managed Tech-Spec

    After many successful cases of AOT extension by using PSA, much experience has been gained by both the industry and regulators; it is time to develop a new method which can give the plant more flexibility to use Tech-Spec, and this new method is called risk managed Tech-Spec[5]. By use of RMTS, plant can control the AOT by itself based on the calculation of plant risk.

    ICDP is the risk metric in RMTS, and two thresholds are set for ICDP. 1E-5 is used to calculate a risk-informed CT(RICT, notice that when RICT is larger than 30 d, 30 d is set as the RIAOT); 1E-6 is used to calculate a risk management action time (RMAT), which means that when ICDP is larger than 1E-6, the plant should implement some actions to control the risk.

    Figure 2 below provides a simple example of the RMTS process, and this example is intended to explicitly demonstrate the application of these metrics in an RMTS program.

    Fig.2 The RMTS process

    At the beginning, component A becomes inoperable for a duration anticipated to exceed the AOT in the Tech-Spec. In this configuration, RMAT and RICT are calculated. As evident in the figure, the RMAT would be exceeded at day 7. If the anticipated duration of the activity exceeds this time, appropriate compensatory risk management actions will be developed and implemented. Since the 1E-5 ICDP threshold is not reached within 30 d, the RICT is revised to be 30 d.

    At day 5, component B becomes inoperable which makes the plant enter a new configuration. At this time, the RMTS requires recalculation of the RMAT and RICT to apply to this new plant configuration. RMAT now occurs very soon after the emergent event occurs, approximately 6 d. Since the 1E-5 ICDP threshold is reached at day 27, the RICT is revised to be 27 d.

    At day 21, component B is back to be operable. At this time, the RICT may be recalculated to reflect the new plant configuration. In this configuration, the 1E-5 ICDP is not reached until the 30 d back-stop CT. The RICT for system 1 may now be reset to 30 d from the time the first system became inoperable. Also, notice that since ICDP is greater than the 1E-6 threshold, no need to recalculate the new RMAT but implementation of appropriate risk management actions continues to be required.

    4 Application Case

    This section elaborates the application of risk assessment and risk management in the plant operation mentioned above through a specific case.

    Auxiliary feedwater system (AFW) is a vital system in the plant. When losing the main feedwater, AFW system can provide feedwater to steam generator to remove the heat generated from primary reactor coolant system. AFW system has two motor-driven pumps and one turbine driven pump with two parallel steam inlet lines for supplying steam to the turbine. Both of the two steam inlet lines can assure the steam supply for the turbine. If both the two lines fail to work, the turbine will lose steam supply, which makes the turbine driven pump breakdown.

    The current technical specification[6]only requires that the unit should fall back to a lower mode within 24 h (AOT) when the turbine driven pump is inoperable. However, in practical operation, the operators often meet the situation that only one steam inlet line fails, and this situation will lead to two different views. Some operators think that AFW system is an important safety system, and one steam inlet line failure can degrade the system, so the turbine pump should be considered inoperable from a conservative perspective; other operators deem that one steam inlet line failure does not lead to inoperable of turbine driven pump because there’s still another inlet line, it’s too conservative to consider the pump inoperable, and the unnecessary unit mode change will cause unexpected transient risk. The inconsistent standpoints may cause some problems to the safety operation of the plant.

    Thus, the plant uses the risk assessment and management technique mentioned in Section 3.1 to optimize technical specification. A specific term is added in the technical specification, which requires the unit to fall back to a lower mode within 7 d when only one steam inlet line is inoperable. The AOT of 7 d is set by calculating plant risk using PSA.

    Another factor that should be taken into account is that the steam inlet line needs to be isolated when it is maintained, and the isolation of one inlet line will cause another line inoperable, which leads to the inoperable of turbine driven pump.

    For this situation, the plant can use the RMTS technique described in Section 3.2. For example, one steam inlet line is found inoperable at 8:00 am on day 1, the turbine driven pump will be inoperable when the operators maintain the inlet line. But, the meteorological department forecasts that the typhoon would land in the area of this plant at 12:00 on day 1 and the typhoon will last for about one day, until 12:00 on day 2. According to the plant procedures, no maintenance activity should be carried out during typhoon.

    In this case, if the steam inlet line is maintained immediately after being found inoperable, it will cause the turbine driven pump being inoperable for a time period larger than 24 h, and this will violate the requirement of technical specification. By using RMTS technique, the plant can temporarily stay at the configuration with the steam inlet line inoperable until the typhoon is gone (e.g., 18:00 on day 2), then the operators can isolate and maintain the inlet line; during the maintenance the plant is at a configuration with the turbine driven pump inoperable.

    Now we look back at Fig.2, we can find that, one steam inlet line inoperable can be regarded as component A inoperable, and turbine driven pump inoperable can be regarded as components A and B inoperable, because the inoperable of the pump is caused by the inoperable of both two inlet lines.

    This is a typical use of RMTS to support plant operation.

    Besides the external factors (e.g., weather), there are some other conditions which can influence plant operation, such as the shortage of manpower may occur when dealing with some emergency events. During that time, the plant can also use risk assessment and management technique to allocate resources more reasonably and effectively.

    All of these applications of risk assessment and risk management will improve the safety and flexibility of plant operation.

    5 Conclusions

    Via the description of each section mentioned above in this paper, the risk assessment and risk management on the basis of PSA play an important role in the operation of nuclear power plants. This technique can improve the flexibility of plant operation, and increase the efficiency of plant resources. It can also ensure that the plant has the ability to analyze and manage plant risk, and enhance the safety level of plant operation. Application of risk assessment and risk management in nuclear power plant operation has been widely implemented all over the world, and it is also proved that the performance of nuclear power plant has been largely improved. So we believe that in the future, this technique will be more widely applied in the nuclear industry.

    [1] RG1.177. U.S. NRC, An Approach for Plant Specific, Risk Informed Decision-making: Technical Specifications[S].

    [2] DS394. Development and Application of Level 1 Probabilistic Safety Assessment for Nuclear Power Plants[S].

    [3] NUREG-1431. Standard Technical Specifications Westinghouse Plants[S].

    [4] SECY-07-0191. Update of the Risk-informed Regulation Implementation Plan[S].

    [5] NEI 06-09. Risk-Managed Technical Specification Guidelines[S].

    [6] D-TD/GNP/310. GNPS Document Justification of the Operating Technical Specifications[S].

    1672-5220(2014)06-0895-04

    Received date: 2014-08-08

    *Correspondence should be addressed to QIU Yan-rong, E-mail: qiuyanrong@chinansc.cn

    CLC number:TL 364.+5 Document code: A

    99国产综合亚洲精品| 午夜激情福利司机影院| 在线视频色国产色| 悠悠久久av| 一级毛片高清免费大全| 中出人妻视频一区二区| 两个人视频免费观看高清| 欧美av亚洲av综合av国产av| 日韩精品中文字幕看吧| 色视频www国产| 这个男人来自地球电影免费观看| www.999成人在线观看| 欧美午夜高清在线| 日本免费一区二区三区高清不卡| 欧美激情久久久久久爽电影| 国产aⅴ精品一区二区三区波| 99精品久久久久人妻精品| 日韩av在线大香蕉| 国产精品九九99| 国产精品av视频在线免费观看| 大型黄色视频在线免费观看| 成人高潮视频无遮挡免费网站| 欧美高清成人免费视频www| 精品99又大又爽又粗少妇毛片 | 18禁国产床啪视频网站| 欧美在线黄色| 久久久久亚洲av毛片大全| 又紧又爽又黄一区二区| 亚洲欧美日韩东京热| 在线观看舔阴道视频| 啦啦啦观看免费观看视频高清| 欧美成人免费av一区二区三区| 好男人在线观看高清免费视频| 久久性视频一级片| 久久这里只有精品19| 亚洲男人的天堂狠狠| 国产又黄又爽又无遮挡在线| 美女扒开内裤让男人捅视频| 久久久国产成人精品二区| 成人av在线播放网站| 欧美日韩一级在线毛片| 精品无人区乱码1区二区| 欧美乱妇无乱码| 亚洲人与动物交配视频| 色视频www国产| 黑人欧美特级aaaaaa片| 久久精品亚洲精品国产色婷小说| 老司机在亚洲福利影院| 亚洲成人久久性| 搡老岳熟女国产| 97超视频在线观看视频| 久久精品综合一区二区三区| 18禁美女被吸乳视频| 给我免费播放毛片高清在线观看| 97超级碰碰碰精品色视频在线观看| 国内久久婷婷六月综合欲色啪| 天堂影院成人在线观看| 中文字幕av在线有码专区| 手机成人av网站| 人妻夜夜爽99麻豆av| 五月伊人婷婷丁香| 中文字幕人成人乱码亚洲影| 黄片小视频在线播放| 在线免费观看的www视频| 久久精品综合一区二区三区| 国产伦人伦偷精品视频| 久久久国产成人免费| 久久久久性生活片| 国产精品永久免费网站| 真实男女啪啪啪动态图| 色老头精品视频在线观看| 久久精品91蜜桃| 免费av不卡在线播放| 国内少妇人妻偷人精品xxx网站 | 制服丝袜大香蕉在线| 精品免费久久久久久久清纯| 亚洲狠狠婷婷综合久久图片| or卡值多少钱| 成在线人永久免费视频| 麻豆国产97在线/欧美| 欧美性猛交黑人性爽| 男女床上黄色一级片免费看| 18禁国产床啪视频网站| 丰满人妻一区二区三区视频av | 国产av麻豆久久久久久久| 精品一区二区三区av网在线观看| 欧美大码av| 久久热在线av| 欧美大码av| 午夜成年电影在线免费观看| 亚洲男人的天堂狠狠| 99热6这里只有精品| 男插女下体视频免费在线播放| 国内毛片毛片毛片毛片毛片| 国产黄a三级三级三级人| 久久这里只有精品中国| av国产免费在线观看| 少妇丰满av| 村上凉子中文字幕在线| 国产三级中文精品| 亚洲精品在线观看二区| 999久久久国产精品视频| 婷婷精品国产亚洲av在线| 国产三级中文精品| 亚洲国产精品sss在线观看| 国产高清视频在线观看网站| 岛国在线免费视频观看| 亚洲成人久久爱视频| 一卡2卡三卡四卡精品乱码亚洲| 日韩有码中文字幕| 夜夜夜夜夜久久久久| 亚洲人成网站高清观看| 成人国产综合亚洲| 欧美一区二区精品小视频在线| 97碰自拍视频| 少妇丰满av| 日韩欧美三级三区| 国产高清激情床上av| 日韩成人在线观看一区二区三区| 亚洲av美国av| 悠悠久久av| 国产精品影院久久| 人人妻人人澡欧美一区二区| 久久久国产欧美日韩av| 巨乳人妻的诱惑在线观看| 欧美日本亚洲视频在线播放| 我的老师免费观看完整版| 一区二区三区高清视频在线| 国产一区二区三区视频了| 国产乱人视频| 国产精品久久久久久亚洲av鲁大| 亚洲精品在线观看二区| 97人妻精品一区二区三区麻豆| 人人妻,人人澡人人爽秒播| 黄色 视频免费看| 波多野结衣高清无吗| 人人妻,人人澡人人爽秒播| 国产精品久久久久久亚洲av鲁大| 欧美在线黄色| 国产私拍福利视频在线观看| 亚洲欧洲精品一区二区精品久久久| 啦啦啦韩国在线观看视频| h日本视频在线播放| 婷婷精品国产亚洲av在线| 女生性感内裤真人,穿戴方法视频| 久久久久九九精品影院| 色综合欧美亚洲国产小说| av片东京热男人的天堂| 久久天堂一区二区三区四区| 亚洲熟妇熟女久久| 视频区欧美日本亚洲| 久久精品91无色码中文字幕| 精品乱码久久久久久99久播| 床上黄色一级片| 综合色av麻豆| 搡老妇女老女人老熟妇| 99riav亚洲国产免费| 毛片女人毛片| 欧美色视频一区免费| 成人无遮挡网站| 这个男人来自地球电影免费观看| 中文字幕熟女人妻在线| 免费看美女性在线毛片视频| 欧美黑人巨大hd| 欧美乱妇无乱码| 中文字幕精品亚洲无线码一区| 少妇的丰满在线观看| 精品久久蜜臀av无| 在线播放国产精品三级| 国产在线精品亚洲第一网站| 看免费av毛片| 看黄色毛片网站| 久久精品亚洲精品国产色婷小说| 亚洲国产精品合色在线| h日本视频在线播放| 午夜福利在线观看免费完整高清在 | ponron亚洲| 黄色 视频免费看| 成人国产一区最新在线观看| 97碰自拍视频| 欧美在线黄色| 亚洲激情在线av| 亚洲av日韩精品久久久久久密| 免费观看人在逋| 真人一进一出gif抽搐免费| 99久久精品国产亚洲精品| av黄色大香蕉| 人人妻人人看人人澡| 免费看光身美女| 999精品在线视频| 亚洲欧美日韩无卡精品| 国产高清激情床上av| 亚洲国产欧美人成| 国产成人精品久久二区二区91| 国产精华一区二区三区| 国产成人欧美在线观看| 观看免费一级毛片| 看片在线看免费视频| 欧美激情久久久久久爽电影| 精品不卡国产一区二区三区| 两个人的视频大全免费| 午夜福利欧美成人| 天堂√8在线中文| 国产高清有码在线观看视频| 禁无遮挡网站| 女人被狂操c到高潮| 99热这里只有是精品50| 超碰成人久久| 国产精品亚洲一级av第二区| 日韩欧美国产一区二区入口| 香蕉av资源在线| 亚洲av日韩精品久久久久久密| 国产精品av久久久久免费| 精品久久久久久久末码| 99久久国产精品久久久| 午夜久久久久精精品| 91老司机精品| 亚洲国产日韩欧美精品在线观看 | 色综合欧美亚洲国产小说| xxx96com| 亚洲一区二区三区不卡视频| 中文亚洲av片在线观看爽| av中文乱码字幕在线| 久久久成人免费电影| 亚洲中文av在线| 精品免费久久久久久久清纯| 女警被强在线播放| 99热这里只有精品一区 | 日本成人三级电影网站| 日韩欧美精品v在线| 美女午夜性视频免费| 亚洲精品美女久久av网站| 两个人视频免费观看高清| 亚洲人与动物交配视频| 老司机福利观看| 怎么达到女性高潮| 亚洲午夜理论影院| 成年版毛片免费区| 老熟妇仑乱视频hdxx| 少妇人妻一区二区三区视频| 99精品欧美一区二区三区四区| 嫩草影院精品99| 性色avwww在线观看| 欧美色欧美亚洲另类二区| 男女那种视频在线观看| 国语自产精品视频在线第100页| 亚洲 欧美 日韩 在线 免费| 国产精品久久久久久精品电影| 老鸭窝网址在线观看| 欧美另类亚洲清纯唯美| 国产毛片a区久久久久| 少妇丰满av| 中国美女看黄片| 国产精品永久免费网站| 亚洲va日本ⅴa欧美va伊人久久| 人人妻,人人澡人人爽秒播| 性色av乱码一区二区三区2| 久久这里只有精品19| xxx96com| av天堂中文字幕网| 少妇人妻一区二区三区视频| 久久中文字幕一级| 亚洲欧美精品综合久久99| 黄色日韩在线| 国内精品一区二区在线观看| 日韩欧美 国产精品| 男人舔女人的私密视频| 午夜影院日韩av| 亚洲国产欧美网| 好男人电影高清在线观看| 成人特级av手机在线观看| 婷婷丁香在线五月| 国产午夜福利久久久久久| 99在线人妻在线中文字幕| 在线观看免费午夜福利视频| 亚洲av成人一区二区三| av在线蜜桃| 淫秽高清视频在线观看| 两人在一起打扑克的视频| 久久久久久久久中文| 好男人电影高清在线观看| 免费大片18禁| 麻豆成人午夜福利视频| 搡老熟女国产l中国老女人| 日韩欧美精品v在线| 亚洲国产欧美一区二区综合| 国产 一区 欧美 日韩| 身体一侧抽搐| 黄频高清免费视频| 国内久久婷婷六月综合欲色啪| 欧美日韩综合久久久久久 | 日韩免费av在线播放| 免费大片18禁| www.熟女人妻精品国产| 精品不卡国产一区二区三区| 国产成年人精品一区二区| 三级毛片av免费| 不卡av一区二区三区| 男女做爰动态图高潮gif福利片| 日韩高清综合在线| 淫妇啪啪啪对白视频| 亚洲av成人不卡在线观看播放网| 免费观看人在逋| 欧美大码av| ponron亚洲| 色吧在线观看| 精品一区二区三区四区五区乱码| 9191精品国产免费久久| 一a级毛片在线观看| 99久久无色码亚洲精品果冻| 一本精品99久久精品77| 国产午夜福利久久久久久| 亚洲熟妇中文字幕五十中出| 99riav亚洲国产免费| e午夜精品久久久久久久| 搞女人的毛片| 村上凉子中文字幕在线| 国产成人精品无人区| 高清在线国产一区| 老司机在亚洲福利影院| 岛国视频午夜一区免费看| av女优亚洲男人天堂 | 久久天堂一区二区三区四区| 一本久久中文字幕| 精品久久久久久久人妻蜜臀av| 亚洲自拍偷在线| 午夜亚洲福利在线播放| 亚洲一区高清亚洲精品| 国产伦一二天堂av在线观看| 成年女人看的毛片在线观看| 国产精品爽爽va在线观看网站| 99久久精品国产亚洲精品| 亚洲av成人一区二区三| 人人妻,人人澡人人爽秒播| 最近视频中文字幕2019在线8| aaaaa片日本免费| 国产精品一区二区精品视频观看| 黄色女人牲交| 熟女人妻精品中文字幕| 老司机深夜福利视频在线观看| 美女大奶头视频| 麻豆av在线久日| 国产欧美日韩精品一区二区| 欧美日本亚洲视频在线播放| 国产精品久久久久久人妻精品电影| 国产又黄又爽又无遮挡在线| 国内精品美女久久久久久| 麻豆国产97在线/欧美| 欧美3d第一页| 国产精品99久久99久久久不卡| 精品乱码久久久久久99久播| 可以在线观看的亚洲视频| 欧美日本视频| 搡老岳熟女国产| 欧美xxxx黑人xx丫x性爽| 最新美女视频免费是黄的| 亚洲成人久久性| 国产精品av久久久久免费| 中文字幕精品亚洲无线码一区| 人人妻人人看人人澡| 午夜福利在线在线| 琪琪午夜伦伦电影理论片6080| 在线看三级毛片| 国产午夜精品论理片| 色噜噜av男人的天堂激情| 免费搜索国产男女视频| 午夜成年电影在线免费观看| 午夜福利成人在线免费观看| 国产亚洲精品av在线| 日韩 欧美 亚洲 中文字幕| 男女视频在线观看网站免费| 人妻丰满熟妇av一区二区三区| 亚洲成人久久性| 黄频高清免费视频| 久久人妻av系列| 国产三级中文精品| 一个人免费在线观看电影 | 亚洲中文字幕一区二区三区有码在线看 | 变态另类丝袜制服| 日韩有码中文字幕| 午夜日韩欧美国产| 中文字幕人成人乱码亚洲影| 久久久久国内视频| 国内精品久久久久精免费| 婷婷精品国产亚洲av在线| 亚洲精品中文字幕一二三四区| 午夜成年电影在线免费观看| 国产精品亚洲一级av第二区| 97超视频在线观看视频| 狂野欧美白嫩少妇大欣赏| 日韩精品中文字幕看吧| 美女高潮喷水抽搐中文字幕| 国产成人aa在线观看| 白带黄色成豆腐渣| 十八禁网站免费在线| 亚洲成a人片在线一区二区| 欧美不卡视频在线免费观看| 亚洲av免费在线观看| 熟女人妻精品中文字幕| 亚洲欧美日韩东京热| 丰满的人妻完整版| 久久午夜亚洲精品久久| 欧美乱码精品一区二区三区| 91av网一区二区| 午夜精品久久久久久毛片777| 中文字幕久久专区| 国产真人三级小视频在线观看| 丝袜人妻中文字幕| 日韩欧美在线乱码| 国产精品av视频在线免费观看| 久久久国产成人免费| 不卡av一区二区三区| 精品乱码久久久久久99久播| 免费在线观看成人毛片| 欧美激情久久久久久爽电影| 深夜精品福利| 精品久久蜜臀av无| 欧美三级亚洲精品| 90打野战视频偷拍视频| 精品日产1卡2卡| 人妻夜夜爽99麻豆av| 亚洲精品中文字幕一二三四区| 精品一区二区三区av网在线观看| 97碰自拍视频| 久久天躁狠狠躁夜夜2o2o| 99精品在免费线老司机午夜| 日韩 欧美 亚洲 中文字幕| 青草久久国产| 国产亚洲精品一区二区www| 黄片小视频在线播放| 亚洲成a人片在线一区二区| 久久国产精品影院| 床上黄色一级片| 亚洲欧美精品综合久久99| 每晚都被弄得嗷嗷叫到高潮| 黄频高清免费视频| 精品久久久久久久久久久久久| av中文乱码字幕在线| 亚洲精华国产精华精| 美女被艹到高潮喷水动态| 国产一区在线观看成人免费| 亚洲欧美日韩卡通动漫| 国产av麻豆久久久久久久| 国产精品久久久av美女十八| 美女cb高潮喷水在线观看 | 国产野战对白在线观看| 麻豆一二三区av精品| 香蕉av资源在线| 欧美日韩福利视频一区二区| 又紧又爽又黄一区二区| 亚洲av成人av| 人妻久久中文字幕网| av在线蜜桃| av视频在线观看入口| 国产精品电影一区二区三区| 午夜福利欧美成人| 最近在线观看免费完整版| 国产精品乱码一区二三区的特点| 日韩欧美三级三区| 色av中文字幕| 国产99白浆流出| 国产精品女同一区二区软件 | 日本三级黄在线观看| 婷婷精品国产亚洲av在线| 久久性视频一级片| 国产精品一区二区三区四区免费观看 | 中国美女看黄片| 好看av亚洲va欧美ⅴa在| 亚洲av美国av| 99久久综合精品五月天人人| 国产乱人视频| 亚洲国产欧美一区二区综合| 韩国av一区二区三区四区| 一二三四社区在线视频社区8| 精品久久蜜臀av无| av在线蜜桃| 色播亚洲综合网| 久久久久久久久中文| 欧美午夜高清在线| 亚洲第一欧美日韩一区二区三区| 亚洲一区二区三区色噜噜| 免费人成视频x8x8入口观看| 亚洲中文日韩欧美视频| 日韩欧美一区二区三区在线观看| 免费在线观看亚洲国产| 欧美三级亚洲精品| 狠狠狠狠99中文字幕| 小蜜桃在线观看免费完整版高清| 18禁国产床啪视频网站| 亚洲精品456在线播放app | 小说图片视频综合网站| 天天添夜夜摸| 精品一区二区三区av网在线观看| 中文字幕人成人乱码亚洲影| bbb黄色大片| 小说图片视频综合网站| 日韩欧美免费精品| 久久久精品大字幕| 少妇丰满av| 欧美丝袜亚洲另类 | 国产精品国产高清国产av| 麻豆国产97在线/欧美| 最近最新中文字幕大全电影3| 亚洲欧美日韩无卡精品| 男人和女人高潮做爰伦理| 天天一区二区日本电影三级| 哪里可以看免费的av片| 伦理电影免费视频| 美女免费视频网站| 可以在线观看的亚洲视频| 亚洲成人免费电影在线观看| а√天堂www在线а√下载| 看黄色毛片网站| 十八禁网站免费在线| 国产精品久久电影中文字幕| 日韩av在线大香蕉| 99热6这里只有精品| 麻豆久久精品国产亚洲av| 又大又爽又粗| 欧美日韩瑟瑟在线播放| 90打野战视频偷拍视频| 国产精品电影一区二区三区| 精品乱码久久久久久99久播| 成人三级做爰电影| 99国产极品粉嫩在线观看| 真人一进一出gif抽搐免费| 精品不卡国产一区二区三区| 最近最新中文字幕大全免费视频| 国产av麻豆久久久久久久| 欧美黑人欧美精品刺激| www.熟女人妻精品国产| 久久精品夜夜夜夜夜久久蜜豆| 美女高潮的动态| 大型黄色视频在线免费观看| 免费观看的影片在线观看| 一二三四在线观看免费中文在| 少妇裸体淫交视频免费看高清| 精品久久久久久成人av| 99视频精品全部免费 在线 | 久久久久久久久免费视频了| 热99在线观看视频| 少妇的丰满在线观看| 女人高潮潮喷娇喘18禁视频| 欧美日韩一级在线毛片| 免费在线观看影片大全网站| 又大又爽又粗| 免费av不卡在线播放| 一个人观看的视频www高清免费观看 | 午夜成年电影在线免费观看| 97人妻精品一区二区三区麻豆| 久久久久性生活片| 亚洲专区中文字幕在线| 别揉我奶头~嗯~啊~动态视频| 身体一侧抽搐| 欧美成狂野欧美在线观看| 九九在线视频观看精品| 国产精品 国内视频| 一个人看的www免费观看视频| 国产亚洲av嫩草精品影院| www日本在线高清视频| 制服丝袜大香蕉在线| 亚洲午夜理论影院| 亚洲av电影在线进入| 黑人操中国人逼视频| 亚洲性夜色夜夜综合| 久久精品国产综合久久久| or卡值多少钱| 欧美日本视频| 极品教师在线免费播放| 亚洲一区二区三区不卡视频| 亚洲狠狠婷婷综合久久图片| 亚洲av片天天在线观看| 午夜福利免费观看在线| 亚洲国产欧美网| 99国产综合亚洲精品| 国产伦一二天堂av在线观看| 免费观看人在逋| 国产精华一区二区三区| 黑人巨大精品欧美一区二区mp4| 国产成人影院久久av| 国产一区二区三区视频了| 热99re8久久精品国产| 日本五十路高清| 欧美黄色淫秽网站| 国产三级在线视频| 女人被狂操c到高潮| 少妇人妻一区二区三区视频| 两性午夜刺激爽爽歪歪视频在线观看| 亚洲18禁久久av| 国产成人av激情在线播放| 亚洲精品美女久久av网站| 国产1区2区3区精品| 国产一区二区三区在线臀色熟女| 午夜日韩欧美国产| 国产精品女同一区二区软件 | 成人精品一区二区免费| 亚洲中文av在线| 91九色精品人成在线观看| 性色av乱码一区二区三区2| 亚洲欧美日韩东京热| 亚洲欧美日韩卡通动漫| 亚洲色图av天堂| 亚洲成av人片免费观看| 嫩草影视91久久| 99久国产av精品| 亚洲美女视频黄频| 久久热在线av| 亚洲av日韩精品久久久久久密| 两性午夜刺激爽爽歪歪视频在线观看| 成人无遮挡网站| 久久久久久人人人人人| 国产69精品久久久久777片 | 99久久成人亚洲精品观看| 亚洲国产欧洲综合997久久,| 99国产精品99久久久久|