• <tr id="yyy80"></tr>
  • <sup id="yyy80"></sup>
  • <tfoot id="yyy80"><noscript id="yyy80"></noscript></tfoot>
  • 99热精品在线国产_美女午夜性视频免费_国产精品国产高清国产av_av欧美777_自拍偷自拍亚洲精品老妇_亚洲熟女精品中文字幕_www日本黄色视频网_国产精品野战在线观看 ?

    馬加丹凍土特征和基礎(chǔ)類型選擇

    2014-03-19 03:43:44VladimirVlasov
    關(guān)鍵詞:俄羅斯科學(xué)院尼科夫州立大學(xué)

    Vladimir P.Vlasov

    (1.俄羅斯科學(xué)院西伯利亞分院,麥爾尼科夫凍土研究所 東北凍土站,馬加丹685000,俄羅斯;2.俄羅斯東北州立大學(xué),馬加丹685000,俄羅斯)

    0 General description

    The city of Magadan is situated in the southern permafrost zone of Russia's Far Northeast[1].It lies on the coast of the Gulf of Taui in the Sea of Okhotsk where the StaritskyPeninsula joinsthe mainland (Fig.1).Magadan is bounded by Nagaev Bay on the west and by Gaertner Bay on the east.The mountain ranges to the north and south have elevations of 200 m to 700 m above sea level.The city is crossed by Magadanka Creek with a wide,swampy valley.Most part of the city is located south-west of Magadanka Creek,on the Magadanka-Nagaev watershed.Surface and subsurface waters of the watershed drain into Magadanka Creek to the north-east and into Nagaev Bay to the west.The watershed has a maximum elevation of 120 m above sea level.Its northeastern slope is gentle(3° to 5°),while the western slope is steep and abrupt.

    Fig.1 Location of Magadan

    Magadan is located in an area of high earthquake activity[2].Earthquakes of magnitude 8~9 are possible in the area[3].

    The climate is monsoonal.The annual mean air temperature is-3.6℃,with daily means above 0℃from mid-May to mid-October.Mean annual precipitation is 550 mm,of which about half falls as rain.Winds are generally from the west and southwest in summer and from the northeast and east in winter.The mean annual wind speed is 5.6 m/s.The number of days with snow storms is about 50.Snow cover is up to 0.3 m deep and characterized by with redistribution[4].

    1 Geology and permafrost

    The geological structure of the area is determined by its location within the Magadan Intrusion[5].The upper 10~15 m of the geological section consist of Quaternary deposits underlain by rocks of Neogene age more than 100 m in thickness.

    The Neogene rocks include the marine pebbles with sand and the lagoon and continental materials represented by sandy clays,gravels and pebbles,and granodiorite weathered and solid rocks.The former comprise the southeastern slope of the Magadanka-Nagaev watershed,while the latter make up the remaining part of the city area.The Quaternary sediments that blanket the Neogene rocks are in turn subdivided into alluvial,colluvial,and residual.

    The alluvial deposits occur in the valley of Magadanka Creek and comprise its floodplain and terraces.Lithologically,they consist of sand,gravel and cobble in widely varying proportions.Sands have varying compositions from silty to gravelly.The alluvium 10 m or more in thickness often contains beds and layers of gravelly sandy and clayey silts.

    The colluvial deposits occur everywhere on the slopes.They consist largely of silty sands,sandy silts,and clayey silts with varying amounts of boulders,cobbles and pebbles of granodiorite.At depth,the colluvial deposits gradually merge with the Neogene rocks of similar composition.The thickness of this layer is a few meters,but increases up to 10 m along the slope bases.

    The residual soils derived from the weathering of the underlying rocks lie at greater depths.These soils together with the bedrock occur near the surface only on the steep slopes.The thickness of the residuum is up to 10-15 m.

    The geocryological conditions in the Magadan area are highly variable and complicated.Permafrost occurs as isolated lenses and patches in thawed ground.The permafrost bodies vary in size from 100 to 10 000 m2.Their thickness varies from 2 to 30 m,depending on size.The depth to the permafrost table generally is 3 to 5 m,but may be deeper in places.Two-layer permafrost is occasionally encountered,in which the layers of frozen ground are separated by thawed ground.

    The local permafrost is characteristically warm,with temperatures at the depth of zero annual amplitude close to 0℃,normally about-0.1 to-0.2℃.Exceptions to this are the permafrost bodies in wet low-lying and high areas of the city,where ground temperatures are-0.5 to-1℃.Presently,however,the size and thickness of permafrost bodies can only be judged for the time of a geotechnical site investigation,because any disturbance of the heat exchange at the ground surface by construction activities causes immediate changes to the thermal state of the warm permafrost.Observations indicate that the permafrost at Magadan is gradually degrading,with global climatic change contributing to the trend.

    The frozen gravels and sands generally have a massive cryostructure,while silts and silty sands have a layered or reticulate cryostructure.Ice contents are highest in the upper permafrost layers.Total moisture contents down to 8~10 m depths,in some cases to lower depths,are 0.08~0.12 for the frozen gravels,0.18~0.22 for the sands and sandy silts,and 0.3~0.35 for the clayey silts.The layers with moisture contents of 0.4~0.6 are encountered.At these moisture (ice)contents,the frozen soils are often thaw-unstable and may produce settlements of 3 to 18 cm/m.

    The thawed soils surrounding the permafrost bodies are not inferior in engineering properties to normal unfrozen soils,and may even be superior in some parameters[6].This is because the thawed soils were in a perennially frozen state in the geological past,but gradually warmed due to climatic and anthropogenic impacts.The post-cryogenic structure characteristic of thawed soils has been completely destructed.The action of the soil weight accompanied by aggregate breakup of the mineral framework in the saturated medium caused repacking of the solid particles,expulsion of the excess pore water,and filling of the pores with fines.These processes resulted in increased soil density and improved physical properties.The former frozen state of the soils is evidenced by geotechnical investigation data(Table 1).

    Table 1 Averaged physical characteristics of frozen and thawed soils in Magadan(depth interval from 3 to 30 m)

    The frost-related processes active in the Magadan area include only frost heaving in oversaturated finegrained soils and silty sands dominant in the upper part of the geological section,especially in the active layer,as well as icing formation at the foot of steep hillslopes and in the Magadanka Creek valley.

    Groundwater is encountered in most of the construction sites.Its occurrence is due to the rough terrain,deep seasonal thaw(down to 3.5 m),and abundant precipitation.Porous and fractured granodiorite aquifers are present.Most common are the so-called seasonal perched water bodies in thawed sands and gravels.Due to the high variability in soil facies,they occur as isolated lenses with limited water flow.Although yields are low,serious difficulties for earthwork can be created during snowmelt in the spring and incessant rains in the summer and autumn.

    Yields of the Neogene sediments are generally low.Supra-,intra-and subpermafrost waters are encountered occasionally in sands and gravels in the depth interval from 1 to 12 m.They are recharged by infiltrating precipitation and by water flowing from fractured aquifers at the foot of steep hillslopes.As a result,the Neogene aquifers at these locations may have heads of up to 5 m.The layer of alluvial gravel,6 to 7 m in thickness,in the Magadanka valley(within the floodplain and partially in the low terrace)has highest yields.Gravel aquifers here are 200 to 300 m or more in width.In summer,the steady water level rises to the ground surface.In winter,the head may increase to 1~2 m,resulting in the formation of icings throughout the winter.Protective dikes are constructed along the river bank to eliminate the icing problems on engineering structures.

    2 Selection of pile placement method

    The co-existence of frozen and thawed ground (Fig.2)within a construction site dictates the selection of foundation designs.Geocryological considerations include:1)warm permafrost;2)variable depths to the top of permafrost,often far below the active layer,and occasional two-layered permafrost with thick thawed interlayers;3)strong spatial and temporal variability of the permafrost bodies in response to shortterm climatic variations and construction activities;4) occurrence of ice-rich and hence thaw unstable soils; 5)seasonal soil freezing to depths of 1 to 3.5 m;during very cold winters with low snowfall soil freezing may be as deep as 4~5 m,resulting in frozen layers which remain unthawed for one or two summers or in newly formed permafrost;6)great depths(8~20 m or more)to the firm strata with sufficient strength and stability to safely support the buildings and structures.

    Fig.2 An example of the geotechnical cross-section for a construction site

    For such geocryological conditions,the Russian building code[7]stipulates for the use of Principle II,or the active method of constructing in permafrost.This method is best suited for sites underlain by bedrock or consolidated soils,including thawed and frozen soils whose deformation and strength properties are not changed on thawing.However,these materials are often overlain by unconsolidated sediments.Principle II therefore requires that measures be undertaken to minimize deformation of the foundation materials(e.g.,pre-thawing of frozen ground,replacement of frozen ground with thawed coarse materials,use of piles extending below a thaw-unstable stratum)and the superstructures be designed to accommodate differential settlements.The latter involves the use of structural elements that prevent additional stresses or the structure of a building must be of sufficiently rigid construction to resist these stresses.In general,these structural measures in combination with techniques to mitigate differential settlements are incorporated into the seismic de-sign requirements for the seismically active southern permafrost zone.

    If follows from above that the viability,stability and serviceability of buildings and structures in Magadan must be provided by selection of a proper design for the foundation and superstructure,engineering preparation of the site,and control of the interaction of the foundation with the ground.A set of all or part of the listed measures is termed techniques for ensuring building stability[8].

    The goal of the designer is to select the foundation type and design best suited,from technical and economic considerations and past experience,for the local soil and permafrost conditions.

    3 Pile foundations in Magadan

    Piles are the main foundation type for Magadan.They create the opportunity to reduce subsoil deformations to safe values for structural competences due to slotting of thaw unstable layers with the deepening of their bottom ends in bearing layers of thawed soils.For this purpose the very specific technologies:composite drilled-and-slurried piles(Fig.3)and drilled-anddriven piles(Fig.4)are used here.

    Fig.3 Structure diagram of composite drilled and slurried piles:1-drilling;2-road metal driving in the slurry on the drill hole;3-rubbly pad driving by the way of tamping;4-concreting of the tamped pile part;5-reinforced concrete member driving in the hole;6-vibratory pole driving into the pile monolithic concrete;7-performed composite drilled and slurried pile

    Fig.4 Structure diagram of drilled-and-driven piles1-pile hole drilling;2-hole grouting for slurry;3-drill holes;4-pile driving from the hole bottom;5-pile driven at the project reference

    Permafrost reasoning of pile placement technologies relating to the local construction conditions is given in Konash and Vlasov.The results of the accomplished studies are reflected in the regional building regulations[9-10].In view of new data and requirements,these regulations were updated and published as Guidelines for Design and Construction of Pile Foundations in Thawing and Thawed Ground in the Magadan Oblast[11].This document amends and develops the mandatory provisions of the Russian construction codes forfoundation engineering in the permafrostregion[7,12].For practical project development and foundations the regional resistivity amount of thawed soils under the pile tips(Tables 2 and 3)and on the side surface(Table 4),specific values of the negative friction force(Fig.5)as well as the correction factors dependent on the accepted practice of pile placement (composite drilled-and-slurried pile or drilled-anddriven pile)are described.All data necessary for design analyses have been obtained from field tests[6,13-19].Their certainty is controlled by many experimental and check tests of different constructions and pile standard size in the most various permafrostgeological conditions as well as long-term project and construction practice of pile foundation on the thawing and thawed soils of the Magadan region[6,15,20-21].

    For pile foundation design in the Magadan area,in the capacity of calculating bearing course thawed soils for composite drilled-and-slurried piles and drilled-and-driven piles underlying under the permafrost thickness and in the absence thereof under the layer of seasonal frost-thawing which within the bounds of the compressible thickness depths give summary compression not exceeding the tolerated one by the standards for constructing class of buildings and constructions[22]are used.At determining the bearing course of pile foundation soils it is taking into account that the construction region is in the seismically active zone.In this respect the pile embedment depth from the ground surface or from the foundation pit bottom must be no less than 4 m and where there are water saturated silt sands in the foundation-no less than 8 m[11].

    The selection of pile type and pile arrangement (e.g.pile clusters,fields,rows)is made on the basis of concrete conditions of construction site characterized by the materials of engineering permafrost investigations which are performed according to SP 47.13330.2012(Federal Agency for Construction,Housing and Utilities(Gosstroy),2012)and SP 11-105-97[23]and construction and technological peculiarities of future building or construction taking into account the dimensions and intention of their underground facilities as well as the design loads on the foundation.Where thick permafrost is present with its base located at a depth of 10 m or more from the foundation pit bottom,piles are penetrated placed into the thawed soil barred by permafrost,by composite drilledand-slurry method(see Fig.3).At smaller depths to the permafrost base,drilled-and-driven piles(see Fig.4)are used.If permafrost is absent,spread footings,strip footings or mat foundations are used.

    Table 2 Design resistance of thawed soils R under composite drilled-and-slurried piles tips

    Table 3 Design resistance of thawed soils R under drilled-and-driven piles tips

    Table 4 Design resistance of thawed soils fialong the pile skin

    Drilling for pile placement is made by drilling machines with cable tool percussion effect.This drilling method is used in the soils of any type and structure (with heavy percentage of coarse material,boulders etc)as well as thermal state-without restriction[24].The usage of other hole boring method for the purposes of pile foundation on the territory of Magadan turned out to be difficult because of dreadful garishness of frozen soiled and hydrogeological conditions of construction sites[5].

    Table 5 Design values of negative friction fn,iof thawing soils

    Cable tool percussion drilling is that the rock drill dropping at a height(about 1 m)damages mine rock by its chisel nose.The water periodically pouring in the deepening hole mixes with finely crushed soil and makes it into liquid-like saturated soil-drilling slurry taking out of the hole by the sludge after every drilling run.The disadvantage of the method is an incomplete cleanup.As a rule,on the hole bottom the layer of slurry at a height from 10 to 30 cm or frequently more leaves unselected.Besides the soil at some though small depths lower than the hole bottom can be in a few loosened state.

    Usually the drilling consists of the borehole wall lining by casing metal pipes.Depending on the complexity of frozen ground and hydrogeological conditions of the construction site the well casing can be effected in two ways.In the former case the hole is drilled at once at all the depths settled by the project and only then it is cased by metal pipe of corresponding diameter.This method is used when soil hole walls have sufficient temporal stability and can retain their entirety for more period of time after the drilling termination.The second way is used in the case of unstable hole walls which start already to ruin while drilling.It consists of the well casing by separate passover offsets driving in them one after one in proportion to driving in unstable soil.Usually the passover offsets are joined by electro-welding.

    Pipe swaging(entirely or partly)is made by rock drill and its removing by instrumental rope winch of drilling machine[20,24].

    Composite drilled and-slurried piles are composite constructions placed into the deep holes:on the bottom they consist of the tamped concrete pole resting on the reinforced road metal of the drill hole with slurry vestiges and an upper reinforced drop concrete member embedded in the tamped part of the pile monolithic pole to a depth equal to at least three times in the diameter of the hole;though the biggest diameter of the pile crosssection must be 15 cm less than pile diameter where composite pile is made.

    The main criterion defining the quality of this technology of the foundation installation and consequently the formation of bearing sand core in the pile bottom is firm contact of a tamped concrete pole with the drill hole.The problem of quality of this contact can be aggravated by the presence of slurry vestiges and loosened rock between the elements named above.The matter is that the density of this slurry will be always lower than the natural density soil of undisturbed structure.The way out is that the coarse rock is tamped in the slurry vestiges and loosened pile bottom[6].

    As tamper it is used the rock drill of drilling machine.For this purpose the rock drill is provided with the interchangeable nose in the form of the round metal plate with thickness of 30~50 mm the diameter of which must be 1 cm less than the hole diameter.In the process of road metal tamper preliminary buried at the hole bottom by the layer exceeding the height of slurry vestiges no less than twofold,the consolidation deformations of road metal interpenetration into the slurry and than in the soil of the hole bottom and its walls are taken place.

    The consolidation of the road metal surface is performed up to the getting of the magnitude of the‘refusal'not exceeding 2 cm for the latest five tamper blows.Though the total amount of the refusal magnitudes must be no less than the height of slurry vestiges layer measured before the beginning of tamping.As the result densely packed structure of road metal-and-slurry pad is created.Along with the compacted sand core under the bottom of the drill hole it creates the pile structural bearing by the means of which the vertical impulse is transmitted from the service loading though the composite construction(tamped pit and reinforcedconcrete pole)on the underlying soils of building or construction foundations.

    At the end of road metal-and-slurry pad installation the tamped concrete pole which is the intermediate element of the composite pile is performed.It has very important practical value for future foundation because varying the height of the tamped part where the reinforced concrete pile element is embedded the necessary foundation depth settled by the project is provided.

    The supratamped pile element is made of the concrete mixture of the class not lower than B-20 with the water-cement ratio WC 0.45~0.55 and the cone slump 5~10 cm.As the anti-freezing agent-the accelerator of the concrete strength development sodium chloride in a rate of 2.5% ~3.5% of the cement weight in the concrete mixture is applied.

    In the holes the concrete mixture is put by the method of vertically movable pipes(VMP)with the diameter of 250~325 mm.The concrete mixture settled on the projected height is tightened by the vibrating pile driver while lowering the reinforced concrete pole into the tamped pile shaft.The last one is embedded in the concrete mixture of the tamped shaft.The abutment joint between these elements must be no less than three hole diameter.

    Composite drilled-and-slurried piles can be settled in the holes with extracted and non extracted casing pipe.The last one is used when there is no the possibility of qualitative pile production in the holes with the extracted protecting cover.Usually there are such conditions on the slump and thermostatic lots as well as on the sites with ice-rich embedded permafrost with the interlayer of well filtering thawed coarse and sandy soils where under the pressure of the permafrost ground waters heavily refillable due to the ice melt-out from the permafrost the composite pile shaft on the separate hole sites can be damaged during the concrete mixture con-solidation of its tamped part.

    The advantage of composite drilled-and-slurried piles driving in the soil is the possibility to produce them in any lengths and diameter and place accurately enough on the project references either at the bottom or at the top of the piles,minimizing the building vestiges.This type of piles turned out to be very popular during the building of the city urban districts,the construction area of which is situated on the development sites of intermediate discontinuous permafrost with a capacity of more than 10 m[17,21].At the presence in the structure base ice lenses of smaller dimensions the foundations have been already installed from drilled and-driven piles[6].

    Drilled-and-driven piles are solid reinforced concrete piles designed to take account of the pile-driving impact loads driven into the bottom of pilot holes in the bearing layer of thawed soils.Pilot holes must be drilled on 0.5~1 mm lower than the permafrost base and have the diameter larger than the diagonal of the cross-section of the pile in 2~5 cm.In Magadan on the building sites for driving it is used the standards reinforced concrete piles with the lengths of 5~12 m and the cross-section of 30 cm×30 cm.Their placement in the piles is performed by the autocrane of the appropriate bearing capacity and the driving into the soil-by the tubular diesel hammer with the weight of the striking part in 1.8,2.5 and 3.5 ton-force.

    Before the placement piles are cleaned of the slurry.The thickness of its vestiges shouldn't exceed 30 cm.The existence of frozen slurry on the hole bottom is not admitted.For the exception of the last one the holes are drilled with the borehole wall lining by casing pipes.However in the frozen soils where the hole walls can retain temporal stability it is not obligatory to effect their casing on condition that the drill hole for further driving into the thawed soil will be performed instantly after the finishing of drilling but no later than 4 hours after the hole clearing.It is to be noted that the casing pipes must be taken out of the holes before the beginning of pile driving as after that this procedure will be extremely difficult or even impossible.

    Piles settled in the holes are driven lower than their bottom in the thawed soil at depths settled by the project whereby the base load-bearing capacity will provide the perception of calculated load from the future construction including the additional load when the permafrost thaws and consolidates around the pile.The control pile refusal(magnitude of its diving in the soil for one hammer blow)allocated by the project organization serves as the criterion of driving termination[11].

    The measurement of the refusals is performed in the end of driving when the depths diving in the soil riches the project references or the magnitudes of the actual refusals come close to the calculating values.The driving is ceased if the average refusal value in three consecutive blow counts,10 hammer blows in each doesn't exceed the magnitude of control refusal pointed in the piling project.

    Piles embedded lower than the hole bottom less than one meter(if it is not required by the project) and given pile refusal during three consecutive blow counts are subjected to the inspection for the causation that complicates pile driving.In this case on the basis of studying the materials of engineering and geological research and the capacity of utilizable diesel pile hammer it is decided the question about the measuring of the piles lengths,drilling depth and the replacement of pile-driving equipment.The piles given the refusal that is much more than the pile refusal are subjected to the check-out(dynamic and static)after the‘rest’,time limits of which for different types of the thawed soils taking into account their thixotropic properties are contained in the guidelines[11].As the results of such check-out the character of the future pile usage in the foundation structure(with the redundancy of specific piles or without their redundancy)is settled.

    4 Conclusions

    Project development and foundation installation with the usage of composite drilled-and-slurried piles and drilled-and-driven piles on the territory of Magadan is performed in accordance with the requirements of the local building code[11],drafted in the development of mandatory provisions of national standards and rules and regulations concerning the regional building peculiarities under the conditions of isolated patches expansion of permafrost during their simultaneous existence with the thawed soils.

    The importance of the placement methods of these pile types on the territory of the city with very specific permafrost conditions is that due to them the construction sites with most diverse diving of lenses and permafrost regions underlying by the thawed soils which are reliable base for future foundations of buildings and constructions here.Complete slotting of thaw unstable layers and piles diving in the thawed soils provide required operational stability of construction objects.Besides high bearing pile capacity embedded on the thawed soil foundation it should be noted their adaptation for negative skin friction when the permafrost thaws and consolidates around the pile.Since the drill holes are larger in diameter than the cross-section of the piles,the annular space between the pile and the hole can be filled with any type of slurry.In Magadan the common practice is to use drilling slurry produced in large quantities during cable tool percussion drilling for placement of these pile types.It was established that in the result of this action it is managed to reduce the effect of the negative skin friction influence on the piles no less than 40%[6].

    Practically all the city buildings and constructions raised on the piles are used without any essential deformation characteristics.The exception is five civilian objects,the foundations of which were erroneously damaged in the thaw unstable permafrost.Three of them almost at once after placing in operation went on the bum,two others managed to avoid the deformations-the preventive consolidation of pile foundations were made[20].

    If it is necessary to reconstruct old construction objects,further operational suitability of their foundations can be always checked by static pile check-out being directly a part of the foundations of the existing buildings by the procedure represented in the work[25,28].In case of the deficiency revealed by the check-out of bearing ability of these piles,all foundation or its part can be strengthened by hydraulic jack cave-in of specific piles in supporting layers of the thawed soils[26].

    [1] Ershov E D(ed.).Geocryology of the USSR[M].Moscow:East Siberia and Far East.Nedra,1989.

    [2] Strakhov V N,Ulomov V M(eds).Seismic Zonation of the Russian Federation,4-sheet Map[M].Moscow:Tekart,2000.

    [3] Malinovskiy S B,et al.On seismic hazard in the Magadan Oblast[M].Kolyma,2005,1:27-32.

    [4] Velli Y Y,Dokuchaev V I,F(xiàn)edorov N F.Building on Permafrost Reference Manual[M].Leningrad:Stroyizdat,1977.

    [5] Chapovskiy E G(ed.).Engineering Geology of the USSR,F(xiàn)ar East[M].Moscow:Moscow State University Press,1977.

    [6] Vlasov V P.Construction of Pile Foundations in Unfrozen and Thawing Ground of the Magadan Region[M].Yakutsk:Permafrost Institute Press,1992.

    [7] Ministry of Regional Development of the Russian Federationa[M].Moscow:Updated Edition of SNiP,2012.

    [8] Ershov E D,Khrustalev L N,Dubikov G I,et al.Engineering Geocryology[M]:Moscow:A Reference Book.Nedra,1991.

    [9] Instruction for Design and Construction of Pile Foundations in Magadan[M].Magadan:USSR Minvostokstroy,1979.

    [10] Instruction for Design and Construction of Pile Foundations in Thawed and Thawing Soils in the Magadan Oblast[M].Magadan: USSR Minvostokstroy,1988.

    [11]Melnikov Permafrost Institute.Guidelines for Design and Construction of Pile Foundations in Thawing and Thawed Ground in the Magadan Oblast[M].Yakutsk:Melnikov Permafrost Institute Press,2012.

    [12]Ministry of Regional Development of the Russian Federationb[M].Moscow:Updated Edition of SNiP,2012.

    [13]Vlasov V P,Konash V E.Results of static pile testing data analysis in Magadan.In:Building in East Siberia and Far North[J].Krasnoyarsk:Krasnoyarsk Promstroyniiproekt,1974,29:68-72.

    [14]Vlasov V P.On the effect of“rest”on the bearing capacity of piles embedded in Magadan fine soils.In:Building in East Siberia and Far North[J].Krasnoyarsk Promstroyniiproekt,Krasnoyarsk,1974,29:84-91.

    [15]Vlasov V P.Experience with pile foundation construction in Magadan[J].Osnovaniya,F(xiàn)undamenty i Mekhanika Gruntov,1988,4:2-4.

    [16]Vlasov V P.Consideration of loading friction in static pile testing in thawing soils.In:Transactions of the Magadan Promstroyniiproekt[J].Magadan Promstroyniiproekt,Magadan,1991:29-36.

    [17]Vlasov V P.Introduction of composite slurried piles in Magadan.In:Transactions of the Magadan Promstroyniiproekt.Magadan Promstroyniiproekt[J].Magadan,1991:37-45.

    [18]Vlasov V P.Engineering-geocryological studies in support of pile foundation engineering practice in areas of sporadic permafrost[J].Kolyma,1994,7-8:16-21.

    [19]Vlasov V P.Rational method for pre-construction pile tests in thawing soils.In:Proceedings of Interregional Scientific Practical Conference“Russian Building Industry[C]//Problems,Prospects and Human Resources”,East Siberian State Technological University,Ulan-Ude,1999,2:3-12.

    [20]Konash V E.Pile Foundations in Sporadic Permafrost Areas(An Example of Magadan)[M].Stroyizdat,Leningrad,1977.

    [21]Vlasov V P,Zeeva A N.A new composite pile placement method for permafrost condition in Magadan[C]//In:Proceedings of the 7th InternationalSymposium on Cold Region Development (ISCORD– 2004).Hokkaido Organizing Committee,Japan, 2004.

    [22]Ministry of Regional Development of the Russian Federation[M].SP 22.13330.2011,Soil Bases of Buildings and Structures,Moscow:Updated Edition of SNIP 2.02.01-83*.2011.

    [23] Russian Federation Committee on Construction.SP 11-105-97,Geotechnical Site Investigations[M].Moscow:Guidelines for Permafrost Areas,2003.

    [24]Rastegaev I K.Excavation of Frozen Ground in Northern Building[M].Novosibirsk:Nauka,1992.

    [25]Vlasov V P.Management of stability of pile foundation in service.In:Proceedings of the Sixth International Symposium on Permafrost Engineering[J].Journal of Glaciology and Geocryology,2004a,189-193.

    [26]Vlasov V P.Problems of bed and foundation stability in the Magadan Oblast[J].Soil Mechanics and Foundation Engineering,2004b,41(2):65-70.

    猜你喜歡
    俄羅斯科學(xué)院尼科夫州立大學(xué)
    下雪天的聲音
    程耿東:俄羅斯科學(xué)院外籍院士里的中國科學(xué)家
    腳手架樓(大家拍世界)
    美國費(fèi)里斯州立大學(xué)(FSU)大學(xué)生學(xué)習(xí)動(dòng)力來源的思考與啟示
    美國學(xué)前教育教師職前專業(yè)能力培養(yǎng)的特征及啟示——以美國塞勒姆州立大學(xué)早期兒童教育專業(yè)為例
    永凍層排水處理的案例研究
    凍融循環(huán)引起的飽和孔隙組合轉(zhuǎn)換模擬研究
    信息技術(shù)在美國大學(xué)物理課程中的應(yīng)用——以美國俄亥俄州立大學(xué)為例
    物理與工程(2014年4期)2014-02-27 11:23:09
    以人為本 服務(wù)為體——俄亥俄州立大學(xué)
    對(duì)一個(gè)人的認(rèn)識(shí)
    知識(shí)窗(2013年6期)2013-02-11 10:52:04
    女人久久www免费人成看片| 久久久精品免费免费高清| 亚洲五月色婷婷综合| 狠狠精品人妻久久久久久综合| 日韩精品免费视频一区二区三区 | 另类亚洲欧美激情| 我的老师免费观看完整版| 最新中文字幕久久久久| 日韩成人av中文字幕在线观看| 简卡轻食公司| 一区二区日韩欧美中文字幕 | 交换朋友夫妻互换小说| 成人国产av品久久久| 日韩在线高清观看一区二区三区| 少妇人妻精品综合一区二区| 中文欧美无线码| 男人操女人黄网站| 亚洲天堂av无毛| 国产成人免费观看mmmm| xxx大片免费视频| 亚洲内射少妇av| 国产黄片视频在线免费观看| 亚洲色图综合在线观看| 免费观看的影片在线观看| 建设人人有责人人尽责人人享有的| 久久人人爽人人片av| 国产黄色免费在线视频| 蜜臀久久99精品久久宅男| 丝袜喷水一区| 五月伊人婷婷丁香| 成人黄色视频免费在线看| 一级片'在线观看视频| 天堂8中文在线网| 亚洲欧美中文字幕日韩二区| 亚洲av不卡在线观看| 国产在线一区二区三区精| 成人综合一区亚洲| 日韩一区二区三区影片| 日本欧美国产在线视频| 永久网站在线| 久久久久久久久久久免费av| 国产在线免费精品| 亚洲成人av在线免费| 大话2 男鬼变身卡| 成年美女黄网站色视频大全免费 | 视频中文字幕在线观看| 久久韩国三级中文字幕| 国产精品久久久久久精品电影小说| 丰满饥渴人妻一区二区三| 亚洲av在线观看美女高潮| 国产淫语在线视频| 欧美+日韩+精品| 国产av码专区亚洲av| 亚洲精品视频女| 极品人妻少妇av视频| 大片电影免费在线观看免费| 久久久久精品性色| 亚洲精华国产精华液的使用体验| 2022亚洲国产成人精品| 久久久久久久精品精品| av在线app专区| 熟女电影av网| 亚洲综合色网址| 在现免费观看毛片| 热99久久久久精品小说推荐| 亚洲精品,欧美精品| 国产精品一区二区在线不卡| 香蕉精品网在线| 伊人久久精品亚洲午夜| 精品久久久久久电影网| 午夜老司机福利剧场| av黄色大香蕉| 久久99一区二区三区| 自拍欧美九色日韩亚洲蝌蚪91| 免费观看的影片在线观看| 欧美精品高潮呻吟av久久| 国产男女超爽视频在线观看| 777米奇影视久久| 久久久久精品性色| 亚洲在久久综合| 日本色播在线视频| 成人无遮挡网站| 伊人久久国产一区二区| 最近中文字幕2019免费版| 99热网站在线观看| 一本大道久久a久久精品| 少妇精品久久久久久久| 久久人妻熟女aⅴ| av又黄又爽大尺度在线免费看| 国内精品宾馆在线| 中国美白少妇内射xxxbb| 亚洲av中文av极速乱| 国产精品女同一区二区软件| 亚洲不卡免费看| 亚洲人成77777在线视频| 色婷婷av一区二区三区视频| 亚洲国产最新在线播放| 亚洲国产毛片av蜜桃av| 亚洲精品视频女| 中文字幕最新亚洲高清| 亚洲图色成人| 插逼视频在线观看| 777米奇影视久久| 午夜激情av网站| 少妇被粗大的猛进出69影院 | 亚洲国产av新网站| 国产老妇伦熟女老妇高清| 免费人成在线观看视频色| 天天躁夜夜躁狠狠久久av| 一边亲一边摸免费视频| 亚洲精品第二区| 人妻一区二区av| 免费观看a级毛片全部| 免费观看无遮挡的男女| 成人综合一区亚洲| 在线观看免费日韩欧美大片 | 一级毛片黄色毛片免费观看视频| 一级毛片电影观看| 亚洲av不卡在线观看| 99国产综合亚洲精品| 天天操日日干夜夜撸| 男人操女人黄网站| 中文字幕精品免费在线观看视频 | 日韩av在线免费看完整版不卡| 中文字幕最新亚洲高清| 中文字幕亚洲精品专区| 亚洲欧美精品自产自拍| 欧美另类一区| 九九爱精品视频在线观看| 精品国产一区二区三区久久久樱花| 十分钟在线观看高清视频www| 2021少妇久久久久久久久久久| 免费人成在线观看视频色| 免费看光身美女| 伊人亚洲综合成人网| 高清av免费在线| 久久人人爽人人片av| 国产成人freesex在线| 亚洲国产av新网站| 国产日韩欧美视频二区| 岛国毛片在线播放| 国产国拍精品亚洲av在线观看| av不卡在线播放| 热99久久久久精品小说推荐| 日本vs欧美在线观看视频| 国产精品熟女久久久久浪| 免费人成在线观看视频色| av在线观看视频网站免费| 免费观看性生交大片5| 女的被弄到高潮叫床怎么办| 亚洲欧美成人精品一区二区| 五月开心婷婷网| 欧美最新免费一区二区三区| 中文天堂在线官网| 日本色播在线视频| 97在线视频观看| 久久久久网色| 国产亚洲精品第一综合不卡 | 欧美xxⅹ黑人| 免费播放大片免费观看视频在线观看| 91久久精品国产一区二区三区| 高清欧美精品videossex| 纯流量卡能插随身wifi吗| 精品少妇黑人巨大在线播放| av免费观看日本| 夜夜骑夜夜射夜夜干| 久久久精品免费免费高清| 欧美日韩视频精品一区| 色婷婷久久久亚洲欧美| 亚洲中文av在线| 色吧在线观看| 99热全是精品| 人妻一区二区av| 久久精品国产自在天天线| 午夜免费鲁丝| 妹子高潮喷水视频| 男女免费视频国产| 久久人人爽av亚洲精品天堂| 天天影视国产精品| 精品久久久久久久久亚洲| 插阴视频在线观看视频| 蜜桃在线观看..| 久久精品久久久久久噜噜老黄| 女性被躁到高潮视频| 欧美+日韩+精品| 中国三级夫妇交换| 在线免费观看不下载黄p国产| 高清视频免费观看一区二区| 99久久中文字幕三级久久日本| 黄色视频在线播放观看不卡| 大香蕉久久网| 精品一区在线观看国产| 久久久久久久大尺度免费视频| 制服丝袜香蕉在线| 在线观看免费高清a一片| 欧美一级a爱片免费观看看| 黄片无遮挡物在线观看| 老司机影院成人| 99re6热这里在线精品视频| 亚洲国产精品专区欧美| a级毛色黄片| 亚洲人成77777在线视频| 欧美另类一区| 十八禁高潮呻吟视频| 男的添女的下面高潮视频| 日日爽夜夜爽网站| 免费看不卡的av| 少妇人妻 视频| a级毛片黄视频| 国产精品一区二区三区四区免费观看| 精品久久久久久久久av| 高清在线视频一区二区三区| 欧美日韩在线观看h| 国语对白做爰xxxⅹ性视频网站| 在线观看免费视频网站a站| 成人黄色视频免费在线看| 免费日韩欧美在线观看| 国产精品.久久久| 国国产精品蜜臀av免费| 国产亚洲精品第一综合不卡 | 搡老乐熟女国产| 蜜桃久久精品国产亚洲av| 日韩人妻高清精品专区| 亚洲欧美清纯卡通| 国产在线免费精品| 青春草亚洲视频在线观看| 乱人伦中国视频| 日韩人妻高清精品专区| av卡一久久| 精品人妻在线不人妻| 国产精品秋霞免费鲁丝片| 秋霞在线观看毛片| 在线看a的网站| 欧美日韩视频高清一区二区三区二| 一级爰片在线观看| 精品久久久久久电影网| 18禁动态无遮挡网站| 久久热精品热| 一本一本综合久久| 国产精品一区二区在线观看99| 久久久国产一区二区| 国产精品久久久久久精品古装| 亚洲av日韩在线播放| av在线播放精品| 久久久精品免费免费高清| 少妇人妻 视频| 麻豆乱淫一区二区| 亚洲精品aⅴ在线观看| 热re99久久国产66热| 欧美老熟妇乱子伦牲交| 国产亚洲午夜精品一区二区久久| 日本91视频免费播放| 街头女战士在线观看网站| 国产亚洲精品久久久com| 黄色配什么色好看| 天堂8中文在线网| 日本欧美视频一区| 成人国产av品久久久| 大香蕉久久成人网| 国产黄色视频一区二区在线观看| 欧美三级亚洲精品| 亚洲国产最新在线播放| 久久久久国产网址| 人人妻人人添人人爽欧美一区卜| 97超碰精品成人国产| 成人国产av品久久久| 国产一区二区在线观看av| 韩国av在线不卡| 插逼视频在线观看| 18禁在线无遮挡免费观看视频| 免费看不卡的av| 欧美另类一区| 国产视频内射| 男女啪啪激烈高潮av片| 久久久久精品性色| av.在线天堂| 久久韩国三级中文字幕| 久久久国产一区二区| 国产一级毛片在线| 亚洲精品日韩在线中文字幕| 日本欧美国产在线视频| 黑丝袜美女国产一区| 国产精品女同一区二区软件| 亚洲精品一二三| 亚州av有码| 亚洲美女搞黄在线观看| 看非洲黑人一级黄片| 建设人人有责人人尽责人人享有的| 99国产综合亚洲精品| 啦啦啦中文免费视频观看日本| 丁香六月天网| 搡女人真爽免费视频火全软件| 国产日韩欧美视频二区| 日韩av在线免费看完整版不卡| 国产亚洲精品久久久com| 国产白丝娇喘喷水9色精品| 天堂8中文在线网| h视频一区二区三区| 亚洲美女黄色视频免费看| 午夜91福利影院| 久热久热在线精品观看| 亚洲丝袜综合中文字幕| 亚洲精品久久久久久婷婷小说| 观看美女的网站| 亚洲美女搞黄在线观看| 亚洲欧美精品自产自拍| 中国国产av一级| 中文字幕亚洲精品专区| 日本免费在线观看一区| 男女高潮啪啪啪动态图| 晚上一个人看的免费电影| 国产白丝娇喘喷水9色精品| 日韩大片免费观看网站| 亚洲国产精品成人久久小说| 久久毛片免费看一区二区三区| 亚洲美女黄色视频免费看| 亚洲,一卡二卡三卡| kizo精华| 亚洲av电影在线观看一区二区三区| 欧美一级a爱片免费观看看| 亚洲av男天堂| 久久久国产欧美日韩av| 18禁裸乳无遮挡动漫免费视频| 女的被弄到高潮叫床怎么办| 日韩中字成人| 欧美成人精品欧美一级黄| 亚洲精品乱码久久久久久按摩| 美女cb高潮喷水在线观看| 大陆偷拍与自拍| 卡戴珊不雅视频在线播放| 中国美白少妇内射xxxbb| 亚洲内射少妇av| 欧美一级a爱片免费观看看| 菩萨蛮人人尽说江南好唐韦庄| 欧美成人精品欧美一级黄| 国产午夜精品久久久久久一区二区三区| 在线免费观看不下载黄p国产| 男的添女的下面高潮视频| 老司机影院成人| 夜夜看夜夜爽夜夜摸| 99久久综合免费| 成年人免费黄色播放视频| 青春草亚洲视频在线观看| 午夜免费男女啪啪视频观看| 激情五月婷婷亚洲| 午夜视频国产福利| 午夜久久久在线观看| 日韩电影二区| 国产精品免费大片| 亚洲精品久久成人aⅴ小说 | 免费黄网站久久成人精品| 精品久久久久久久久亚洲| 成人二区视频| 亚洲天堂av无毛| 成人二区视频| 看非洲黑人一级黄片| 香蕉精品网在线| av免费观看日本| 美女视频免费永久观看网站| 日本色播在线视频| 国产爽快片一区二区三区| 亚洲熟女精品中文字幕| 久久久久久久国产电影| 精品一区二区免费观看| av黄色大香蕉| 五月玫瑰六月丁香| 久久国产精品男人的天堂亚洲 | a级毛片黄视频| 成人毛片60女人毛片免费| 免费观看的影片在线观看| 高清午夜精品一区二区三区| 国产精品嫩草影院av在线观看| 欧美xxⅹ黑人| 国产精品99久久99久久久不卡 | 晚上一个人看的免费电影| 欧美人与性动交α欧美精品济南到 | 美女大奶头黄色视频| 国产老妇伦熟女老妇高清| 国产免费一级a男人的天堂| 久久久久网色| 亚洲av中文av极速乱| 亚洲欧美日韩另类电影网站| 成人手机av| 亚洲av综合色区一区| 亚洲精品日韩av片在线观看| 亚洲av不卡在线观看| 欧美bdsm另类| 亚洲图色成人| 一级毛片 在线播放| 国产色爽女视频免费观看| 成人国产av品久久久| 久久久久视频综合| 夜夜爽夜夜爽视频| 一级a做视频免费观看| 国产av一区二区精品久久| 国产片内射在线| 热99久久久久精品小说推荐| 天堂8中文在线网| 久久鲁丝午夜福利片| 91精品国产国语对白视频| 精品酒店卫生间| 99久久综合免费| 九九在线视频观看精品| 99久国产av精品国产电影| 两个人的视频大全免费| 韩国av在线不卡| 中文欧美无线码| 亚洲国产欧美日韩在线播放| 国产一区二区在线观看av| 日本91视频免费播放| 亚洲av福利一区| 99久久精品一区二区三区| 成人影院久久| 九草在线视频观看| 插阴视频在线观看视频| 亚洲av欧美aⅴ国产| 国产精品99久久99久久久不卡 | 极品少妇高潮喷水抽搐| 国产亚洲欧美精品永久| 少妇的逼水好多| 亚洲情色 制服丝袜| 亚洲精品美女久久av网站| 午夜福利视频精品| 亚洲第一区二区三区不卡| 免费日韩欧美在线观看| 2022亚洲国产成人精品| 女的被弄到高潮叫床怎么办| 久久久久久伊人网av| 免费少妇av软件| 丰满乱子伦码专区| 麻豆成人av视频| 日日摸夜夜添夜夜爱| 色网站视频免费| 在线 av 中文字幕| 亚洲av中文av极速乱| 蜜桃国产av成人99| 国产成人91sexporn| 欧美一级a爱片免费观看看| 欧美国产精品一级二级三级| 欧美人与善性xxx| 黄色毛片三级朝国网站| 中文字幕人妻丝袜制服| 97精品久久久久久久久久精品| 欧美日韩成人在线一区二区| 九九爱精品视频在线观看| 亚洲精品乱久久久久久| 日韩欧美一区视频在线观看| 黄片播放在线免费| 免费av不卡在线播放| 中文字幕精品免费在线观看视频 | 国产亚洲最大av| 欧美+日韩+精品| 丝袜美足系列| 永久免费av网站大全| 麻豆乱淫一区二区| 免费播放大片免费观看视频在线观看| 高清午夜精品一区二区三区| 国产精品一区www在线观看| 国产黄频视频在线观看| 国产在线一区二区三区精| 中文精品一卡2卡3卡4更新| 97超碰精品成人国产| 高清不卡的av网站| 免费高清在线观看日韩| 黄色视频在线播放观看不卡| 国产熟女午夜一区二区三区 | 亚洲精品国产色婷婷电影| 久久久久久久久久成人| 亚洲高清免费不卡视频| 亚洲无线观看免费| 少妇人妻久久综合中文| 国产一级毛片在线| 男女啪啪激烈高潮av片| 亚洲av免费高清在线观看| 精品国产露脸久久av麻豆| 美女内射精品一级片tv| 国产成人精品福利久久| 国产黄片视频在线免费观看| 久久精品国产亚洲av涩爱| 丰满迷人的少妇在线观看| 18+在线观看网站| 九色成人免费人妻av| 免费黄频网站在线观看国产| 美女国产视频在线观看| 久久久久久久久久久丰满| 少妇被粗大猛烈的视频| 亚洲av综合色区一区| 国产黄频视频在线观看| 亚洲五月色婷婷综合| 男的添女的下面高潮视频| 国产老妇伦熟女老妇高清| 国产免费一级a男人的天堂| 亚洲四区av| 免费观看在线日韩| 成人无遮挡网站| 美女脱内裤让男人舔精品视频| 人妻少妇偷人精品九色| 最黄视频免费看| 国产成人精品一,二区| 亚洲国产精品一区三区| 人体艺术视频欧美日本| 97精品久久久久久久久久精品| 看非洲黑人一级黄片| 日本欧美视频一区| 日韩成人av中文字幕在线观看| 99视频精品全部免费 在线| 亚洲欧美中文字幕日韩二区| 国产 一区精品| 国产高清三级在线| 人人澡人人妻人| 老司机影院毛片| 日韩 亚洲 欧美在线| 日本午夜av视频| 日本欧美视频一区| 日本av手机在线免费观看| 最近中文字幕2019免费版| 亚洲五月色婷婷综合| 精品国产一区二区久久| 亚洲精品久久成人aⅴ小说 | 午夜福利,免费看| 午夜91福利影院| 午夜日本视频在线| 伊人久久国产一区二区| av天堂久久9| 亚洲成人av在线免费| 亚洲欧美日韩另类电影网站| 国产一区二区在线观看av| 赤兔流量卡办理| 嫩草影院入口| 亚洲av国产av综合av卡| 97在线人人人人妻| 中国国产av一级| 精品国产露脸久久av麻豆| 青春草国产在线视频| 99久久中文字幕三级久久日本| a级片在线免费高清观看视频| 丝袜美足系列| freevideosex欧美| videos熟女内射| 18禁在线播放成人免费| 免费观看在线日韩| 亚洲精品456在线播放app| 亚洲一级一片aⅴ在线观看| 国产毛片在线视频| 亚洲欧美清纯卡通| 如日韩欧美国产精品一区二区三区 | 夫妻性生交免费视频一级片| 99热全是精品| 十分钟在线观看高清视频www| 色5月婷婷丁香| 一区二区三区乱码不卡18| 亚洲av国产av综合av卡| 91成人精品电影| 久久久久人妻精品一区果冻| 夜夜看夜夜爽夜夜摸| 成人二区视频| 2018国产大陆天天弄谢| 性高湖久久久久久久久免费观看| 国产精品久久久久久精品电影小说| 最新中文字幕久久久久| 另类亚洲欧美激情| 插阴视频在线观看视频| 欧美日韩视频精品一区| 免费人成在线观看视频色| 久久韩国三级中文字幕| 这个男人来自地球电影免费观看 | 国产亚洲最大av| 美女脱内裤让男人舔精品视频| 在线观看www视频免费| 五月玫瑰六月丁香| 大香蕉久久网| 亚洲五月色婷婷综合| 桃花免费在线播放| 91精品三级在线观看| 亚洲国产精品成人久久小说| 草草在线视频免费看| 久久亚洲国产成人精品v| 大香蕉97超碰在线| 亚洲天堂av无毛| 秋霞伦理黄片| 丰满少妇做爰视频| 日本与韩国留学比较| 亚洲国产毛片av蜜桃av| 亚洲欧美日韩卡通动漫| 亚洲精品日韩在线中文字幕| av在线app专区| 天美传媒精品一区二区| 国产免费一级a男人的天堂| 自线自在国产av| av一本久久久久| 欧美三级亚洲精品| 中文字幕制服av| 日韩强制内射视频| 午夜福利在线观看免费完整高清在| 美女视频免费永久观看网站| 男女边吃奶边做爰视频| 人体艺术视频欧美日本| 飞空精品影院首页| 丰满乱子伦码专区| 欧美三级亚洲精品| 久久久久久人妻| 一级二级三级毛片免费看| 成人毛片60女人毛片免费| 99久久人妻综合| 青春草亚洲视频在线观看| 人妻夜夜爽99麻豆av| 内地一区二区视频在线| 久久人人爽av亚洲精品天堂| 男的添女的下面高潮视频| 91成人精品电影| 亚洲,一卡二卡三卡| 国产极品天堂在线| 成人综合一区亚洲| 男男h啪啪无遮挡| 亚洲精品,欧美精品|