    0 General description

    The city of Magadan is situated in the southern permafrost zone of Russia's Far Northeast[1].It lies on the coast of the Gulf of Taui in the Sea of Okhotsk where the StaritskyPeninsula joinsthe mainland (Fig.1).Magadan is bounded by Nagaev Bay on the west and by Gaertner Bay on the east.The mountain ranges to the north and south have elevations of 200 m to 700 m above sea level.The city is crossed by Magadanka Creek with a wide,swampy valley.Most part of the city is located south-west of Magadanka Creek,on the Magadanka-Nagaev watershed.Surface and subsurface waters of the watershed drain into Magadanka Creek to the north-east and into Nagaev Bay to the west.The watershed has a maximum elevation of 120 m above sea level.Its northeastern slope is gentle(3° to 5°),while the western slope is steep and abrupt.

    Fig.1 Location of Magadan

    Magadan is located in an area of high earthquake activity[2].Earthquakes of magnitude 8~9 are possible in the area[3].

    The climate is monsoonal.The annual mean air temperature is-3.6℃,with daily means above 0℃from mid-May to mid-October.Mean annual precipitation is 550 mm,of which about half falls as rain.Winds are generally from the west and southwest in summer and from the northeast and east in winter.The mean annual wind speed is 5.6 m/s.The number of days with snow storms is about 50.Snow cover is up to 0.3 m deep and characterized by with redistribution[4].

    1 Geology and permafrost

    The geological structure of the area is determined by its location within the Magadan Intrusion[5].The upper 10~15 m of the geological section consist of Quaternary deposits underlain by rocks of Neogene age more than 100 m in thickness.

    The Neogene rocks include the marine pebbles with sand and the lagoon and continental materials represented by sandy clays,gravels and pebbles,and granodiorite weathered and solid rocks.The former comprise the southeastern slope of the Magadanka-Nagaev watershed,while the latter make up the remaining part of the city area.The Quaternary sediments that blanket the Neogene rocks are in turn subdivided into alluvial,colluvial,and residual.

    The alluvial deposits occur in the valley of Magadanka Creek and comprise its floodplain and terraces.Lithologically,they consist of sand,gravel and cobble in widely varying proportions.Sands have varying compositions from silty to gravelly.The alluvium 10 m or more in thickness often contains beds and layers of gravelly sandy and clayey silts.

    The colluvial deposits occur everywhere on the slopes.They consist largely of silty sands,sandy silts,and clayey silts with varying amounts of boulders,cobbles and pebbles of granodiorite.At depth,the colluvial deposits gradually merge with the Neogene rocks of similar composition.The thickness of this layer is a few meters,but increases up to 10 m along the slope bases.

    The residual soils derived from the weathering of the underlying rocks lie at greater depths.These soils together with the bedrock occur near the surface only on the steep slopes.The thickness of the residuum is up to 10-15 m.

    The geocryological conditions in the Magadan area are highly variable and complicated.Permafrost occurs as isolated lenses and patches in thawed ground.The permafrost bodies vary in size from 100 to 10 000 m2.Their thickness varies from 2 to 30 m,depending on size.The depth to the permafrost table generally is 3 to 5 m,but may be deeper in places.Two-layer permafrost is occasionally encountered,in which the layers of frozen ground are separated by thawed ground.

    The local permafrost is characteristically warm,with temperatures at the depth of zero annual amplitude close to 0℃,normally about-0.1 to-0.2℃.Exceptions to this are the permafrost bodies in wet low-lying and high areas of the city,where ground temperatures are-0.5 to-1℃.Presently,however,the size and thickness of permafrost bodies can only be judged for the time of a geotechnical site investigation,because any disturbance of the heat exchange at the ground surface by construction activities causes immediate changes to the thermal state of the warm permafrost.Observations indicate that the permafrost at Magadan is gradually degrading,with global climatic change contributing to the trend.

    The frozen gravels and sands generally have a massive cryostructure,while silts and silty sands have a layered or reticulate cryostructure.Ice contents are highest in the upper permafrost layers.Total moisture contents down to 8~10 m depths,in some cases to lower depths,are 0.08~0.12 for the frozen gravels,0.18~0.22 for the sands and sandy silts,and 0.3~0.35 for the clayey silts.The layers with moisture contents of 0.4~0.6 are encountered.At these moisture (ice)contents,the frozen soils are often thaw-unstable and may produce settlements of 3 to 18 cm/m.

    The thawed soils surrounding the permafrost bodies are not inferior in engineering properties to normal unfrozen soils,and may even be superior in some parameters[6].This is because the thawed soils were in a perennially frozen state in the geological past,but gradually warmed due to climatic and anthropogenic impacts.The post-cryogenic structure characteristic of thawed soils has been completely destructed.The action of the soil weight accompanied by aggregate breakup of the mineral framework in the saturated medium caused repacking of the solid particles,expulsion of the excess pore water,and filling of the pores with fines.These processes resulted in increased soil density and improved physical properties.The former frozen state of the soils is evidenced by geotechnical investigation data(Table 1).

    Table 1 Averaged physical characteristics of frozen and thawed soils in Magadan(depth interval from 3 to 30 m)

    The frost-related processes active in the Magadan area include only frost heaving in oversaturated finegrained soils and silty sands dominant in the upper part of the geological section,especially in the active layer,as well as icing formation at the foot of steep hillslopes and in the Magadanka Creek valley.

    Groundwater is encountered in most of the construction sites.Its occurrence is due to the rough terrain,deep seasonal thaw(down to 3.5 m),and abundant precipitation.Porous and fractured granodiorite aquifers are present.Most common are the so-called seasonal perched water bodies in thawed sands and gravels.Due to the high variability in soil facies,they occur as isolated lenses with limited water flow.Although yields are low,serious difficulties for earthwork can be created during snowmelt in the spring and incessant rains in the summer and autumn.

    Yields of the Neogene sediments are generally low.Supra-,intra-and subpermafrost waters are encountered occasionally in sands and gravels in the depth interval from 1 to 12 m.They are recharged by infiltrating precipitation and by water flowing from fractured aquifers at the foot of steep hillslopes.As a result,the Neogene aquifers at these locations may have heads of up to 5 m.The layer of alluvial gravel,6 to 7 m in thickness,in the Magadanka valley(within the floodplain and partially in the low terrace)has highest yields.Gravel aquifers here are 200 to 300 m or more in width.In summer,the steady water level rises to the ground surface.In winter,the head may increase to 1~2 m,resulting in the formation of icings throughout the winter.Protective dikes are constructed along the river bank to eliminate the icing problems on engineering structures.

    2 Selection of pile placement method

    The co-existence of frozen and thawed ground (Fig.2)within a construction site dictates the selection of foundation designs.Geocryological considerations include:1)warm permafrost;2)variable depths to the top of permafrost,often far below the active layer,and occasional two-layered permafrost with thick thawed interlayers;3)strong spatial and temporal variability of the permafrost bodies in response to shortterm climatic variations and construction activities;4) occurrence of ice-rich and hence thaw unstable soils; 5)seasonal soil freezing to depths of 1 to 3.5 m;during very cold winters with low snowfall soil freezing may be as deep as 4~5 m,resulting in frozen layers which remain unthawed for one or two summers or in newly formed permafrost;6)great depths(8~20 m or more)to the firm strata with sufficient strength and stability to safely support the buildings and structures.

    Fig.2 An example of the geotechnical cross-section for a construction site

    For such geocryological conditions,the Russian building code[7]stipulates for the use of Principle II,or the active method of constructing in permafrost.This method is best suited for sites underlain by bedrock or consolidated soils,including thawed and frozen soils whose deformation and strength properties are not changed on thawing.However,these materials are often overlain by unconsolidated sediments.Principle II therefore requires that measures be undertaken to minimize deformation of the foundation materials(e.g.,pre-thawing of frozen ground,replacement of frozen ground with thawed coarse materials,use of piles extending below a thaw-unstable stratum)and the superstructures be designed to accommodate differential settlements.The latter involves the use of structural elements that prevent additional stresses or the structure of a building must be of sufficiently rigid construction to resist these stresses.In general,these structural measures in combination with techniques to mitigate differential settlements are incorporated into the seismic de-sign requirements for the seismically active southern permafrost zone.

    If follows from above that the viability,stability and serviceability of buildings and structures in Magadan must be provided by selection of a proper design for the foundation and superstructure,engineering preparation of the site,and control of the interaction of the foundation with the ground.A set of all or part of the listed measures is termed techniques for ensuring building stability[8].

    The goal of the designer is to select the foundation type and design best suited,from technical and economic considerations and past experience,for the local soil and permafrost conditions.

    3 Pile foundations in Magadan

    Piles are the main foundation type for Magadan.They create the opportunity to reduce subsoil deformations to safe values for structural competences due to slotting of thaw unstable layers with the deepening of their bottom ends in bearing layers of thawed soils.For this purpose the very specific technologies:composite drilled-and-slurried piles(Fig.3)and drilled-anddriven piles(Fig.4)are used here.

    Fig.3 Structure diagram of composite drilled and slurried piles:1-drilling;2-road metal driving in the slurry on the drill hole;3-rubbly pad driving by the way of tamping;4-concreting of the tamped pile part;5-reinforced concrete member driving in the hole;6-vibratory pole driving into the pile monolithic concrete;7-performed composite drilled and slurried pile

    Fig.4 Structure diagram of drilled-and-driven piles1-pile hole drilling;2-hole grouting for slurry;3-drill holes;4-pile driving from the hole bottom;5-pile driven at the project reference

    Permafrost reasoning of pile placement technologies relating to the local construction conditions is given in Konash and Vlasov.The results of the accomplished studies are reflected in the regional building regulations[9-10].In view of new data and requirements,these regulations were updated and published as Guidelines for Design and Construction of Pile Foundations in Thawing and Thawed Ground in the Magadan Oblast[11].This document amends and develops the mandatory provisions of the Russian construction codes forfoundation engineering in the permafrostregion[7,12].For practical project development and foundations the regional resistivity amount of thawed soils under the pile tips(Tables 2 and 3)and on the side surface(Table 4),specific values of the negative friction force(Fig.5)as well as the correction factors dependent on the accepted practice of pile placement (composite drilled-and-slurried pile or drilled-anddriven pile)are described.All data necessary for design analyses have been obtained from field tests[6,13-19].Their certainty is controlled by many experimental and check tests of different constructions and pile standard size in the most various permafrostgeological conditions as well as long-term project and construction practice of pile foundation on the thawing and thawed soils of the Magadan region[6,15,20-21].

    For pile foundation design in the Magadan area,in the capacity of calculating bearing course thawed soils for composite drilled-and-slurried piles and drilled-and-driven piles underlying under the permafrost thickness and in the absence thereof under the layer of seasonal frost-thawing which within the bounds of the compressible thickness depths give summary compression not exceeding the tolerated one by the standards for constructing class of buildings and constructions[22]are used.At determining the bearing course of pile foundation soils it is taking into account that the construction region is in the seismically active zone.In this respect the pile embedment depth from the ground surface or from the foundation pit bottom must be no less than 4 m and where there are water saturated silt sands in the foundation-no less than 8 m[11].

    The selection of pile type and pile arrangement (e.g.pile clusters,fields,rows)is made on the basis of concrete conditions of construction site characterized by the materials of engineering permafrost investigations which are performed according to SP 47.13330.2012(Federal Agency for Construction,Housing and Utilities(Gosstroy),2012)and SP 11-105-97[23]and construction and technological peculiarities of future building or construction taking into account the dimensions and intention of their underground facilities as well as the design loads on the foundation.Where thick permafrost is present with its base located at a depth of 10 m or more from the foundation pit bottom,piles are penetrated placed into the thawed soil barred by permafrost,by composite drilledand-slurry method(see Fig.3).At smaller depths to the permafrost base,drilled-and-driven piles(see Fig.4)are used.If permafrost is absent,spread footings,strip footings or mat foundations are used.

    Table 2 Design resistance of thawed soils R under composite drilled-and-slurried piles tips

    Table 3 Design resistance of thawed soils R under drilled-and-driven piles tips

    Table 4 Design resistance of thawed soils fialong the pile skin

    Drilling for pile placement is made by drilling machines with cable tool percussion effect.This drilling method is used in the soils of any type and structure (with heavy percentage of coarse material,boulders etc)as well as thermal state-without restriction[24].The usage of other hole boring method for the purposes of pile foundation on the territory of Magadan turned out to be difficult because of dreadful garishness of frozen soiled and hydrogeological conditions of construction sites[5].

    Table 5 Design values of negative friction fn,iof thawing soils

    Cable tool percussion drilling is that the rock drill dropping at a height(about 1 m)damages mine rock by its chisel nose.The water periodically pouring in the deepening hole mixes with finely crushed soil and makes it into liquid-like saturated soil-drilling slurry taking out of the hole by the sludge after every drilling run.The disadvantage of the method is an incomplete cleanup.As a rule,on the hole bottom the layer of slurry at a height from 10 to 30 cm or frequently more leaves unselected.Besides the soil at some though small depths lower than the hole bottom can be in a few loosened state.

    Usually the drilling consists of the borehole wall lining by casing metal pipes.Depending on the complexity of frozen ground and hydrogeological conditions of the construction site the well casing can be effected in two ways.In the former case the hole is drilled at once at all the depths settled by the project and only then it is cased by metal pipe of corresponding diameter.This method is used when soil hole walls have sufficient temporal stability and can retain their entirety for more period of time after the drilling termination.The second way is used in the case of unstable hole walls which start already to ruin while drilling.It consists of the well casing by separate passover offsets driving in them one after one in proportion to driving in unstable soil.Usually the passover offsets are joined by electro-welding.

    Pipe swaging(entirely or partly)is made by rock drill and its removing by instrumental rope winch of drilling machine[20,24].

    Composite drilled and-slurried piles are composite constructions placed into the deep holes:on the bottom they consist of the tamped concrete pole resting on the reinforced road metal of the drill hole with slurry vestiges and an upper reinforced drop concrete member embedded in the tamped part of the pile monolithic pole to a depth equal to at least three times in the diameter of the hole;though the biggest diameter of the pile crosssection must be 15 cm less than pile diameter where composite pile is made.

    The main criterion defining the quality of this technology of the foundation installation and consequently the formation of bearing sand core in the pile bottom is firm contact of a tamped concrete pole with the drill hole.The problem of quality of this contact can be aggravated by the presence of slurry vestiges and loosened rock between the elements named above.The matter is that the density of this slurry will be always lower than the natural density soil of undisturbed structure.The way out is that the coarse rock is tamped in the slurry vestiges and loosened pile bottom[6].

    As tamper it is used the rock drill of drilling machine.For this purpose the rock drill is provided with the interchangeable nose in the form of the round metal plate with thickness of 30~50 mm the diameter of which must be 1 cm less than the hole diameter.In the process of road metal tamper preliminary buried at the hole bottom by the layer exceeding the height of slurry vestiges no less than twofold,the consolidation deformations of road metal interpenetration into the slurry and than in the soil of the hole bottom and its walls are taken place.

    The consolidation of the road metal surface is performed up to the getting of the magnitude of the‘refusal'not exceeding 2 cm for the latest five tamper blows.Though the total amount of the refusal magnitudes must be no less than the height of slurry vestiges layer measured before the beginning of tamping.As the result densely packed structure of road metal-and-slurry pad is created.Along with the compacted sand core under the bottom of the drill hole it creates the pile structural bearing by the means of which the vertical impulse is transmitted from the service loading though the composite construction(tamped pit and reinforcedconcrete pole)on the underlying soils of building or construction foundations.

    At the end of road metal-and-slurry pad installation the tamped concrete pole which is the intermediate element of the composite pile is performed.It has very important practical value for future foundation because varying the height of the tamped part where the reinforced concrete pile element is embedded the necessary foundation depth settled by the project is provided.

    The supratamped pile element is made of the concrete mixture of the class not lower than B-20 with the water-cement ratio WC 0.45~0.55 and the cone slump 5~10 cm.As the anti-freezing agent-the accelerator of the concrete strength development sodium chloride in a rate of 2.5% ~3.5% of the cement weight in the concrete mixture is applied.

    In the holes the concrete mixture is put by the method of vertically movable pipes(VMP)with the diameter of 250~325 mm.The concrete mixture settled on the projected height is tightened by the vibrating pile driver while lowering the reinforced concrete pole into the tamped pile shaft.The last one is embedded in the concrete mixture of the tamped shaft.The abutment joint between these elements must be no less than three hole diameter.

    Composite drilled-and-slurried piles can be settled in the holes with extracted and non extracted casing pipe.The last one is used when there is no the possibility of qualitative pile production in the holes with the extracted protecting cover.Usually there are such conditions on the slump and thermostatic lots as well as on the sites with ice-rich embedded permafrost with the interlayer of well filtering thawed coarse and sandy soils where under the pressure of the permafrost ground waters heavily refillable due to the ice melt-out from the permafrost the composite pile shaft on the separate hole sites can be damaged during the concrete mixture con-solidation of its tamped part.

    The advantage of composite drilled-and-slurried piles driving in the soil is the possibility to produce them in any lengths and diameter and place accurately enough on the project references either at the bottom or at the top of the piles,minimizing the building vestiges.This type of piles turned out to be very popular during the building of the city urban districts,the construction area of which is situated on the development sites of intermediate discontinuous permafrost with a capacity of more than 10 m[17,21].At the presence in the structure base ice lenses of smaller dimensions the foundations have been already installed from drilled and-driven piles[6].

    Drilled-and-driven piles are solid reinforced concrete piles designed to take account of the pile-driving impact loads driven into the bottom of pilot holes in the bearing layer of thawed soils.Pilot holes must be drilled on 0.5~1 mm lower than the permafrost base and have the diameter larger than the diagonal of the cross-section of the pile in 2~5 cm.In Magadan on the building sites for driving it is used the standards reinforced concrete piles with the lengths of 5~12 m and the cross-section of 30 cm×30 cm.Their placement in the piles is performed by the autocrane of the appropriate bearing capacity and the driving into the soil-by the tubular diesel hammer with the weight of the striking part in 1.8,2.5 and 3.5 ton-force.

    Before the placement piles are cleaned of the slurry.The thickness of its vestiges shouldn't exceed 30 cm.The existence of frozen slurry on the hole bottom is not admitted.For the exception of the last one the holes are drilled with the borehole wall lining by casing pipes.However in the frozen soils where the hole walls can retain temporal stability it is not obligatory to effect their casing on condition that the drill hole for further driving into the thawed soil will be performed instantly after the finishing of drilling but no later than 4 hours after the hole clearing.It is to be noted that the casing pipes must be taken out of the holes before the beginning of pile driving as after that this procedure will be extremely difficult or even impossible.

    Piles settled in the holes are driven lower than their bottom in the thawed soil at depths settled by the project whereby the base load-bearing capacity will provide the perception of calculated load from the future construction including the additional load when the permafrost thaws and consolidates around the pile.The control pile refusal(magnitude of its diving in the soil for one hammer blow)allocated by the project organization serves as the criterion of driving termination[11].

    The measurement of the refusals is performed in the end of driving when the depths diving in the soil riches the project references or the magnitudes of the actual refusals come close to the calculating values.The driving is ceased if the average refusal value in three consecutive blow counts,10 hammer blows in each doesn't exceed the magnitude of control refusal pointed in the piling project.

    Piles embedded lower than the hole bottom less than one meter(if it is not required by the project) and given pile refusal during three consecutive blow counts are subjected to the inspection for the causation that complicates pile driving.In this case on the basis of studying the materials of engineering and geological research and the capacity of utilizable diesel pile hammer it is decided the question about the measuring of the piles lengths,drilling depth and the replacement of pile-driving equipment.The piles given the refusal that is much more than the pile refusal are subjected to the check-out(dynamic and static)after the‘rest’,time limits of which for different types of the thawed soils taking into account their thixotropic properties are contained in the guidelines[11].As the results of such check-out the character of the future pile usage in the foundation structure(with the redundancy of specific piles or without their redundancy)is settled.

    4 Conclusions

    Project development and foundation installation with the usage of composite drilled-and-slurried piles and drilled-and-driven piles on the territory of Magadan is performed in accordance with the requirements of the local building code[11],drafted in the development of mandatory provisions of national standards and rules and regulations concerning the regional building peculiarities under the conditions of isolated patches expansion of permafrost during their simultaneous existence with the thawed soils.

    The importance of the placement methods of these pile types on the territory of the city with very specific permafrost conditions is that due to them the construction sites with most diverse diving of lenses and permafrost regions underlying by the thawed soils which are reliable base for future foundations of buildings and constructions here.Complete slotting of thaw unstable layers and piles diving in the thawed soils provide required operational stability of construction objects.Besides high bearing pile capacity embedded on the thawed soil foundation it should be noted their adaptation for negative skin friction when the permafrost thaws and consolidates around the pile.Since the drill holes are larger in diameter than the cross-section of the piles,the annular space between the pile and the hole can be filled with any type of slurry.In Magadan the common practice is to use drilling slurry produced in large quantities during cable tool percussion drilling for placement of these pile types.It was established that in the result of this action it is managed to reduce the effect of the negative skin friction influence on the piles no less than 40%[6].

    Practically all the city buildings and constructions raised on the piles are used without any essential deformation characteristics.The exception is five civilian objects,the foundations of which were erroneously damaged in the thaw unstable permafrost.Three of them almost at once after placing in operation went on the bum,two others managed to avoid the deformations-the preventive consolidation of pile foundations were made[20].

    If it is necessary to reconstruct old construction objects,further operational suitability of their foundations can be always checked by static pile check-out being directly a part of the foundations of the existing buildings by the procedure represented in the work[25,28].In case of the deficiency revealed by the check-out of bearing ability of these piles,all foundation or its part can be strengthened by hydraulic jack cave-in of specific piles in supporting layers of the thawed soils[26].

    [1] Ershov E D(ed.).Geocryology of the USSR[M].Moscow:East Siberia and Far East.Nedra,1989.

    [2] Strakhov V N,Ulomov V M(eds).Seismic Zonation of the Russian Federation,4-sheet Map[M].Moscow:Tekart,2000.

    [3] Malinovskiy S B,et al.On seismic hazard in the Magadan Oblast[M].Kolyma,2005,1:27-32.

    [4] Velli Y Y,Dokuchaev V I,F(xiàn)edorov N F.Building on Permafrost Reference Manual[M].Leningrad:Stroyizdat,1977.

    [5] Chapovskiy E G(ed.).Engineering Geology of the USSR,F(xiàn)ar East[M].Moscow:Moscow State University Press,1977.

    [6] Vlasov V P.Construction of Pile Foundations in Unfrozen and Thawing Ground of the Magadan Region[M].Yakutsk:Permafrost Institute Press,1992.

    [7] Ministry of Regional Development of the Russian Federationa[M].Moscow:Updated Edition of SNiP,2012.

    [8] Ershov E D,Khrustalev L N,Dubikov G I,et al.Engineering Geocryology[M]:Moscow:A Reference Book.Nedra,1991.

    [9] Instruction for Design and Construction of Pile Foundations in Magadan[M].Magadan:USSR Minvostokstroy,1979.

    [10] Instruction for Design and Construction of Pile Foundations in Thawed and Thawing Soils in the Magadan Oblast[M].Magadan: USSR Minvostokstroy,1988.

    [11]Melnikov Permafrost Institute.Guidelines for Design and Construction of Pile Foundations in Thawing and Thawed Ground in the Magadan Oblast[M].Yakutsk:Melnikov Permafrost Institute Press,2012.

    [12]Ministry of Regional Development of the Russian Federationb[M].Moscow:Updated Edition of SNiP,2012.

    [13]Vlasov V P,Konash V E.Results of static pile testing data analysis in Magadan.In:Building in East Siberia and Far North[J].Krasnoyarsk:Krasnoyarsk Promstroyniiproekt,1974,29:68-72.

    [14]Vlasov V P.On the effect of“rest”on the bearing capacity of piles embedded in Magadan fine soils.In:Building in East Siberia and Far North[J].Krasnoyarsk Promstroyniiproekt,Krasnoyarsk,1974,29:84-91.

    [15]Vlasov V P.Experience with pile foundation construction in Magadan[J].Osnovaniya,F(xiàn)undamenty i Mekhanika Gruntov,1988,4:2-4.

    [16]Vlasov V P.Consideration of loading friction in static pile testing in thawing soils.In:Transactions of the Magadan Promstroyniiproekt[J].Magadan Promstroyniiproekt,Magadan,1991:29-36.

    [17]Vlasov V P.Introduction of composite slurried piles in Magadan.In:Transactions of the Magadan Promstroyniiproekt.Magadan Promstroyniiproekt[J].Magadan,1991:37-45.

    [18]Vlasov V P.Engineering-geocryological studies in support of pile foundation engineering practice in areas of sporadic permafrost[J].Kolyma,1994,7-8:16-21.

    [19]Vlasov V P.Rational method for pre-construction pile tests in thawing soils.In:Proceedings of Interregional Scientific Practical Conference“Russian Building Industry[C]//Problems,Prospects and Human Resources”,East Siberian State Technological University,Ulan-Ude,1999,2:3-12.

    [20]Konash V E.Pile Foundations in Sporadic Permafrost Areas(An Example of Magadan)[M].Stroyizdat,Leningrad,1977.

    [21]Vlasov V P,Zeeva A N.A new composite pile placement method for permafrost condition in Magadan[C]//In:Proceedings of the 7th InternationalSymposium on Cold Region Development (ISCORD– 2004).Hokkaido Organizing Committee,Japan, 2004.

    [22]Ministry of Regional Development of the Russian Federation[M].SP 22.13330.2011,Soil Bases of Buildings and Structures,Moscow:Updated Edition of SNIP 2.02.01-83*.2011.

    [23] Russian Federation Committee on Construction.SP 11-105-97,Geotechnical Site Investigations[M].Moscow:Guidelines for Permafrost Areas,2003.

    [24]Rastegaev I K.Excavation of Frozen Ground in Northern Building[M].Novosibirsk:Nauka,1992.

    [25]Vlasov V P.Management of stability of pile foundation in service.In:Proceedings of the Sixth International Symposium on Permafrost Engineering[J].Journal of Glaciology and Geocryology,2004a,189-193.

    [26]Vlasov V P.Problems of bed and foundation stability in the Magadan Oblast[J].Soil Mechanics and Foundation Engineering,2004b,41(2):65-70.

    猜你喜歡
    俄羅斯科學(xué)院尼科夫州立大學(xué)
    下雪天的聲音
    程耿東:俄羅斯科學(xué)院外籍院士里的中國科學(xué)家
    腳手架樓(大家拍世界)
    美國費(fèi)里斯州立大學(xué)(FSU)大學(xué)生學(xué)習(xí)動(dòng)力來源的思考與啟示
    美國學(xué)前教育教師職前專業(yè)能力培養(yǎng)的特征及啟示——以美國塞勒姆州立大學(xué)早期兒童教育專業(yè)為例
    永凍層排水處理的案例研究
    凍融循環(huán)引起的飽和孔隙組合轉(zhuǎn)換模擬研究
    信息技術(shù)在美國大學(xué)物理課程中的應(yīng)用——以美國俄亥俄州立大學(xué)為例
    物理與工程(2014年4期)2014-02-27 11:23:09
    以人為本 服務(wù)為體——俄亥俄州立大學(xué)
    對(duì)一個(gè)人的認(rèn)識(shí)
    知識(shí)窗(2013年6期)2013-02-11 10:52:04
    国产在线男女| 亚洲欧美日韩无卡精品| 波多野结衣高清作品| av在线播放精品| 成人性生交大片免费视频hd| 国产高清三级在线| 亚洲人成网站在线播放欧美日韩| 99热网站在线观看| 亚洲欧美日韩卡通动漫| 国产精品一二三区在线看| 精品久久久久久久久久免费视频| 亚洲中文字幕一区二区三区有码在线看| 婷婷色综合大香蕉| 观看美女的网站| 久久人人爽人人片av| 成人综合一区亚洲| 一区二区三区高清视频在线| 国产伦精品一区二区三区视频9| 超碰av人人做人人爽久久| 亚洲人与动物交配视频| 中文字幕av在线有码专区| 两个人的视频大全免费| 色吧在线观看| 日韩欧美精品免费久久| 精品久久久久久久久久免费视频| 欧美精品一区二区大全| 亚洲精品色激情综合| 欧美xxxx黑人xx丫x性爽| 国产精品久久电影中文字幕| 夫妻性生交免费视频一级片| 国产私拍福利视频在线观看| 日本欧美国产在线视频| 啦啦啦观看免费观看视频高清| 欧美区成人在线视频| 精品国产三级普通话版| 在线观看午夜福利视频| 国产成人精品一,二区 | 久久综合国产亚洲精品| 亚洲成人久久爱视频| 午夜精品一区二区三区免费看| 全区人妻精品视频| 精品久久久久久久久av| av女优亚洲男人天堂| 男女那种视频在线观看| 国产大屁股一区二区在线视频| 最近视频中文字幕2019在线8| 我要看日韩黄色一级片| 亚洲七黄色美女视频| 亚洲精品国产av成人精品| 中出人妻视频一区二区| 欧美成人精品欧美一级黄| 午夜福利成人在线免费观看| 亚洲国产精品国产精品| 大又大粗又爽又黄少妇毛片口| 亚洲性久久影院| 看十八女毛片水多多多| 亚洲成人久久性| 亚洲欧美日韩无卡精品| 我的女老师完整版在线观看| 国产av不卡久久| 日本爱情动作片www.在线观看| 禁无遮挡网站| 人妻久久中文字幕网| 免费观看精品视频网站| 国产成人freesex在线| 亚洲精品自拍成人| 日本爱情动作片www.在线观看| 91精品国产九色| 国产探花极品一区二区| 国产伦精品一区二区三区视频9| 午夜福利在线观看吧| 亚洲国产精品国产精品| 免费观看在线日韩| 国产视频首页在线观看| 青春草国产在线视频 | 91av网一区二区| 国产黄片视频在线免费观看| 级片在线观看| 男的添女的下面高潮视频| 色哟哟·www| 精品人妻熟女av久视频| 亚洲欧美日韩东京热| 五月伊人婷婷丁香| 国产亚洲精品久久久com| 久久久久久久亚洲中文字幕| 亚洲精品自拍成人| 卡戴珊不雅视频在线播放| 亚洲人成网站在线播| 一个人看的www免费观看视频| 美女国产视频在线观看| 一进一出抽搐动态| 亚洲在久久综合| 91av网一区二区| 丝袜美腿在线中文| 久久久精品大字幕| 国产高潮美女av| 亚洲国产欧美人成| 欧美另类亚洲清纯唯美| 国产极品精品免费视频能看的| 国产精品人妻久久久影院| 亚洲欧美中文字幕日韩二区| 搞女人的毛片| 99久久中文字幕三级久久日本| 久久九九热精品免费| 老女人水多毛片| 看黄色毛片网站| 一级黄色大片毛片| 亚洲欧美精品专区久久| 天美传媒精品一区二区| 99久久成人亚洲精品观看| 欧美日韩一区二区视频在线观看视频在线 | 久久久成人免费电影| 18禁裸乳无遮挡免费网站照片| 国产精品麻豆人妻色哟哟久久 | 看十八女毛片水多多多| 精品久久久久久久久av| 成人亚洲精品av一区二区| 亚洲经典国产精华液单| 国产一区二区在线av高清观看| 国产黄色视频一区二区在线观看 | 精品人妻视频免费看| 女人十人毛片免费观看3o分钟| 国产久久久一区二区三区| 久久精品91蜜桃| 国产精品三级大全| 人妻久久中文字幕网| 熟女电影av网| 精品久久国产蜜桃| 国产精品蜜桃在线观看 | 欧美一区二区亚洲| 国产在视频线在精品| 国产成人精品久久久久久| 一级毛片电影观看 | 国产精品麻豆人妻色哟哟久久 | 女同久久另类99精品国产91| 看非洲黑人一级黄片| 我要搜黄色片| 欧美3d第一页| 国内精品一区二区在线观看| 五月伊人婷婷丁香| 丝袜美腿在线中文| 又爽又黄无遮挡网站| 99热这里只有是精品50| 亚洲精品自拍成人| 少妇的逼好多水| 1024手机看黄色片| 久久久久久久久久成人| 深夜精品福利| 中文字幕制服av| 婷婷精品国产亚洲av| 日韩欧美一区二区三区在线观看| 人妻系列 视频| 久久鲁丝午夜福利片| 国产蜜桃级精品一区二区三区| 久久午夜亚洲精品久久| 免费看光身美女| 免费av毛片视频| 久久久国产成人免费| 国产伦理片在线播放av一区 | 国产视频内射| 黄色日韩在线| 中文字幕熟女人妻在线| 乱码一卡2卡4卡精品| ponron亚洲| 欧美日韩乱码在线| 欧美潮喷喷水| 国产精品久久久久久精品电影| 亚洲欧美清纯卡通| 精品少妇黑人巨大在线播放 | 国产成人影院久久av| 日韩一区二区视频免费看| 91aial.com中文字幕在线观看| 欧美成人a在线观看| 国产欧美日韩精品一区二区| 久久久久久伊人网av| 国产黄色视频一区二区在线观看 | 搡女人真爽免费视频火全软件| 毛片女人毛片| 人妻制服诱惑在线中文字幕| 精品久久国产蜜桃| 老师上课跳d突然被开到最大视频| 国内少妇人妻偷人精品xxx网站| 欧美日韩乱码在线| 国产 一区 欧美 日韩| 国产乱人视频| 性色avwww在线观看| 免费av观看视频| 亚洲欧洲国产日韩| 久久精品国产亚洲网站| 欧美三级亚洲精品| 99久久无色码亚洲精品果冻| 国产激情偷乱视频一区二区| www.色视频.com| 国产人妻一区二区三区在| 日韩,欧美,国产一区二区三区 | 亚洲欧美日韩高清专用| 少妇高潮的动态图| 偷拍熟女少妇极品色| 精品久久久久久久久久久久久| 22中文网久久字幕| 成人午夜高清在线视频| 小蜜桃在线观看免费完整版高清| 99热只有精品国产| 欧美成人精品欧美一级黄| 国内精品美女久久久久久| 美女xxoo啪啪120秒动态图| 在线播放国产精品三级| 亚洲精品日韩av片在线观看| 老司机影院成人| 亚洲在久久综合| 五月玫瑰六月丁香| 99久久人妻综合| 亚洲激情五月婷婷啪啪| 美女cb高潮喷水在线观看| 亚洲无线观看免费| 亚洲国产欧美人成| 乱码一卡2卡4卡精品| 2021天堂中文幕一二区在线观| videossex国产| 尾随美女入室| 国产精品三级大全| 国产高清三级在线| www.色视频.com| 国产视频内射| 日韩av不卡免费在线播放| 精品久久久久久久末码| 精品少妇黑人巨大在线播放 | 最近的中文字幕免费完整| 国产白丝娇喘喷水9色精品| 有码 亚洲区| 国产91av在线免费观看| 欧美又色又爽又黄视频| 1024手机看黄色片| 熟妇人妻久久中文字幕3abv| 久久精品久久久久久噜噜老黄 | 中文字幕制服av| 三级男女做爰猛烈吃奶摸视频| 综合色av麻豆| 精品久久久久久久久久久久久| 国产三级在线视频| 亚洲欧美中文字幕日韩二区| 夜夜看夜夜爽夜夜摸| 免费观看人在逋| 欧美一级a爱片免费观看看| 精品久久久久久久久亚洲| 能在线免费观看的黄片| .国产精品久久| 亚洲欧洲日产国产| 国产高清三级在线| 色综合亚洲欧美另类图片| 干丝袜人妻中文字幕| 国产一级毛片七仙女欲春2| 岛国在线免费视频观看| 国产伦理片在线播放av一区 | 日韩欧美国产在线观看| 看非洲黑人一级黄片| 午夜激情福利司机影院| 我的老师免费观看完整版| 女人十人毛片免费观看3o分钟| 亚洲人成网站在线观看播放| 床上黄色一级片| 亚洲国产精品久久男人天堂| www日本黄色视频网| 日本欧美国产在线视频| 亚洲中文字幕日韩| 在线观看午夜福利视频| 国产精品1区2区在线观看.| 免费看美女性在线毛片视频| 看片在线看免费视频| 日韩欧美三级三区| 尤物成人国产欧美一区二区三区| 少妇被粗大猛烈的视频| 一级av片app| 男的添女的下面高潮视频| 中国美女看黄片| 日本熟妇午夜| 搡老妇女老女人老熟妇| 久久久久久久久久成人| 99九九线精品视频在线观看视频| 久久久欧美国产精品| 免费不卡的大黄色大毛片视频在线观看 | 欧美性猛交╳xxx乱大交人| 国产精品麻豆人妻色哟哟久久 | 97人妻精品一区二区三区麻豆| 国产精品嫩草影院av在线观看| 伦理电影大哥的女人| 青春草亚洲视频在线观看| 大又大粗又爽又黄少妇毛片口| 九九久久精品国产亚洲av麻豆| 啦啦啦啦在线视频资源| 只有这里有精品99| 青春草国产在线视频 | 最近手机中文字幕大全| av天堂中文字幕网| 美女内射精品一级片tv| 欧美不卡视频在线免费观看| 一区二区三区四区激情视频 | 天天躁日日操中文字幕| 赤兔流量卡办理| 深夜精品福利| 成人美女网站在线观看视频| 国产精品免费一区二区三区在线| 天堂影院成人在线观看| 热99在线观看视频| 国产单亲对白刺激| 国产三级在线视频| 欧美丝袜亚洲另类| 日韩一本色道免费dvd| 男人和女人高潮做爰伦理| 国产精品1区2区在线观看.| 国产高清有码在线观看视频| 久久亚洲国产成人精品v| 久久久久久国产a免费观看| 国产日韩欧美在线精品| 日韩三级伦理在线观看| av在线老鸭窝| 深夜精品福利| 欧美极品一区二区三区四区| 男女下面进入的视频免费午夜| 桃色一区二区三区在线观看| 国产av在哪里看| 午夜激情福利司机影院| 日韩精品青青久久久久久| 成人av在线播放网站| 久久精品91蜜桃| 一边摸一边抽搐一进一小说| 在线a可以看的网站| 毛片一级片免费看久久久久| 日韩国内少妇激情av| or卡值多少钱| 色5月婷婷丁香| 舔av片在线| 久久久a久久爽久久v久久| 最好的美女福利视频网| 国产亚洲精品av在线| 一进一出抽搐gif免费好疼| 亚洲国产欧美在线一区| 国产精品久久久久久久久免| 一级黄色大片毛片| 成年女人永久免费观看视频| 国产精品久久电影中文字幕| 2022亚洲国产成人精品| 亚洲欧美清纯卡通| 黄色配什么色好看| 99九九线精品视频在线观看视频| 丝袜喷水一区| 少妇人妻一区二区三区视频| 99久久精品国产国产毛片| 欧美日本视频| 国产成人精品婷婷| 99热这里只有精品一区| 悠悠久久av| 日日干狠狠操夜夜爽| 成人欧美大片| 热99在线观看视频| 非洲黑人性xxxx精品又粗又长| 中文亚洲av片在线观看爽| 久久6这里有精品| 国产综合懂色| 亚洲一区二区三区色噜噜| av在线播放精品| 亚洲三级黄色毛片| 97人妻精品一区二区三区麻豆| 久久午夜亚洲精品久久| 久久久久久久久久成人| 国产精品一及| 狂野欧美白嫩少妇大欣赏| 日韩,欧美,国产一区二区三区 | 婷婷色综合大香蕉| 一边摸一边抽搐一进一小说| a级一级毛片免费在线观看| 久久国产乱子免费精品| 性色avwww在线观看| 午夜视频国产福利| 少妇被粗大猛烈的视频| 日本欧美国产在线视频| 内射极品少妇av片p| 亚洲精品色激情综合| 久久精品夜色国产| 看片在线看免费视频| 国产精品国产三级国产av玫瑰| 99热这里只有精品一区| 男的添女的下面高潮视频| 午夜福利视频1000在线观看| 色哟哟哟哟哟哟| 亚洲欧美中文字幕日韩二区| 国产极品天堂在线| 晚上一个人看的免费电影| 色噜噜av男人的天堂激情| 欧美极品一区二区三区四区| 日日撸夜夜添| 大又大粗又爽又黄少妇毛片口| 国产成人精品婷婷| 国产成人午夜福利电影在线观看| 欧美日韩乱码在线| 国产黄片美女视频| 毛片女人毛片| 欧美+亚洲+日韩+国产| 欧美色欧美亚洲另类二区| 国产av在哪里看| 久久久国产成人精品二区| 五月伊人婷婷丁香| 日韩欧美国产在线观看| 哪里可以看免费的av片| 免费av观看视频| 我要搜黄色片| 亚洲经典国产精华液单| 国内精品宾馆在线| 22中文网久久字幕| 又爽又黄无遮挡网站| 欧美bdsm另类| 国产亚洲av片在线观看秒播厂 | 国产精品一区二区性色av| 久99久视频精品免费| 2022亚洲国产成人精品| 国产精品蜜桃在线观看 | 99久国产av精品| 成人国产麻豆网| 中文在线观看免费www的网站| 亚洲精品色激情综合| 欧美潮喷喷水| 在线观看美女被高潮喷水网站| 黄色一级大片看看| 男人的好看免费观看在线视频| 亚洲中文字幕一区二区三区有码在线看| 成人性生交大片免费视频hd| 国产三级在线视频| 亚洲不卡免费看| av免费在线看不卡| av专区在线播放| 淫秽高清视频在线观看| 久久久久国产网址| 春色校园在线视频观看| 男人舔奶头视频| 又爽又黄无遮挡网站| 成人三级黄色视频| 欧美丝袜亚洲另类| 国产爱豆传媒在线观看| 亚洲高清免费不卡视频| 尾随美女入室| 在线免费观看的www视频| 免费看av在线观看网站| 永久网站在线| а√天堂www在线а√下载| 亚洲欧美日韩高清在线视频| 18禁黄网站禁片免费观看直播| 国产真实乱freesex| 欧美区成人在线视频| 我要搜黄色片| 小蜜桃在线观看免费完整版高清| 亚洲一级一片aⅴ在线观看| 性欧美人与动物交配| 边亲边吃奶的免费视频| 久久韩国三级中文字幕| 国产伦一二天堂av在线观看| 日韩欧美三级三区| 欧洲精品卡2卡3卡4卡5卡区| 日韩人妻高清精品专区| 亚洲高清免费不卡视频| 黄色一级大片看看| 亚洲av第一区精品v没综合| 看黄色毛片网站| 国产一区二区在线av高清观看| 亚洲美女搞黄在线观看| 亚洲精品久久久久久婷婷小说 | 欧美一区二区亚洲| 变态另类成人亚洲欧美熟女| 乱系列少妇在线播放| 校园人妻丝袜中文字幕| 国产美女午夜福利| 3wmmmm亚洲av在线观看| 亚洲在线观看片| 九九热线精品视视频播放| 亚洲在久久综合| 午夜老司机福利剧场| 男的添女的下面高潮视频| 人妻系列 视频| 男女下面进入的视频免费午夜| 精品人妻一区二区三区麻豆| 色哟哟·www| 两性午夜刺激爽爽歪歪视频在线观看| 国产成人影院久久av| 男女啪啪激烈高潮av片| 女的被弄到高潮叫床怎么办| 国产精品一区二区三区四区久久| 欧美日韩国产亚洲二区| 男女视频在线观看网站免费| 成人毛片a级毛片在线播放| 桃色一区二区三区在线观看| 日日撸夜夜添| 亚洲欧美成人精品一区二区| 一个人观看的视频www高清免费观看| 国产极品精品免费视频能看的| 日韩一区二区三区影片| 色综合亚洲欧美另类图片| 日韩一区二区视频免费看| 69人妻影院| 日本成人三级电影网站| 简卡轻食公司| 日韩中字成人| 欧美最黄视频在线播放免费| 国产黄色小视频在线观看| 熟女电影av网| 99热这里只有是精品在线观看| 菩萨蛮人人尽说江南好唐韦庄 | 亚洲国产精品合色在线| 精品欧美国产一区二区三| av在线观看视频网站免费| 亚洲第一电影网av| 国产精品爽爽va在线观看网站| 国产黄片美女视频| 狂野欧美白嫩少妇大欣赏| 午夜a级毛片| 啦啦啦观看免费观看视频高清| 一个人免费在线观看电影| 全区人妻精品视频| 欧美3d第一页| 国产精品人妻久久久影院| 亚洲,欧美,日韩| 性色avwww在线观看| 日本五十路高清| 亚洲国产精品久久男人天堂| 成人特级av手机在线观看| 国产白丝娇喘喷水9色精品| 亚洲国产色片| 看非洲黑人一级黄片| 国产探花在线观看一区二区| 欧美zozozo另类| 一进一出抽搐gif免费好疼| 成熟少妇高潮喷水视频| 麻豆国产97在线/欧美| 日韩,欧美,国产一区二区三区 | 国产激情偷乱视频一区二区| 一个人观看的视频www高清免费观看| 成人毛片a级毛片在线播放| 午夜精品国产一区二区电影 | 国产高清三级在线| 欧美日韩乱码在线| 精品一区二区三区人妻视频| 国产单亲对白刺激| 欧美精品国产亚洲| 色综合色国产| 午夜激情福利司机影院| 99热网站在线观看| 亚洲性久久影院| 毛片女人毛片| 婷婷色综合大香蕉| av专区在线播放| 六月丁香七月| 久久久午夜欧美精品| 精品人妻一区二区三区麻豆| 欧美一区二区亚洲| 亚洲一区二区三区色噜噜| 欧美成人免费av一区二区三区| 少妇的逼好多水| 国产白丝娇喘喷水9色精品| 午夜激情欧美在线| 我的女老师完整版在线观看| 久久久久久久久久成人| 亚洲欧美日韩高清专用| 一区福利在线观看| 天堂av国产一区二区熟女人妻| 久久久精品94久久精品| 亚洲,欧美,日韩| 日韩欧美精品免费久久| 国产精品无大码| 十八禁国产超污无遮挡网站| 麻豆国产97在线/欧美| 国产午夜精品论理片| 午夜福利在线观看吧| 最好的美女福利视频网| 亚洲欧美日韩高清在线视频| 亚洲国产精品成人综合色| 此物有八面人人有两片| 国产又黄又爽又无遮挡在线| 免费大片18禁| 99久久久亚洲精品蜜臀av| 中文字幕免费在线视频6| 国国产精品蜜臀av免费| 亚洲人成网站在线播放欧美日韩| 国产精品伦人一区二区| 国产一区二区激情短视频| 变态另类成人亚洲欧美熟女| 亚洲一区高清亚洲精品| 国产av不卡久久| 伦理电影大哥的女人| 99热全是精品| 精品午夜福利在线看| 白带黄色成豆腐渣| 久久精品国产亚洲网站| 亚洲国产欧美在线一区| 国语自产精品视频在线第100页| 非洲黑人性xxxx精品又粗又长| 97超视频在线观看视频| 国产精品一区二区三区四区免费观看| 午夜激情欧美在线| 黑人高潮一二区| 亚洲色图av天堂| 欧美色欧美亚洲另类二区| 亚洲国产欧洲综合997久久,| h日本视频在线播放| 国产69精品久久久久777片| 天堂√8在线中文| 在线a可以看的网站| 亚洲精品456在线播放app| 亚洲国产欧美人成| 国产精品久久久久久久电影| 成人亚洲精品av一区二区| 最近视频中文字幕2019在线8| 国产精品一区二区性色av| 直男gayav资源| 观看美女的网站| 男女啪啪激烈高潮av片| 又黄又爽又刺激的免费视频.| 色播亚洲综合网|