    Cold Thermal Storage and Peak Load Reduction for Office Buildings in Saudi Arabia

    2014-07-29 09:43:12NabilAbdelShafiRamzyObaidandIbrahimJomoah

    Nabil Y.Abdel-Shafi,Ramzy R.Obaid,and Ibrahim M.Jomoah

    1.Introduction

    Over the last decade,the demand for comfort cooling systems has been rapidly increasing in the Kingdom of Saudi Arabia(KSA)due to improved living standards.The demand for electricity in KSA is continuously increasing,growing at an average rate of 8% per year,the world average being 2.7%.It has been reported that 20~40 billion SR(Saudi Rial)investment per year would be required to the electrical infrastructure in the coming years if the projected growth in demand is not blocked.In KSA,the peak electricity demand increased by 10% from 30 GW in 2005 to 48 GW in 2011.In 2021,as shown in Fig.1,the peak demand will reach 75 GW,an increase of 5.4%compared to 2011[1].A major portion of this load is compounded by artificially low energy prices and a hot climate,both of which encourage more energy consumption.Fig.2 shows the measured average values of monthly electrical energy consumption in the City of Jeddah in the year 2011.It can be observed that the summer months between June and October have consistently higher loads than the non-summer months,and this is in primarily due to the air conditioning(AC)load.Moreover,it has been estimated that 70% to 75% of the total energy consumption in KSA is used for indoor AC,often during the hours of peak power demand.The cooling load is observed to be at its peak in KSA during the period from 13:00 hours to 17:00 hours.

    Fig.1.Variation of yearly peak load demand in KSA.

    Fig.2.Variation of monthly average load demand of Jeddah city in the year 2011.

    Thermal energy storage(TES)is considered to be one of most advanced energy technologies and increasing attention has been devoted to the utilization of this essential technique for AC applications[2],[3].In recent years,a number of cold storage systems such as chilled water storage,ice storage,and eutectic salts storage have been developed.Water is chilled or ice is made during the night to either replace or augment building cooling equipment during the day.Cold thermal energy storage(CTES)can either be full storage systems,where all on-peak cooling loads are satisfied from storage,or partial storage systems,where all cooling loads above a certain level are satisfied from storage.It is estimated that the power consumption for AC systems in USA is about 36% of the electric power supplied to office and commercial buildings.Therefore,the savings for the consumers and the power company may be billions of dollars per year,if ice thermal storage systems are used for new installations and retrofit[4].

    Many studies have been carried out by various researchers in the field of CTES systems.Laybourn et al.[5],has described an ice storage unit in an 1865 m2single story office building in California,and has shown its ability to shift the peak demand of the building,while maintaining the cooling requirements.Liu et al.compared the field performance of TES systems with the conventional systems[6].The field data for several TES sites have been analyzed by using a ‘mean-day’ and ‘peak-day’ approach.Energy usage,direct power costs of ice,chilled water,and eutectic salt systems have been compared to that of conventional systems and have concluded that the TES systems is better than other systems.Hasnain et al[7].discussed the means of reducing the peak electrical demand in large Saudi office buildings by using CTES.It was observed that the incorporation of a partial ice storage system in office buildings in the city of Riyadh(KSA)can reduce the peak time electrical power demand and the peak time cooling load in the range of 10% to 20% and 30% to 40%,respectively.Also Sebzali has studied the impact on the energy performance of air cooled chillers of using ice cold thermal storage with different operating strategies in Kuwait[8].

    Numerous economic studies and cost analysis of CTES systems and their practical applications have been undertaken by many researches.Navon et al.and Fang et al.have discussed the economic aspects of the optimal design for AC with thermal energy[9],[10].Moreover,Habeebullah has investigated the economic feasibility of retrofitting an ice thermal storage system for the AC plant of the Grand Holy Mosque of Makah in Saudi Arabia[11].The capital recovery factor was calculated for 10% interest rate and the payback period of 10 years.Full and partial load storage scenarios have been considered.The results have shown that with the current fixed electricity rate,there is no gain in the introduction ice storage systems for both storage schemes.

    Combined utilization of an incentive tariff model and storage technology has shown reasonable daily savings for full load storing scheme.However,savings out of partial load storage were not seen to be attractive even with the structured base tariff.

    Office buildings need heat ventilation air conditioning(HVAC)systems for the comfort of occupants and smooth flow of work.HVAC systems play a major role in the energy consumption of office buildings in KSA.This paper demonstrates the effectiveness of the CTES techniques,applied to the office buildings in King Abdul Aziz University in Jeddah,utilizing its hourly load profile calculated according to the building specifications and the building usage.CTES operation conditions are designed according to the building load demand profile,storage capacity,and peak/off peak period.The potential cost savings attributed to the use of CTES system are evaluated,and are compared to those of a stratified cold storage and the “no storage” systems.

    2.Descriptions of Test Building

    In this paper,the effect of thermal energy storage opportunities is investigated with reference to building No.119,a five-story office administration building in King Abdul Aziz University(KAU)Jeddah,KAU is one of the largest educational institutions in KSA,with its latitude of 29:12 N degrees and longitude 39:7 E degrees.The total floor area of the building is 1415 m2and the floor to floor height at each level is 2.5 m.The walls of the building consist of the 200 mm concrete block and 50 mm polyurethane.The roof is flat and consists of the 150 mm heavy weight concrete deck with the 25 mm insulation,suspended ceiling with no insulation.Double glazed fixed windows with 12 mm air space in between are used in the building.Various major electrical loads used in this building include computers,teaching aids,laboratory equipment,printers,lamps,and air conditioner units.Table 1 summarizes the physical characteristics of the office building No.119.

    A load profile for the selected building is developed to evaluate the cooling and storage requirements of the building.Building office hours are 06:30 a.m.to 15:30 p.m.and the number of occupants exceeds 100.In order to provide an estimate of the cooling,the load profile of the building is under investigation.The weather data of theJeddah City for the year 2011 shown in Fig.3 is utilised.This figure shows the maximum and minimum relative humidity(RH)and the ambient temperature at the Jeddah area.

    Table 1:Physical characteristics of the office building No.119

    Fig.3.Variation of monthly weather data of Jeddah city in 2011.

    Fig.4.Variation of hourly average cooling load of the office building during the months from January to December.

    Fig.5.Hourly average hourly cooling load demand of the office building in July.

    The cooling load of the selected building is supplied by forty three air handling units(AHUs)serving the different zones of the building.For each zone in the building,a separate profile is defined for the occupants,lighting,and the appliances.From the cooling load profiles of the office building for the months from January to December,shown in Fig.4,it can be seen that the hourly average cooling load in the month of July has the maximum cooling load of 343 ton refrigeration(TR).Fig.5 represents the hourly average load profile of an office building,having a peak design load of 343 TR for July.As it can be seen from this figure for a conventional AC system operation,the chiller operates throughout the day to provide sufficient cooling to meet the cooling load of the office building,and for most of the time the chiller operates at partial load.

    Fig.6.Proportions of the maximum cooling load of the building at 15:00 in the peak time.

    As shown in Fig.6,the maximum cooling load of the building during peak hours is divided into eight components:people,lighting,appliances etc.The ventilation consists of about 23% of the total load and forms a significant portion of the man cooling load.Furthermore,these figures also indicate that a major portion of the cooling energy is required during the peak hours,whereas a minimal energy is required during the off-peak hours.The daytime cooling load can easily be shifted to operate in night time by the incorporation of the cold thermal storage system with the existing central AC system.

    3.Selection of Type of Cool Thermal Storage System

    The possible approaches to cool thermal storage for cooling buildings were classified according to the type of thermal storage medium and storage technologies in [12].The most common cool storage media are water,ice,and eutectic salts.Although,eutectic salts are available,their use is limited because of the technical problems due to uneven melting.Storage technologies include chilled water tanks,ice harvesting,ice-on-coil,encapsulated media,and slurry systems.

    Depending on the needs of the building and the electric rate structure,there are several operating strategies available for charging and discharging storage to meet cooling load during peak hours.Hence,the operating strategy determines what portion of the load at any given time is met by the storage and what portion is met by direct chilling[13],[14].The operating strategies of cool thermal storage systems can be either full storage or partial storage,depending on the amount of cooling load shifted from on-peak to off-peak periods.Partial storage may be using either a storage priority or a chiller priority.Full storage systems are designed to meet all the on-peak cooling loads from the cool storage.With a partial-storage strategy,the capacity of the chiller is significantly less than the maximum load.The chiller only meets part of the on-peak cooling load and the remaining part is met by the cool storage[14].Such operating strategies can be further subdivided into the load-leveling operation and the demandlimiting operation.Fig.7 shows the operation strategies of the basic cool thermal storage for each scenario.

    Fig.7.Operation strategies of a basic cool thermal storage system.

    The selection of a CTES for a particular application is based on the major factors such as technical,environmental,economic,energetic,sizing,integration,and storage duration[3].In this investigation,partial and full storage strategies are examined for both ice and chilled water storage systems.For the partial storage strategy,the loadleveling and 50% demand-limiting strategies are examined.The factors affecting the design of CTES systems for office buildings are discussed as follows.

    The size of the chiller and storage capacities for each operation strategy can be obtained for the ice and chilled water storage systems as

    where HChis the storage charging time,CRChis the chiller’s capacity ratio when charging storage,HDCis the direct cooling during on-peak period,CRDCis the chiller’s capacity ratio when direct cooling during on peak period,HDCfis the hours of direct cooling during off-peak period,and CRDcfis the chiller’s capacity ratio when direct cooling during off-peak period.

    The chiller capacity ratio(CR)is the ratio of the cooling production of the chiller at any hour to the chiller nominal capacity.Hence,for an ice storage system,the capacity ratio when charging(CRCh)is chosen as 0.65,and when direct cooling(CRDC)is chosen as 1.0 of the nominal chiller capacity.For the chilled water storage system,the capacity ratios when charging(CRCh)and when direct cooling(CRDC)of the chiller are assumed to be equal to 1,similar to a conventional AC system[11].If the resulting nominal chiller size is greater than the cooling load for any hour of operation in direct cooling mode,the chiller size is to be recalculated.The flow chart for the feasibility assessment process shown in Fig.8 can be used to determine which system can provide the most economical solution[15].Storage capacity depends on both the chiller output and the number of charging hours available for storage.Therefore,the required storage capacity for each operation strategy is calculated as

    where TCDCis the total capacity when direct cooling during the on-peak period,TCDCfis the total capacity when direct cooling during the off-peak period,and THChis the direct cooling while simultaneously charging.

    4.Results and Discussion

    Fig.5 represents the hourly load profile of the office building No.119,having a peak design load of 343 TR(at 15:00 hours)with a total cooling requirement of 5610 ton hours in a 24-hour cooling period,as given in Table 2.Thus,the daily cooling demand of the building requires the chillers with the average actual capacity of 234 tons.The chiller nominal capacity is to be higher than the required value as chiller operates at less than nominal capacity.

    Fig.8.Flow chart detailing the feasibility assessment process.

    Table 2:Hourly AC loads of the office building in July

    Table 3:Calculated nominal chiller size and storage capacities for an office building

    Fig.9.Profiles of the cooling load of the chillers partial storage,load-leveling operating strategies,in chilled water storage.

    Table 2 shows the hourly AC load requirement for building No.119 for July.It can be seen that the storage discharging takes place from 7:00 to 17:00 during which the system load and electricity demand are both high,thereby reducing the total electrical energy consumption.In this case,using the system load profiles of an office building shown in Fig.5,and applying the selected charging and discharging time periods,the size of the chiller capacity for each operating strategy is computed for the ice and chilled water storage systems for various operating conditions and are summarised in Table 3.From this table,it is observed that the partial storage demandlimiting operation with 50% capacity ratios has the maximum chiller capacity.Further,partial storage loadleveling operation has the lowest chiller and storage sizes,and it reduces the peak electrical power demand.The chiller and storage sizes in full storage are larger than those in the partial storage load-leveling operation and smaller than those in the demand-limiting operation with 50%capacity ratios operations.It can also be observed that the stored cooling load is equal to the available load from the chiller after satisfying the off-peak cooling load.

    The storage capacity for the operation strategy in Fig.9 is equal to the area between the cooling load and the cooling production during the charging hours.This profile shows how the cooling load can be redistributed to minimize the peak demand.In this case,the chiller starts to charge the storage at 6:00 pm when the chiller cooling production in the charging mode is higher than the system cooling load,and ends at 7:00 am,so the chiller takes approximately 13 hours to charge the storage tank.

    The bar chart of the hourly variation of the building cooling load of the chiller is shown in Fig.9,which illustrates the profile of the cooling load of the chillers operating in the partial storage load leveling for chilled water.Costs for cold storage systems vary significantly because of the many different technology options and significant size economies-of-scale for some components,in addition to the variation in site-specific conditions and individual vendor offerings.Table 3 shows the details of various operating strategies and the corresponding chiller and storage capacities computed for the office building No.119.The following steps can be used to prepare rough estimates for the six operating strategies of cold thermal storage system that are selected for the present study.In general,all systems have a chill-generating device and a chill storage device.

    The installation cost of the storage tanks for chilled water and ice storage in Saudi Arabia market can be adopted with SR 150/TR hour and SR 225/TR hour,respectively[9],[13].The installation cost of the CTES systems in Saudi Arabia market can be adopted with SR 3000/TR that includes the supply and installation of chillers,pumps,cooling towers,ice tanks,piping & valve fittings,electrical and control system cost,and chemical treatment.The average annual maintenance cost for the conventional AC system is approximately 30 SR per ton per year,based on 20 years of useful chiller-life.In the case of CTES,the chilled water system is about 40 SR per ton per year,and the ice storage system is 50 SR per ton per year[7],[11],[15].The summary of these results is presented in Table 4.

    Table 4:Summary of the economic analysis of an office building

    Upon comparison of the installation and maintenance costs of the conventional system with the CTES systems,it can be observed that the partial storage demand-limiting operating strategies with 50% capacity ratios cost has the highest cost followed by the conventional system.The results indicate that the chilled water partial storage is significantly lower than the other strategies.It is observed that the cost saving in the load-leveling storage strategy is significantly lower than the other strategies.Additionally,the results in Table 4 indicate that the total in saving cost can reach up to 16.3% in the best condition of the partial storage-load leveling and chilled water.

    5.Conclusions

    This paper has dealt with the applications of cold thermal storage techniques for the reduction of the electric energy consumption in the office buildings in Saudi Arabia during the peak load period.The investigations have been carried out on the basis of the calculated load profile and the climatic conditions in Saudi Arabia.The chilled water partial storage,load-leveling approach,is seen to be the most attractive and economic option for the office buildings in this country.In addition to the peak load reduction,this technique also enables the reduction in the capacities requirements of the system,and hence in the capital investment as well as in the operation cost.The application of CTES may be made more economic from the consumer’s perspective,if different electric tariffs are applied for the peak and off-peak periods in Saudi Arabia.

    [1]Annual Report,Saudi Electricity Company,2011.

    [2]M.M.Hussain,I.Dincern,and S.M.Zubair,“A feasibility study of using thermal energy storage in a conventional air-conditioning system,” Int.Journal of Energy Research,vol.28,no.11,pp.955–967,2004.

    [3]I.Dincer and M.A.Rosen,Thermal Energy StorageSystems and Applications,2nd ed.Chichester:John Wiley &Sons,Ltd.,2011.

    [4]T.S.Wan.(April 1994).Ice thermal storage in air conditioning application fundamentals.[Online].Available:http://thomastswan.files.wordpress.com/2010/01/article-1-fu ndamental.pdf

    [5]D.R.Laybourn and V.A.Baclawski,“The benefits of thermal energy storage for cooling commercial buildings,”IEEE Trans.on Power Apparatus and Systems,vol.PAS-104,no.9,pp.2356–2360,1985.

    [6]K.Liu,H.Güven,A.Beyene,and P.Lowrey,“A comparison of the field performance of thermal energy storage(TES)and conventional chiller systems,” Energy,vol.19,no.8,pp.889–900,1994.

    [7]S.M.Hasnain,S.H.Alawaji,A.M.Al-Ibrahim,and M.S.Smiai,“Prospects of cool thermal storage utilization in Saudi Arabia,” Energy Conversion & Management,vol.41,no.17,pp.1829–1839,2000.

    [8]M.Sebzali,“Assessment of cool thermal storage strategies in Kuwait,” Ph.D.dissertation,School of Engineering,Cranfield University,Bedford,UK,2007.

    [9]A.V.Novo,J.R.Bayon,D.Castro-Fresno,and J.R.Hernandez,“Review of seasonal heat storage in large basins:water tanks and gravel-water pits,” Journal of Applied Energy,vol.87,no.2,pp.390–397,2010.

    [10]G.Y.Fang and H.Li,“Economic analysis of cool storage air-conditioning systems,” Int.Journal of Architectural Science,vol.5,no.2,pp.47–51,2004.

    [11]B.A.Habeebullah,“Economic feasibility of thermal energy storage systems,” Energy and Buildings,vol.39,no.3,pp.355–363,2007.

    [12]C.E.Dorgan and S.E.James,Design Guide for Cool Thermal Storage,American Society of Heating,Refrigeration and Air-Conditioning Engineers,Atlanta,1994.

    [13]I.Dincer,“On thermal energy storage systems and applications in buildings,” Energy and Buildings,vol.34,no.4,pp.377–388,2002.

    [14]B.He,“High-capacity cool thermal energy storage for peak shaving―A solution for energy challenges in the 21st century,” Ph.D.dissertation,Department of Chemical Engineering and Technology,Kungl Tekniska H?,Stockholm,Sweden,2004.

    [15]Cool Storage Technology Guide,Electric Power Research Institue,Palo Alto,2000.

    两性午夜刺激爽爽歪歪视频在线观看 | 视频在线观看一区二区三区| 丁香六月天网| 男男h啪啪无遮挡| 国产av又大| 大香蕉久久网| 精品国产超薄肉色丝袜足j| 国产精品二区激情视频| 王馨瑶露胸无遮挡在线观看| 99热国产这里只有精品6| 亚洲av美国av| 亚洲国产欧美日韩在线播放| 黄色毛片三级朝国网站| 最黄视频免费看| 捣出白浆h1v1| 在线观看一区二区三区激情| 亚洲国产欧美网| www.精华液| 青草久久国产| 久久久久精品人妻al黑| 午夜福利视频在线观看免费| 老司机影院成人| 国产精品免费大片| 色精品久久人妻99蜜桃| 99re6热这里在线精品视频| 亚洲全国av大片| av不卡在线播放| 日韩中文字幕视频在线看片| 啪啪无遮挡十八禁网站| 久久毛片免费看一区二区三区| 不卡一级毛片| 国产在视频线精品| 精品欧美一区二区三区在线| 成年美女黄网站色视频大全免费| 免费高清在线观看日韩| 欧美黑人欧美精品刺激| 久久久国产欧美日韩av| 午夜福利乱码中文字幕| 精品久久蜜臀av无| 亚洲激情五月婷婷啪啪| 大陆偷拍与自拍| 老汉色av国产亚洲站长工具| 日韩熟女老妇一区二区性免费视频| av在线老鸭窝| 精品亚洲乱码少妇综合久久| 久久亚洲精品不卡| 亚洲视频免费观看视频| 国产精品二区激情视频| www.av在线官网国产| 色94色欧美一区二区| 国产精品av久久久久免费| 国产免费福利视频在线观看| 亚洲美女黄色视频免费看| 成人手机av| 国产色视频综合| 免费在线观看黄色视频的| 久久久久视频综合| 高清在线国产一区| 啦啦啦中文免费视频观看日本| 日韩免费高清中文字幕av| 丝袜脚勾引网站| 老熟女久久久| 欧美黑人欧美精品刺激| 99国产综合亚洲精品| 精品国产乱码久久久久久小说| 日日夜夜操网爽| 美女视频免费永久观看网站| 一个人免费在线观看的高清视频 | 亚洲精品国产av成人精品| 亚洲少妇的诱惑av| 69av精品久久久久久 | 91九色精品人成在线观看| 乱人伦中国视频| 天天添夜夜摸| 亚洲综合色网址| 欧美激情久久久久久爽电影 | 电影成人av| 高清在线国产一区| 久久久久久久国产电影| 成年美女黄网站色视频大全免费| 伦理电影免费视频| 亚洲国产成人一精品久久久| 国产av精品麻豆| 亚洲av男天堂| 一边摸一边抽搐一进一出视频| 男女无遮挡免费网站观看| cao死你这个sao货| 丰满人妻熟妇乱又伦精品不卡| 国产精品1区2区在线观看. | 天天躁夜夜躁狠狠躁躁| 狠狠婷婷综合久久久久久88av| 亚洲国产av影院在线观看| 丝袜美足系列| avwww免费| 在线天堂中文资源库| 男女之事视频高清在线观看| 99香蕉大伊视频| 精品久久蜜臀av无| 国产xxxxx性猛交| 欧美日韩中文字幕国产精品一区二区三区 | 高清在线国产一区| 亚洲欧美清纯卡通| 嫩草影视91久久| 19禁男女啪啪无遮挡网站| 国产免费福利视频在线观看| 各种免费的搞黄视频| 亚洲av片天天在线观看| 成人av一区二区三区在线看 | 亚洲精品国产一区二区精华液| 黑人猛操日本美女一级片| 不卡av一区二区三区| 国产亚洲av片在线观看秒播厂| 亚洲人成77777在线视频| 成人黄色视频免费在线看| √禁漫天堂资源中文www| 在线观看舔阴道视频| 亚洲av成人不卡在线观看播放网 | 色综合欧美亚洲国产小说| 在线观看舔阴道视频| 韩国精品一区二区三区| 国产一区二区三区综合在线观看| 麻豆av在线久日| 欧美日韩亚洲国产一区二区在线观看 | 亚洲精品国产av蜜桃| 18禁国产床啪视频网站| 国产精品久久久久久人妻精品电影 | 大型av网站在线播放| 性少妇av在线| 精品少妇久久久久久888优播| 国产精品一区二区精品视频观看| 国产一区有黄有色的免费视频| 美女高潮到喷水免费观看| 久久久久久久久久久久大奶| 日韩中文字幕视频在线看片| 亚洲av片天天在线观看| 国产高清视频在线播放一区 | 伦理电影免费视频| 一边摸一边抽搐一进一出视频| 女人高潮潮喷娇喘18禁视频| 午夜福利,免费看| 久久久久久久久久久久大奶| 首页视频小说图片口味搜索| 免费一级毛片在线播放高清视频 | 免费在线观看日本一区| 色婷婷久久久亚洲欧美| 亚洲精品一区蜜桃| 高清视频免费观看一区二区| 国产福利在线免费观看视频| 亚洲天堂av无毛| 夜夜夜夜夜久久久久| 一进一出抽搐动态| 欧美久久黑人一区二区| 热re99久久国产66热| 搡老熟女国产l中国老女人| 欧美日韩黄片免| 久热这里只有精品99| 中文字幕另类日韩欧美亚洲嫩草| 国产成人av教育| 久久影院123| 水蜜桃什么品种好| 一个人免费看片子| 欧美日韩中文字幕国产精品一区二区三区 | 久久久精品94久久精品| 黑人操中国人逼视频| 久久久久久久大尺度免费视频| 两个人免费观看高清视频| 男女之事视频高清在线观看| 日韩制服骚丝袜av| 黄色毛片三级朝国网站| 又紧又爽又黄一区二区| 一区二区日韩欧美中文字幕| 99精国产麻豆久久婷婷| 操出白浆在线播放| 黄色怎么调成土黄色| 国产亚洲一区二区精品| 亚洲第一av免费看| 久久国产精品大桥未久av| 亚洲熟女精品中文字幕| 欧美大码av| 狂野欧美激情性bbbbbb| 久久精品国产a三级三级三级| 日本精品一区二区三区蜜桃| 色94色欧美一区二区| 亚洲人成电影免费在线| 亚洲av成人一区二区三| 好男人电影高清在线观看| 日韩,欧美,国产一区二区三区| 日本av免费视频播放| √禁漫天堂资源中文www| 黄色视频在线播放观看不卡| 在线观看免费视频网站a站| 亚洲一码二码三码区别大吗| 人妻久久中文字幕网| 亚洲欧美日韩高清在线视频 | 国产成人a∨麻豆精品| 亚洲精品国产av蜜桃| 天天添夜夜摸| 日韩有码中文字幕| 久久99热这里只频精品6学生| 欧美日韩国产mv在线观看视频| 涩涩av久久男人的天堂| 国产精品一区二区在线观看99| 国产欧美日韩一区二区精品| 亚洲精品国产色婷婷电影| 免费人妻精品一区二区三区视频| 欧美亚洲 丝袜 人妻 在线| 别揉我奶头~嗯~啊~动态视频 | 丰满饥渴人妻一区二区三| 午夜视频精品福利| 国产精品九九99| av超薄肉色丝袜交足视频| www.av在线官网国产| 欧美在线黄色| 老司机靠b影院| 欧美人与性动交α欧美软件| 久久久精品94久久精品| 黄色片一级片一级黄色片| 国产免费福利视频在线观看| 亚洲成人国产一区在线观看| 日韩制服丝袜自拍偷拍| 岛国在线观看网站| 日本av手机在线免费观看| 久久久久视频综合| 中文欧美无线码| 黑丝袜美女国产一区| 日韩欧美一区视频在线观看| 黄色 视频免费看| 夜夜骑夜夜射夜夜干| 中国国产av一级| 国产成人免费观看mmmm| 1024视频免费在线观看| 19禁男女啪啪无遮挡网站| 成人黄色视频免费在线看| 免费一级毛片在线播放高清视频 | 欧美激情 高清一区二区三区| 老熟女久久久| 欧美成人午夜精品| 黑人操中国人逼视频| 欧美精品av麻豆av| 免费不卡黄色视频| 日韩大码丰满熟妇| 肉色欧美久久久久久久蜜桃| 亚洲第一青青草原| 一个人免费看片子| 国产一级毛片在线| 免费日韩欧美在线观看| 黑人欧美特级aaaaaa片| 大码成人一级视频| 精品国产乱码久久久久久小说| 亚洲一码二码三码区别大吗| 超色免费av| 色视频在线一区二区三区| 欧美 亚洲 国产 日韩一| 久久久久久免费高清国产稀缺| 涩涩av久久男人的天堂| 亚洲精品一二三| 免费高清在线观看日韩| 可以免费在线观看a视频的电影网站| 日本撒尿小便嘘嘘汇集6| 久久九九热精品免费| 美女大奶头黄色视频| 久久中文字幕一级| 日韩三级视频一区二区三区| 国产av一区二区精品久久| 丁香六月天网| 18禁观看日本| 黄网站色视频无遮挡免费观看| 国产精品熟女久久久久浪| 丝袜美足系列| 久久人人爽av亚洲精品天堂| 久久久精品94久久精品| 国产精品久久久久成人av| 久久人人97超碰香蕉20202| 国产男女超爽视频在线观看| 操美女的视频在线观看| 精品国内亚洲2022精品成人 | 久久女婷五月综合色啪小说| 1024视频免费在线观看| 亚洲av男天堂| 精品国产乱子伦一区二区三区 | 老熟女久久久| 久久久国产欧美日韩av| 国产精品一区二区精品视频观看| 久久久久网色| 在线十欧美十亚洲十日本专区| 丰满少妇做爰视频| 99国产精品99久久久久| 久久青草综合色| 国产精品一区二区免费欧美 | 成年av动漫网址| 国产成人欧美| 美女视频免费永久观看网站| 在线观看www视频免费| 亚洲精品成人av观看孕妇| 老熟妇乱子伦视频在线观看 | 亚洲精品在线美女| 日本黄色日本黄色录像| a级片在线免费高清观看视频| 国产真人三级小视频在线观看| 一个人免费看片子| videos熟女内射| 亚洲 国产 在线| 天天躁夜夜躁狠狠躁躁| 女人被躁到高潮嗷嗷叫费观| 一区二区三区激情视频| 秋霞在线观看毛片| 侵犯人妻中文字幕一二三四区| 在线十欧美十亚洲十日本专区| 中文字幕精品免费在线观看视频| 久久综合国产亚洲精品| 亚洲专区国产一区二区| 90打野战视频偷拍视频| 人妻久久中文字幕网| 丰满饥渴人妻一区二区三| 黄色视频,在线免费观看| 久久午夜综合久久蜜桃| 十八禁高潮呻吟视频| 午夜福利在线观看吧| 午夜福利视频精品| 亚洲精品久久成人aⅴ小说| 国产欧美日韩一区二区精品| 美国免费a级毛片| 国产日韩欧美视频二区| 麻豆乱淫一区二区| 精品少妇黑人巨大在线播放| 日韩大码丰满熟妇| 国产一区二区三区av在线| 国产av又大| 日本一区二区免费在线视频| 国产成人av教育| 亚洲免费av在线视频| 老司机午夜福利在线观看视频 | av视频免费观看在线观看| 精品人妻在线不人妻| av视频免费观看在线观看| 欧美黑人欧美精品刺激| 免费在线观看黄色视频的| 亚洲情色 制服丝袜| 九色亚洲精品在线播放| 精品一区二区三卡| 国产有黄有色有爽视频| 日韩一卡2卡3卡4卡2021年| 一本久久精品| 在线 av 中文字幕| 久热爱精品视频在线9| 国产精品久久久久久精品古装| 国产欧美日韩一区二区三区在线| 老熟女久久久| 日韩 欧美 亚洲 中文字幕| 国产精品久久久人人做人人爽| 亚洲第一青青草原| 女性生殖器流出的白浆| 狠狠婷婷综合久久久久久88av| 欧美在线一区亚洲| 国产精品成人在线| 国产成人av教育| 亚洲第一欧美日韩一区二区三区 | 青春草亚洲视频在线观看| 黑人巨大精品欧美一区二区mp4| 久久久欧美国产精品| tocl精华| 午夜福利视频精品| 久久人人97超碰香蕉20202| 大香蕉久久网| 国产国语露脸激情在线看| 日日摸夜夜添夜夜添小说| 丝袜在线中文字幕| www.av在线官网国产| 狠狠狠狠99中文字幕| 欧美日韩视频精品一区| 日本撒尿小便嘘嘘汇集6| www.熟女人妻精品国产| 国产1区2区3区精品| av不卡在线播放| 精品国产超薄肉色丝袜足j| 午夜免费成人在线视频| 欧美黑人精品巨大| 十八禁网站免费在线| 大陆偷拍与自拍| 最新的欧美精品一区二区| 国产成人一区二区三区免费视频网站| 婷婷丁香在线五月| 色视频在线一区二区三区| 国产亚洲精品一区二区www | 久久久久精品人妻al黑| 国产伦人伦偷精品视频| 大香蕉久久成人网| 久久久久久亚洲精品国产蜜桃av| 亚洲欧洲精品一区二区精品久久久| 国产1区2区3区精品| 午夜激情av网站| 欧美+亚洲+日韩+国产| 久久精品国产亚洲av香蕉五月 | 欧美黄色淫秽网站| 国产日韩一区二区三区精品不卡| 亚洲欧美一区二区三区久久| 国产亚洲av高清不卡| av在线app专区| 精品乱码久久久久久99久播| 国产一区二区三区在线臀色熟女 | 日韩精品免费视频一区二区三区| 午夜福利免费观看在线| 51午夜福利影视在线观看| 两性夫妻黄色片| 老司机福利观看| 国产成人免费无遮挡视频| 九色亚洲精品在线播放| 久久精品国产a三级三级三级| av视频免费观看在线观看| 亚洲人成77777在线视频| 亚洲精品久久久久久婷婷小说| 欧美日韩亚洲国产一区二区在线观看 | 久久国产精品男人的天堂亚洲| 久久香蕉激情| 秋霞在线观看毛片| 亚洲国产精品一区二区三区在线| 高清在线国产一区| 国产亚洲一区二区精品| 黄色视频不卡| 亚洲免费av在线视频| 丝袜脚勾引网站| 亚洲,欧美精品.| 亚洲伊人久久精品综合| av国产精品久久久久影院| 丝袜脚勾引网站| 国产亚洲精品第一综合不卡| www.av在线官网国产| 免费高清在线观看视频在线观看| 首页视频小说图片口味搜索| 一级毛片精品| 亚洲中文字幕日韩| 在线观看免费视频网站a站| 亚洲九九香蕉| 99精品久久久久人妻精品| 制服人妻中文乱码| 欧美精品啪啪一区二区三区 | 日本欧美视频一区| 视频区欧美日本亚洲| www.熟女人妻精品国产| 嫩草影视91久久| 电影成人av| 正在播放国产对白刺激| 美国免费a级毛片| 亚洲 国产 在线| 日韩,欧美,国产一区二区三区| 这个男人来自地球电影免费观看| av网站在线播放免费| 又黄又粗又硬又大视频| 伊人久久大香线蕉亚洲五| 精品人妻熟女毛片av久久网站| 久久精品成人免费网站| 2018国产大陆天天弄谢| 免费在线观看视频国产中文字幕亚洲 | 91成人精品电影| 日韩视频一区二区在线观看| 日韩有码中文字幕| 一区二区三区四区激情视频| 国产无遮挡羞羞视频在线观看| 免费观看av网站的网址| 中文字幕高清在线视频| 男女床上黄色一级片免费看| 一级毛片电影观看| 欧美激情久久久久久爽电影 | 最近中文字幕2019免费版| 亚洲欧美成人综合另类久久久| 欧美乱码精品一区二区三区| 亚洲中文av在线| 丁香六月欧美| 欧美日本中文国产一区发布| 欧美大码av| 国产免费av片在线观看野外av| 汤姆久久久久久久影院中文字幕| 亚洲国产中文字幕在线视频| 亚洲国产精品成人久久小说| 国产日韩欧美亚洲二区| 久久国产精品大桥未久av| 国产成人免费观看mmmm| 咕卡用的链子| 亚洲成人免费av在线播放| 欧美激情高清一区二区三区| 少妇的丰满在线观看| 免费日韩欧美在线观看| 男人添女人高潮全过程视频| 交换朋友夫妻互换小说| 午夜久久久在线观看| 国产精品1区2区在线观看. | 国产精品二区激情视频| 波多野结衣一区麻豆| 中文字幕av电影在线播放| 亚洲 国产 在线| 大陆偷拍与自拍| 亚洲精品国产一区二区精华液| videos熟女内射| 久9热在线精品视频| 一边摸一边抽搐一进一出视频| 黄色视频不卡| 丰满人妻熟妇乱又伦精品不卡| 十八禁高潮呻吟视频| 欧美成狂野欧美在线观看| 久久精品亚洲熟妇少妇任你| 精品乱码久久久久久99久播| 美女主播在线视频| 美国免费a级毛片| 在线观看免费视频网站a站| 欧美亚洲 丝袜 人妻 在线| 亚洲 欧美一区二区三区| 午夜免费成人在线视频| 亚洲一码二码三码区别大吗| 亚洲欧洲精品一区二区精品久久久| 妹子高潮喷水视频| 亚洲av日韩精品久久久久久密| 国产区一区二久久| 超碰成人久久| 亚洲精品久久成人aⅴ小说| 黄片大片在线免费观看| 国产成人免费无遮挡视频| 亚洲成人免费av在线播放| av网站免费在线观看视频| 欧美久久黑人一区二区| 91字幕亚洲| 亚洲av欧美aⅴ国产| 色老头精品视频在线观看| 午夜福利免费观看在线| 一级毛片女人18水好多| 一二三四社区在线视频社区8| 久久热在线av| 国产精品国产av在线观看| 亚洲精品乱久久久久久| 91字幕亚洲| 亚洲色图 男人天堂 中文字幕| 97人妻天天添夜夜摸| 国产精品av久久久久免费| 国产精品一区二区免费欧美 | 18禁裸乳无遮挡动漫免费视频| 美女国产高潮福利片在线看| 欧美老熟妇乱子伦牲交| 久久久精品国产亚洲av高清涩受| 色老头精品视频在线观看| 一二三四社区在线视频社区8| 一本—道久久a久久精品蜜桃钙片| 又紧又爽又黄一区二区| 国产一区二区激情短视频 | 丝袜在线中文字幕| 亚洲国产精品一区二区三区在线| 黄片播放在线免费| 亚洲精品一区蜜桃| 麻豆av在线久日| 99久久99久久久精品蜜桃| av视频免费观看在线观看| 国产成人一区二区三区免费视频网站| 亚洲午夜精品一区,二区,三区| 成年人免费黄色播放视频| 婷婷丁香在线五月| 午夜视频精品福利| 国产精品久久久久久人妻精品电影 | 午夜福利,免费看| 可以免费在线观看a视频的电影网站| 亚洲中文字幕日韩| 男女之事视频高清在线观看| 色视频在线一区二区三区| 国产精品久久久av美女十八| 国产一区二区三区av在线| 老司机深夜福利视频在线观看 | 爱豆传媒免费全集在线观看| 亚洲中文字幕日韩| 黄频高清免费视频| 一级毛片精品| 欧美午夜高清在线| 两人在一起打扑克的视频| 999久久久精品免费观看国产| 免费女性裸体啪啪无遮挡网站| 我的亚洲天堂| 日本五十路高清| 超色免费av| 在线 av 中文字幕| 成人亚洲精品一区在线观看| 久久午夜综合久久蜜桃| 亚洲国产毛片av蜜桃av| 亚洲人成电影免费在线| 精品少妇一区二区三区视频日本电影| 99国产综合亚洲精品| 黄色a级毛片大全视频| 成年动漫av网址| 国产97色在线日韩免费| 黄色 视频免费看| 亚洲精品日韩在线中文字幕| 亚洲自偷自拍图片 自拍| 女人久久www免费人成看片| 久久午夜综合久久蜜桃| 日韩 欧美 亚洲 中文字幕| 精品久久久久久电影网| 欧美日韩黄片免| 久久天躁狠狠躁夜夜2o2o| 咕卡用的链子| 女人久久www免费人成看片| 久久热在线av| 欧美变态另类bdsm刘玥| 久久久久久亚洲精品国产蜜桃av| 久久久久久人人人人人| 91国产中文字幕| 精品福利观看| 亚洲国产精品一区二区三区在线| 美女国产高潮福利片在线看| 欧美精品一区二区大全| 老熟妇乱子伦视频在线观看 | 精品久久蜜臀av无| 精品视频人人做人人爽| svipshipincom国产片| 18禁国产床啪视频网站| 午夜免费鲁丝| 国产一区二区激情短视频 | 男人添女人高潮全过程视频| 国产区一区二久久| 极品少妇高潮喷水抽搐| 亚洲欧美成人综合另类久久久|