    馬加丹凍土特征和基礎(chǔ)類型選擇

    2014-03-19 03:43:44VladimirVlasov
    關(guān)鍵詞:俄羅斯科學(xué)院尼科夫州立大學(xué)

    Vladimir P.Vlasov

    (1.俄羅斯科學(xué)院西伯利亞分院,麥爾尼科夫凍土研究所 東北凍土站,馬加丹685000,俄羅斯;2.俄羅斯東北州立大學(xué),馬加丹685000,俄羅斯)

    0 General description

    The city of Magadan is situated in the southern permafrost zone of Russia's Far Northeast[1].It lies on the coast of the Gulf of Taui in the Sea of Okhotsk where the StaritskyPeninsula joinsthe mainland (Fig.1).Magadan is bounded by Nagaev Bay on the west and by Gaertner Bay on the east.The mountain ranges to the north and south have elevations of 200 m to 700 m above sea level.The city is crossed by Magadanka Creek with a wide,swampy valley.Most part of the city is located south-west of Magadanka Creek,on the Magadanka-Nagaev watershed.Surface and subsurface waters of the watershed drain into Magadanka Creek to the north-east and into Nagaev Bay to the west.The watershed has a maximum elevation of 120 m above sea level.Its northeastern slope is gentle(3° to 5°),while the western slope is steep and abrupt.

    Fig.1 Location of Magadan

    Magadan is located in an area of high earthquake activity[2].Earthquakes of magnitude 8~9 are possible in the area[3].

    The climate is monsoonal.The annual mean air temperature is-3.6℃,with daily means above 0℃from mid-May to mid-October.Mean annual precipitation is 550 mm,of which about half falls as rain.Winds are generally from the west and southwest in summer and from the northeast and east in winter.The mean annual wind speed is 5.6 m/s.The number of days with snow storms is about 50.Snow cover is up to 0.3 m deep and characterized by with redistribution[4].

    1 Geology and permafrost

    The geological structure of the area is determined by its location within the Magadan Intrusion[5].The upper 10~15 m of the geological section consist of Quaternary deposits underlain by rocks of Neogene age more than 100 m in thickness.

    The Neogene rocks include the marine pebbles with sand and the lagoon and continental materials represented by sandy clays,gravels and pebbles,and granodiorite weathered and solid rocks.The former comprise the southeastern slope of the Magadanka-Nagaev watershed,while the latter make up the remaining part of the city area.The Quaternary sediments that blanket the Neogene rocks are in turn subdivided into alluvial,colluvial,and residual.

    The alluvial deposits occur in the valley of Magadanka Creek and comprise its floodplain and terraces.Lithologically,they consist of sand,gravel and cobble in widely varying proportions.Sands have varying compositions from silty to gravelly.The alluvium 10 m or more in thickness often contains beds and layers of gravelly sandy and clayey silts.

    The colluvial deposits occur everywhere on the slopes.They consist largely of silty sands,sandy silts,and clayey silts with varying amounts of boulders,cobbles and pebbles of granodiorite.At depth,the colluvial deposits gradually merge with the Neogene rocks of similar composition.The thickness of this layer is a few meters,but increases up to 10 m along the slope bases.

    The residual soils derived from the weathering of the underlying rocks lie at greater depths.These soils together with the bedrock occur near the surface only on the steep slopes.The thickness of the residuum is up to 10-15 m.

    The geocryological conditions in the Magadan area are highly variable and complicated.Permafrost occurs as isolated lenses and patches in thawed ground.The permafrost bodies vary in size from 100 to 10 000 m2.Their thickness varies from 2 to 30 m,depending on size.The depth to the permafrost table generally is 3 to 5 m,but may be deeper in places.Two-layer permafrost is occasionally encountered,in which the layers of frozen ground are separated by thawed ground.

    The local permafrost is characteristically warm,with temperatures at the depth of zero annual amplitude close to 0℃,normally about-0.1 to-0.2℃.Exceptions to this are the permafrost bodies in wet low-lying and high areas of the city,where ground temperatures are-0.5 to-1℃.Presently,however,the size and thickness of permafrost bodies can only be judged for the time of a geotechnical site investigation,because any disturbance of the heat exchange at the ground surface by construction activities causes immediate changes to the thermal state of the warm permafrost.Observations indicate that the permafrost at Magadan is gradually degrading,with global climatic change contributing to the trend.

    The frozen gravels and sands generally have a massive cryostructure,while silts and silty sands have a layered or reticulate cryostructure.Ice contents are highest in the upper permafrost layers.Total moisture contents down to 8~10 m depths,in some cases to lower depths,are 0.08~0.12 for the frozen gravels,0.18~0.22 for the sands and sandy silts,and 0.3~0.35 for the clayey silts.The layers with moisture contents of 0.4~0.6 are encountered.At these moisture (ice)contents,the frozen soils are often thaw-unstable and may produce settlements of 3 to 18 cm/m.

    The thawed soils surrounding the permafrost bodies are not inferior in engineering properties to normal unfrozen soils,and may even be superior in some parameters[6].This is because the thawed soils were in a perennially frozen state in the geological past,but gradually warmed due to climatic and anthropogenic impacts.The post-cryogenic structure characteristic of thawed soils has been completely destructed.The action of the soil weight accompanied by aggregate breakup of the mineral framework in the saturated medium caused repacking of the solid particles,expulsion of the excess pore water,and filling of the pores with fines.These processes resulted in increased soil density and improved physical properties.The former frozen state of the soils is evidenced by geotechnical investigation data(Table 1).

    Table 1 Averaged physical characteristics of frozen and thawed soils in Magadan(depth interval from 3 to 30 m)

    The frost-related processes active in the Magadan area include only frost heaving in oversaturated finegrained soils and silty sands dominant in the upper part of the geological section,especially in the active layer,as well as icing formation at the foot of steep hillslopes and in the Magadanka Creek valley.

    Groundwater is encountered in most of the construction sites.Its occurrence is due to the rough terrain,deep seasonal thaw(down to 3.5 m),and abundant precipitation.Porous and fractured granodiorite aquifers are present.Most common are the so-called seasonal perched water bodies in thawed sands and gravels.Due to the high variability in soil facies,they occur as isolated lenses with limited water flow.Although yields are low,serious difficulties for earthwork can be created during snowmelt in the spring and incessant rains in the summer and autumn.

    Yields of the Neogene sediments are generally low.Supra-,intra-and subpermafrost waters are encountered occasionally in sands and gravels in the depth interval from 1 to 12 m.They are recharged by infiltrating precipitation and by water flowing from fractured aquifers at the foot of steep hillslopes.As a result,the Neogene aquifers at these locations may have heads of up to 5 m.The layer of alluvial gravel,6 to 7 m in thickness,in the Magadanka valley(within the floodplain and partially in the low terrace)has highest yields.Gravel aquifers here are 200 to 300 m or more in width.In summer,the steady water level rises to the ground surface.In winter,the head may increase to 1~2 m,resulting in the formation of icings throughout the winter.Protective dikes are constructed along the river bank to eliminate the icing problems on engineering structures.

    2 Selection of pile placement method

    The co-existence of frozen and thawed ground (Fig.2)within a construction site dictates the selection of foundation designs.Geocryological considerations include:1)warm permafrost;2)variable depths to the top of permafrost,often far below the active layer,and occasional two-layered permafrost with thick thawed interlayers;3)strong spatial and temporal variability of the permafrost bodies in response to shortterm climatic variations and construction activities;4) occurrence of ice-rich and hence thaw unstable soils; 5)seasonal soil freezing to depths of 1 to 3.5 m;during very cold winters with low snowfall soil freezing may be as deep as 4~5 m,resulting in frozen layers which remain unthawed for one or two summers or in newly formed permafrost;6)great depths(8~20 m or more)to the firm strata with sufficient strength and stability to safely support the buildings and structures.

    Fig.2 An example of the geotechnical cross-section for a construction site

    For such geocryological conditions,the Russian building code[7]stipulates for the use of Principle II,or the active method of constructing in permafrost.This method is best suited for sites underlain by bedrock or consolidated soils,including thawed and frozen soils whose deformation and strength properties are not changed on thawing.However,these materials are often overlain by unconsolidated sediments.Principle II therefore requires that measures be undertaken to minimize deformation of the foundation materials(e.g.,pre-thawing of frozen ground,replacement of frozen ground with thawed coarse materials,use of piles extending below a thaw-unstable stratum)and the superstructures be designed to accommodate differential settlements.The latter involves the use of structural elements that prevent additional stresses or the structure of a building must be of sufficiently rigid construction to resist these stresses.In general,these structural measures in combination with techniques to mitigate differential settlements are incorporated into the seismic de-sign requirements for the seismically active southern permafrost zone.

    If follows from above that the viability,stability and serviceability of buildings and structures in Magadan must be provided by selection of a proper design for the foundation and superstructure,engineering preparation of the site,and control of the interaction of the foundation with the ground.A set of all or part of the listed measures is termed techniques for ensuring building stability[8].

    The goal of the designer is to select the foundation type and design best suited,from technical and economic considerations and past experience,for the local soil and permafrost conditions.

    3 Pile foundations in Magadan

    Piles are the main foundation type for Magadan.They create the opportunity to reduce subsoil deformations to safe values for structural competences due to slotting of thaw unstable layers with the deepening of their bottom ends in bearing layers of thawed soils.For this purpose the very specific technologies:composite drilled-and-slurried piles(Fig.3)and drilled-anddriven piles(Fig.4)are used here.

    Fig.3 Structure diagram of composite drilled and slurried piles:1-drilling;2-road metal driving in the slurry on the drill hole;3-rubbly pad driving by the way of tamping;4-concreting of the tamped pile part;5-reinforced concrete member driving in the hole;6-vibratory pole driving into the pile monolithic concrete;7-performed composite drilled and slurried pile

    Fig.4 Structure diagram of drilled-and-driven piles1-pile hole drilling;2-hole grouting for slurry;3-drill holes;4-pile driving from the hole bottom;5-pile driven at the project reference

    Permafrost reasoning of pile placement technologies relating to the local construction conditions is given in Konash and Vlasov.The results of the accomplished studies are reflected in the regional building regulations[9-10].In view of new data and requirements,these regulations were updated and published as Guidelines for Design and Construction of Pile Foundations in Thawing and Thawed Ground in the Magadan Oblast[11].This document amends and develops the mandatory provisions of the Russian construction codes forfoundation engineering in the permafrostregion[7,12].For practical project development and foundations the regional resistivity amount of thawed soils under the pile tips(Tables 2 and 3)and on the side surface(Table 4),specific values of the negative friction force(Fig.5)as well as the correction factors dependent on the accepted practice of pile placement (composite drilled-and-slurried pile or drilled-anddriven pile)are described.All data necessary for design analyses have been obtained from field tests[6,13-19].Their certainty is controlled by many experimental and check tests of different constructions and pile standard size in the most various permafrostgeological conditions as well as long-term project and construction practice of pile foundation on the thawing and thawed soils of the Magadan region[6,15,20-21].

    For pile foundation design in the Magadan area,in the capacity of calculating bearing course thawed soils for composite drilled-and-slurried piles and drilled-and-driven piles underlying under the permafrost thickness and in the absence thereof under the layer of seasonal frost-thawing which within the bounds of the compressible thickness depths give summary compression not exceeding the tolerated one by the standards for constructing class of buildings and constructions[22]are used.At determining the bearing course of pile foundation soils it is taking into account that the construction region is in the seismically active zone.In this respect the pile embedment depth from the ground surface or from the foundation pit bottom must be no less than 4 m and where there are water saturated silt sands in the foundation-no less than 8 m[11].

    The selection of pile type and pile arrangement (e.g.pile clusters,fields,rows)is made on the basis of concrete conditions of construction site characterized by the materials of engineering permafrost investigations which are performed according to SP 47.13330.2012(Federal Agency for Construction,Housing and Utilities(Gosstroy),2012)and SP 11-105-97[23]and construction and technological peculiarities of future building or construction taking into account the dimensions and intention of their underground facilities as well as the design loads on the foundation.Where thick permafrost is present with its base located at a depth of 10 m or more from the foundation pit bottom,piles are penetrated placed into the thawed soil barred by permafrost,by composite drilledand-slurry method(see Fig.3).At smaller depths to the permafrost base,drilled-and-driven piles(see Fig.4)are used.If permafrost is absent,spread footings,strip footings or mat foundations are used.

    Table 2 Design resistance of thawed soils R under composite drilled-and-slurried piles tips

    Table 3 Design resistance of thawed soils R under drilled-and-driven piles tips

    Table 4 Design resistance of thawed soils fialong the pile skin

    Drilling for pile placement is made by drilling machines with cable tool percussion effect.This drilling method is used in the soils of any type and structure (with heavy percentage of coarse material,boulders etc)as well as thermal state-without restriction[24].The usage of other hole boring method for the purposes of pile foundation on the territory of Magadan turned out to be difficult because of dreadful garishness of frozen soiled and hydrogeological conditions of construction sites[5].

    Table 5 Design values of negative friction fn,iof thawing soils

    Cable tool percussion drilling is that the rock drill dropping at a height(about 1 m)damages mine rock by its chisel nose.The water periodically pouring in the deepening hole mixes with finely crushed soil and makes it into liquid-like saturated soil-drilling slurry taking out of the hole by the sludge after every drilling run.The disadvantage of the method is an incomplete cleanup.As a rule,on the hole bottom the layer of slurry at a height from 10 to 30 cm or frequently more leaves unselected.Besides the soil at some though small depths lower than the hole bottom can be in a few loosened state.

    Usually the drilling consists of the borehole wall lining by casing metal pipes.Depending on the complexity of frozen ground and hydrogeological conditions of the construction site the well casing can be effected in two ways.In the former case the hole is drilled at once at all the depths settled by the project and only then it is cased by metal pipe of corresponding diameter.This method is used when soil hole walls have sufficient temporal stability and can retain their entirety for more period of time after the drilling termination.The second way is used in the case of unstable hole walls which start already to ruin while drilling.It consists of the well casing by separate passover offsets driving in them one after one in proportion to driving in unstable soil.Usually the passover offsets are joined by electro-welding.

    Pipe swaging(entirely or partly)is made by rock drill and its removing by instrumental rope winch of drilling machine[20,24].

    Composite drilled and-slurried piles are composite constructions placed into the deep holes:on the bottom they consist of the tamped concrete pole resting on the reinforced road metal of the drill hole with slurry vestiges and an upper reinforced drop concrete member embedded in the tamped part of the pile monolithic pole to a depth equal to at least three times in the diameter of the hole;though the biggest diameter of the pile crosssection must be 15 cm less than pile diameter where composite pile is made.

    The main criterion defining the quality of this technology of the foundation installation and consequently the formation of bearing sand core in the pile bottom is firm contact of a tamped concrete pole with the drill hole.The problem of quality of this contact can be aggravated by the presence of slurry vestiges and loosened rock between the elements named above.The matter is that the density of this slurry will be always lower than the natural density soil of undisturbed structure.The way out is that the coarse rock is tamped in the slurry vestiges and loosened pile bottom[6].

    As tamper it is used the rock drill of drilling machine.For this purpose the rock drill is provided with the interchangeable nose in the form of the round metal plate with thickness of 30~50 mm the diameter of which must be 1 cm less than the hole diameter.In the process of road metal tamper preliminary buried at the hole bottom by the layer exceeding the height of slurry vestiges no less than twofold,the consolidation deformations of road metal interpenetration into the slurry and than in the soil of the hole bottom and its walls are taken place.

    The consolidation of the road metal surface is performed up to the getting of the magnitude of the‘refusal'not exceeding 2 cm for the latest five tamper blows.Though the total amount of the refusal magnitudes must be no less than the height of slurry vestiges layer measured before the beginning of tamping.As the result densely packed structure of road metal-and-slurry pad is created.Along with the compacted sand core under the bottom of the drill hole it creates the pile structural bearing by the means of which the vertical impulse is transmitted from the service loading though the composite construction(tamped pit and reinforcedconcrete pole)on the underlying soils of building or construction foundations.

    At the end of road metal-and-slurry pad installation the tamped concrete pole which is the intermediate element of the composite pile is performed.It has very important practical value for future foundation because varying the height of the tamped part where the reinforced concrete pile element is embedded the necessary foundation depth settled by the project is provided.

    The supratamped pile element is made of the concrete mixture of the class not lower than B-20 with the water-cement ratio WC 0.45~0.55 and the cone slump 5~10 cm.As the anti-freezing agent-the accelerator of the concrete strength development sodium chloride in a rate of 2.5% ~3.5% of the cement weight in the concrete mixture is applied.

    In the holes the concrete mixture is put by the method of vertically movable pipes(VMP)with the diameter of 250~325 mm.The concrete mixture settled on the projected height is tightened by the vibrating pile driver while lowering the reinforced concrete pole into the tamped pile shaft.The last one is embedded in the concrete mixture of the tamped shaft.The abutment joint between these elements must be no less than three hole diameter.

    Composite drilled-and-slurried piles can be settled in the holes with extracted and non extracted casing pipe.The last one is used when there is no the possibility of qualitative pile production in the holes with the extracted protecting cover.Usually there are such conditions on the slump and thermostatic lots as well as on the sites with ice-rich embedded permafrost with the interlayer of well filtering thawed coarse and sandy soils where under the pressure of the permafrost ground waters heavily refillable due to the ice melt-out from the permafrost the composite pile shaft on the separate hole sites can be damaged during the concrete mixture con-solidation of its tamped part.

    The advantage of composite drilled-and-slurried piles driving in the soil is the possibility to produce them in any lengths and diameter and place accurately enough on the project references either at the bottom or at the top of the piles,minimizing the building vestiges.This type of piles turned out to be very popular during the building of the city urban districts,the construction area of which is situated on the development sites of intermediate discontinuous permafrost with a capacity of more than 10 m[17,21].At the presence in the structure base ice lenses of smaller dimensions the foundations have been already installed from drilled and-driven piles[6].

    Drilled-and-driven piles are solid reinforced concrete piles designed to take account of the pile-driving impact loads driven into the bottom of pilot holes in the bearing layer of thawed soils.Pilot holes must be drilled on 0.5~1 mm lower than the permafrost base and have the diameter larger than the diagonal of the cross-section of the pile in 2~5 cm.In Magadan on the building sites for driving it is used the standards reinforced concrete piles with the lengths of 5~12 m and the cross-section of 30 cm×30 cm.Their placement in the piles is performed by the autocrane of the appropriate bearing capacity and the driving into the soil-by the tubular diesel hammer with the weight of the striking part in 1.8,2.5 and 3.5 ton-force.

    Before the placement piles are cleaned of the slurry.The thickness of its vestiges shouldn't exceed 30 cm.The existence of frozen slurry on the hole bottom is not admitted.For the exception of the last one the holes are drilled with the borehole wall lining by casing pipes.However in the frozen soils where the hole walls can retain temporal stability it is not obligatory to effect their casing on condition that the drill hole for further driving into the thawed soil will be performed instantly after the finishing of drilling but no later than 4 hours after the hole clearing.It is to be noted that the casing pipes must be taken out of the holes before the beginning of pile driving as after that this procedure will be extremely difficult or even impossible.

    Piles settled in the holes are driven lower than their bottom in the thawed soil at depths settled by the project whereby the base load-bearing capacity will provide the perception of calculated load from the future construction including the additional load when the permafrost thaws and consolidates around the pile.The control pile refusal(magnitude of its diving in the soil for one hammer blow)allocated by the project organization serves as the criterion of driving termination[11].

    The measurement of the refusals is performed in the end of driving when the depths diving in the soil riches the project references or the magnitudes of the actual refusals come close to the calculating values.The driving is ceased if the average refusal value in three consecutive blow counts,10 hammer blows in each doesn't exceed the magnitude of control refusal pointed in the piling project.

    Piles embedded lower than the hole bottom less than one meter(if it is not required by the project) and given pile refusal during three consecutive blow counts are subjected to the inspection for the causation that complicates pile driving.In this case on the basis of studying the materials of engineering and geological research and the capacity of utilizable diesel pile hammer it is decided the question about the measuring of the piles lengths,drilling depth and the replacement of pile-driving equipment.The piles given the refusal that is much more than the pile refusal are subjected to the check-out(dynamic and static)after the‘rest’,time limits of which for different types of the thawed soils taking into account their thixotropic properties are contained in the guidelines[11].As the results of such check-out the character of the future pile usage in the foundation structure(with the redundancy of specific piles or without their redundancy)is settled.

    4 Conclusions

    Project development and foundation installation with the usage of composite drilled-and-slurried piles and drilled-and-driven piles on the territory of Magadan is performed in accordance with the requirements of the local building code[11],drafted in the development of mandatory provisions of national standards and rules and regulations concerning the regional building peculiarities under the conditions of isolated patches expansion of permafrost during their simultaneous existence with the thawed soils.

    The importance of the placement methods of these pile types on the territory of the city with very specific permafrost conditions is that due to them the construction sites with most diverse diving of lenses and permafrost regions underlying by the thawed soils which are reliable base for future foundations of buildings and constructions here.Complete slotting of thaw unstable layers and piles diving in the thawed soils provide required operational stability of construction objects.Besides high bearing pile capacity embedded on the thawed soil foundation it should be noted their adaptation for negative skin friction when the permafrost thaws and consolidates around the pile.Since the drill holes are larger in diameter than the cross-section of the piles,the annular space between the pile and the hole can be filled with any type of slurry.In Magadan the common practice is to use drilling slurry produced in large quantities during cable tool percussion drilling for placement of these pile types.It was established that in the result of this action it is managed to reduce the effect of the negative skin friction influence on the piles no less than 40%[6].

    Practically all the city buildings and constructions raised on the piles are used without any essential deformation characteristics.The exception is five civilian objects,the foundations of which were erroneously damaged in the thaw unstable permafrost.Three of them almost at once after placing in operation went on the bum,two others managed to avoid the deformations-the preventive consolidation of pile foundations were made[20].

    If it is necessary to reconstruct old construction objects,further operational suitability of their foundations can be always checked by static pile check-out being directly a part of the foundations of the existing buildings by the procedure represented in the work[25,28].In case of the deficiency revealed by the check-out of bearing ability of these piles,all foundation or its part can be strengthened by hydraulic jack cave-in of specific piles in supporting layers of the thawed soils[26].

    [1] Ershov E D(ed.).Geocryology of the USSR[M].Moscow:East Siberia and Far East.Nedra,1989.

    [2] Strakhov V N,Ulomov V M(eds).Seismic Zonation of the Russian Federation,4-sheet Map[M].Moscow:Tekart,2000.

    [3] Malinovskiy S B,et al.On seismic hazard in the Magadan Oblast[M].Kolyma,2005,1:27-32.

    [4] Velli Y Y,Dokuchaev V I,F(xiàn)edorov N F.Building on Permafrost Reference Manual[M].Leningrad:Stroyizdat,1977.

    [5] Chapovskiy E G(ed.).Engineering Geology of the USSR,F(xiàn)ar East[M].Moscow:Moscow State University Press,1977.

    [6] Vlasov V P.Construction of Pile Foundations in Unfrozen and Thawing Ground of the Magadan Region[M].Yakutsk:Permafrost Institute Press,1992.

    [7] Ministry of Regional Development of the Russian Federationa[M].Moscow:Updated Edition of SNiP,2012.

    [8] Ershov E D,Khrustalev L N,Dubikov G I,et al.Engineering Geocryology[M]:Moscow:A Reference Book.Nedra,1991.

    [9] Instruction for Design and Construction of Pile Foundations in Magadan[M].Magadan:USSR Minvostokstroy,1979.

    [10] Instruction for Design and Construction of Pile Foundations in Thawed and Thawing Soils in the Magadan Oblast[M].Magadan: USSR Minvostokstroy,1988.

    [11]Melnikov Permafrost Institute.Guidelines for Design and Construction of Pile Foundations in Thawing and Thawed Ground in the Magadan Oblast[M].Yakutsk:Melnikov Permafrost Institute Press,2012.

    [12]Ministry of Regional Development of the Russian Federationb[M].Moscow:Updated Edition of SNiP,2012.

    [13]Vlasov V P,Konash V E.Results of static pile testing data analysis in Magadan.In:Building in East Siberia and Far North[J].Krasnoyarsk:Krasnoyarsk Promstroyniiproekt,1974,29:68-72.

    [14]Vlasov V P.On the effect of“rest”on the bearing capacity of piles embedded in Magadan fine soils.In:Building in East Siberia and Far North[J].Krasnoyarsk Promstroyniiproekt,Krasnoyarsk,1974,29:84-91.

    [15]Vlasov V P.Experience with pile foundation construction in Magadan[J].Osnovaniya,F(xiàn)undamenty i Mekhanika Gruntov,1988,4:2-4.

    [16]Vlasov V P.Consideration of loading friction in static pile testing in thawing soils.In:Transactions of the Magadan Promstroyniiproekt[J].Magadan Promstroyniiproekt,Magadan,1991:29-36.

    [17]Vlasov V P.Introduction of composite slurried piles in Magadan.In:Transactions of the Magadan Promstroyniiproekt.Magadan Promstroyniiproekt[J].Magadan,1991:37-45.

    [18]Vlasov V P.Engineering-geocryological studies in support of pile foundation engineering practice in areas of sporadic permafrost[J].Kolyma,1994,7-8:16-21.

    [19]Vlasov V P.Rational method for pre-construction pile tests in thawing soils.In:Proceedings of Interregional Scientific Practical Conference“Russian Building Industry[C]//Problems,Prospects and Human Resources”,East Siberian State Technological University,Ulan-Ude,1999,2:3-12.

    [20]Konash V E.Pile Foundations in Sporadic Permafrost Areas(An Example of Magadan)[M].Stroyizdat,Leningrad,1977.

    [21]Vlasov V P,Zeeva A N.A new composite pile placement method for permafrost condition in Magadan[C]//In:Proceedings of the 7th InternationalSymposium on Cold Region Development (ISCORD– 2004).Hokkaido Organizing Committee,Japan, 2004.

    [22]Ministry of Regional Development of the Russian Federation[M].SP 22.13330.2011,Soil Bases of Buildings and Structures,Moscow:Updated Edition of SNIP 2.02.01-83*.2011.

    [23] Russian Federation Committee on Construction.SP 11-105-97,Geotechnical Site Investigations[M].Moscow:Guidelines for Permafrost Areas,2003.

    [24]Rastegaev I K.Excavation of Frozen Ground in Northern Building[M].Novosibirsk:Nauka,1992.

    [25]Vlasov V P.Management of stability of pile foundation in service.In:Proceedings of the Sixth International Symposium on Permafrost Engineering[J].Journal of Glaciology and Geocryology,2004a,189-193.

    [26]Vlasov V P.Problems of bed and foundation stability in the Magadan Oblast[J].Soil Mechanics and Foundation Engineering,2004b,41(2):65-70.

    猜你喜歡
    俄羅斯科學(xué)院尼科夫州立大學(xué)
    下雪天的聲音
    程耿東:俄羅斯科學(xué)院外籍院士里的中國科學(xué)家
    腳手架樓(大家拍世界)
    美國費(fèi)里斯州立大學(xué)(FSU)大學(xué)生學(xué)習(xí)動(dòng)力來源的思考與啟示
    美國學(xué)前教育教師職前專業(yè)能力培養(yǎng)的特征及啟示——以美國塞勒姆州立大學(xué)早期兒童教育專業(yè)為例
    永凍層排水處理的案例研究
    凍融循環(huán)引起的飽和孔隙組合轉(zhuǎn)換模擬研究
    信息技術(shù)在美國大學(xué)物理課程中的應(yīng)用——以美國俄亥俄州立大學(xué)為例
    物理與工程(2014年4期)2014-02-27 11:23:09
    以人為本 服務(wù)為體——俄亥俄州立大學(xué)
    對(duì)一個(gè)人的認(rèn)識(shí)
    知識(shí)窗(2013年6期)2013-02-11 10:52:04
    亚洲精品久久久久久婷婷小说| 男女高潮啪啪啪动态图| 春色校园在线视频观看| 欧美日韩国产mv在线观看视频| 日本欧美国产在线视频| 九色亚洲精品在线播放| 亚洲图色成人| 亚洲成色77777| 久久精品国产自在天天线| 中国国产av一级| 日日摸夜夜添夜夜爱| 精品少妇内射三级| 久久99热6这里只有精品| 超碰97精品在线观看| 国产精品国产av在线观看| 国产免费一级a男人的天堂| 亚洲伊人久久精品综合| 性色avwww在线观看| 天天躁夜夜躁狠狠躁躁| 宅男免费午夜| 成人毛片a级毛片在线播放| 亚洲一级一片aⅴ在线观看| 男男h啪啪无遮挡| 女人被躁到高潮嗷嗷叫费观| 亚洲在久久综合| 91午夜精品亚洲一区二区三区| 777米奇影视久久| 美国免费a级毛片| 国产爽快片一区二区三区| 精品少妇黑人巨大在线播放| 69精品国产乱码久久久| 美女福利国产在线| 高清在线视频一区二区三区| 又大又黄又爽视频免费| 一边亲一边摸免费视频| 久久精品夜色国产| 国产不卡av网站在线观看| 免费观看av网站的网址| 国产男人的电影天堂91| 少妇人妻精品综合一区二区| 久久av网站| 男女边摸边吃奶| 有码 亚洲区| 老司机亚洲免费影院| 国产一区有黄有色的免费视频| 国产有黄有色有爽视频| 久久人人爽人人爽人人片va| 国产精品99久久99久久久不卡 | videossex国产| 午夜精品国产一区二区电影| 亚洲成人av在线免费| 少妇人妻 视频| 啦啦啦视频在线资源免费观看| 国产一级毛片在线| 免费黄频网站在线观看国产| 欧美人与善性xxx| 天堂中文最新版在线下载| 一级毛片黄色毛片免费观看视频| 亚洲第一区二区三区不卡| 国产成人午夜福利电影在线观看| 在线观看免费视频网站a站| 日韩电影二区| 亚洲精华国产精华液的使用体验| 日本免费在线观看一区| 日韩精品有码人妻一区| 国产日韩一区二区三区精品不卡| 人妻人人澡人人爽人人| 午夜老司机福利剧场| 国产成人av激情在线播放| 在线观看国产h片| 黑人猛操日本美女一级片| 欧美国产精品一级二级三级| 日本猛色少妇xxxxx猛交久久| 国产激情久久老熟女| 中文字幕最新亚洲高清| www.熟女人妻精品国产 | 日韩电影二区| 高清视频免费观看一区二区| 亚洲人成77777在线视频| av网站免费在线观看视频| av.在线天堂| 在线观看免费高清a一片| 高清不卡的av网站| 色哟哟·www| 一本色道久久久久久精品综合| 国产男人的电影天堂91| 午夜免费鲁丝| 毛片一级片免费看久久久久| 街头女战士在线观看网站| 久久精品国产自在天天线| 日本午夜av视频| 一级毛片 在线播放| 久久ye,这里只有精品| 久久久久人妻精品一区果冻| 草草在线视频免费看| 欧美日韩精品成人综合77777| 国产精品无大码| 欧美日韩精品成人综合77777| 亚洲一级一片aⅴ在线观看| 国产男女内射视频| 伦理电影免费视频| 伦理电影免费视频| 91在线精品国自产拍蜜月| 王馨瑶露胸无遮挡在线观看| 成年人午夜在线观看视频| 欧美成人午夜精品| 黑人巨大精品欧美一区二区蜜桃 | 久久久国产一区二区| 国产精品久久久久久精品电影小说| 精品人妻在线不人妻| 只有这里有精品99| 精品少妇久久久久久888优播| 欧美 日韩 精品 国产| 国产亚洲欧美精品永久| 丝袜脚勾引网站| 热99久久久久精品小说推荐| 草草在线视频免费看| 国产精品久久久久久av不卡| 亚洲丝袜综合中文字幕| 日本午夜av视频| 国产免费一区二区三区四区乱码| videos熟女内射| 国产成人精品久久久久久| 亚洲内射少妇av| 99热这里只有是精品在线观看| 精品少妇黑人巨大在线播放| 久久久久久伊人网av| 久久午夜福利片| 日日啪夜夜爽| 免费看光身美女| 男女边吃奶边做爰视频| av电影中文网址| 久热久热在线精品观看| 亚洲国产精品国产精品| 性高湖久久久久久久久免费观看| 看非洲黑人一级黄片| 国产高清国产精品国产三级| 欧美 亚洲 国产 日韩一| 人妻系列 视频| 久久久久久久亚洲中文字幕| 熟女av电影| 欧美+日韩+精品| 熟女电影av网| a级毛片在线看网站| 国产精品无大码| 女人精品久久久久毛片| 日本vs欧美在线观看视频| 久久影院123| 国精品久久久久久国模美| 日韩欧美精品免费久久| 黄网站色视频无遮挡免费观看| 久久久国产欧美日韩av| videosex国产| 最近中文字幕2019免费版| 99精国产麻豆久久婷婷| 久久精品国产自在天天线| 两个人看的免费小视频| 亚洲精品第二区| 80岁老熟妇乱子伦牲交| 色网站视频免费| 国产精品国产三级专区第一集| 国产成人免费观看mmmm| 最后的刺客免费高清国语| 亚洲少妇的诱惑av| 插逼视频在线观看| 在线观看三级黄色| 美女国产高潮福利片在线看| 亚洲三级黄色毛片| 久久99一区二区三区| 久久免费观看电影| 久久久国产一区二区| 热re99久久国产66热| 欧美xxxx性猛交bbbb| 久热这里只有精品99| 日本黄大片高清| 一级毛片电影观看| 蜜桃国产av成人99| 国产在线免费精品| 中文欧美无线码| 一级片'在线观看视频| 最近手机中文字幕大全| av在线app专区| 狠狠婷婷综合久久久久久88av| 大码成人一级视频| 亚洲综合精品二区| 久久久国产欧美日韩av| 国产高清不卡午夜福利| 国产熟女午夜一区二区三区| 久久午夜综合久久蜜桃| 国产精品久久久久久av不卡| 国产精品国产三级国产专区5o| 精品人妻一区二区三区麻豆| 女人久久www免费人成看片| 久久久久久久久久久免费av| 国产精品.久久久| 天天操日日干夜夜撸| 最黄视频免费看| 成人漫画全彩无遮挡| 国产精品熟女久久久久浪| 内地一区二区视频在线| 日韩欧美一区视频在线观看| 国产熟女欧美一区二区| 国产极品粉嫩免费观看在线| 五月玫瑰六月丁香| videossex国产| 欧美成人精品欧美一级黄| 国产xxxxx性猛交| 在线精品无人区一区二区三| 一级片免费观看大全| av免费在线看不卡| 热99国产精品久久久久久7| 老女人水多毛片| 亚洲av中文av极速乱| 91精品国产国语对白视频| 精品国产一区二区三区四区第35| 亚洲av成人精品一二三区| 国产精品久久久久久精品电影小说| 欧美日本中文国产一区发布| 精品一区在线观看国产| tube8黄色片| 波多野结衣一区麻豆| 日本欧美国产在线视频| 黄色一级大片看看| 制服人妻中文乱码| 久久久久久久亚洲中文字幕| 精品一区二区三区四区五区乱码 | 人人妻人人添人人爽欧美一区卜| 亚洲四区av| 男女无遮挡免费网站观看| 午夜福利在线观看免费完整高清在| 欧美bdsm另类| 97在线视频观看| av不卡在线播放| 国产亚洲av片在线观看秒播厂| 国产高清不卡午夜福利| 亚洲国产av新网站| 男女边摸边吃奶| av免费在线看不卡| 久久综合国产亚洲精品| 丝袜脚勾引网站| 涩涩av久久男人的天堂| 人妻一区二区av| 日韩av不卡免费在线播放| 黑人高潮一二区| 久久 成人 亚洲| 香蕉精品网在线| 蜜桃在线观看..| 亚洲国产精品一区二区三区在线| 国产麻豆69| 在线观看免费高清a一片| 国产日韩欧美亚洲二区| 国产国语露脸激情在线看| 2021少妇久久久久久久久久久| 深夜精品福利| 欧美少妇被猛烈插入视频| 老熟女久久久| 久久精品久久久久久噜噜老黄| 亚洲五月色婷婷综合| 欧美日韩综合久久久久久| 视频中文字幕在线观看| 少妇的逼水好多| 成人国语在线视频| 国产深夜福利视频在线观看| 一区在线观看完整版| 国产成人aa在线观看| 国产有黄有色有爽视频| 王馨瑶露胸无遮挡在线观看| 成人免费观看视频高清| 校园人妻丝袜中文字幕| 国产又色又爽无遮挡免| 黑人高潮一二区| 午夜精品国产一区二区电影| 国产熟女午夜一区二区三区| 亚洲成人一二三区av| 国产精品 国内视频| 午夜福利影视在线免费观看| 老司机影院毛片| 黑人欧美特级aaaaaa片| 宅男免费午夜| 欧美精品av麻豆av| 国产一区有黄有色的免费视频| 国产欧美日韩综合在线一区二区| 免费看av在线观看网站| 日产精品乱码卡一卡2卡三| 我要看黄色一级片免费的| 国产欧美亚洲国产| 日韩成人av中文字幕在线观看| 国产淫语在线视频| 各种免费的搞黄视频| 中文字幕制服av| 在线观看免费日韩欧美大片| 亚洲精品第二区| 在线看a的网站| 午夜老司机福利剧场| 国产在线免费精品| 亚洲精品av麻豆狂野| 18+在线观看网站| 亚洲av福利一区| 新久久久久国产一级毛片| 99热国产这里只有精品6| 秋霞在线观看毛片| 汤姆久久久久久久影院中文字幕| 亚洲精品成人av观看孕妇| 满18在线观看网站| 高清欧美精品videossex| 波野结衣二区三区在线| 18禁在线无遮挡免费观看视频| 一本一本久久a久久精品综合妖精 国产伦在线观看视频一区 | xxx大片免费视频| 丝瓜视频免费看黄片| 欧美日韩视频精品一区| 国产精品久久久久久精品古装| 纵有疾风起免费观看全集完整版| 99久国产av精品国产电影| 精品国产一区二区三区久久久樱花| 久久久久久久精品精品| 久久久久久久久久成人| 国产日韩一区二区三区精品不卡| 新久久久久国产一级毛片| 亚洲av国产av综合av卡| 狂野欧美激情性bbbbbb| 久久精品人人爽人人爽视色| www.熟女人妻精品国产 | 综合色丁香网| 久久久久精品人妻al黑| 在线观看美女被高潮喷水网站| 日韩欧美一区视频在线观看| 一级毛片电影观看| 国产不卡av网站在线观看| √禁漫天堂资源中文www| 国产精品久久久av美女十八| 国产成人精品婷婷| 日韩精品免费视频一区二区三区 | 亚洲伊人色综图| 国产熟女午夜一区二区三区| 纯流量卡能插随身wifi吗| 如日韩欧美国产精品一区二区三区| 99热全是精品| 中文欧美无线码| 天堂俺去俺来也www色官网| 婷婷色麻豆天堂久久| 亚洲欧美中文字幕日韩二区| 久久久亚洲精品成人影院| 久久久久精品性色| 成人毛片a级毛片在线播放| 在线 av 中文字幕| 国产永久视频网站| 国产精品一区www在线观看| 国产成人精品久久久久久| 精品久久久精品久久久| 香蕉丝袜av| av国产久精品久网站免费入址| 大香蕉久久网| 少妇猛男粗大的猛烈进出视频| 18禁国产床啪视频网站| 精品一区二区免费观看| 制服人妻中文乱码| 欧美少妇被猛烈插入视频| 999精品在线视频| 日韩熟女老妇一区二区性免费视频| 日韩中文字幕视频在线看片| 99久久精品国产国产毛片| 中国美白少妇内射xxxbb| 亚洲天堂av无毛| 欧美人与性动交α欧美软件 | 观看av在线不卡| 色婷婷久久久亚洲欧美| 午夜福利,免费看| 日韩大片免费观看网站| 亚洲人与动物交配视频| 亚洲经典国产精华液单| 亚洲精品国产色婷婷电影| 晚上一个人看的免费电影| 免费女性裸体啪啪无遮挡网站| 欧美日韩视频高清一区二区三区二| 久久久国产欧美日韩av| 久久99蜜桃精品久久| 亚洲综合精品二区| 免费人成在线观看视频色| 国产精品秋霞免费鲁丝片| 国产乱来视频区| 成年美女黄网站色视频大全免费| 丰满乱子伦码专区| 亚洲精品国产av蜜桃| 一级毛片黄色毛片免费观看视频| 在线观看国产h片| 免费黄网站久久成人精品| av网站免费在线观看视频| 色视频在线一区二区三区| 在线观看一区二区三区激情| 国产精品 国内视频| 精品久久久精品久久久| 久久久精品免费免费高清| 久久精品久久久久久噜噜老黄| 欧美日韩av久久| 免费大片黄手机在线观看| 大片电影免费在线观看免费| 一级黄片播放器| 久久99蜜桃精品久久| 久久99热这里只频精品6学生| 国产精品麻豆人妻色哟哟久久| 日韩中文字幕视频在线看片| 久久久精品免费免费高清| 中文字幕最新亚洲高清| 捣出白浆h1v1| 成人无遮挡网站| 九九在线视频观看精品| av女优亚洲男人天堂| 男女边摸边吃奶| 国产精品一二三区在线看| 亚洲熟女精品中文字幕| 亚洲美女搞黄在线观看| 99久久中文字幕三级久久日本| 一个人免费看片子| 日韩精品有码人妻一区| 国产无遮挡羞羞视频在线观看| 亚洲中文av在线| 黑人高潮一二区| 久久人人爽人人片av| 亚洲成色77777| 国产激情久久老熟女| av线在线观看网站| 日韩av不卡免费在线播放| 亚洲国产最新在线播放| 国产伦理片在线播放av一区| 亚洲av成人精品一二三区| 黄网站色视频无遮挡免费观看| 你懂的网址亚洲精品在线观看| 久久影院123| 日韩一区二区视频免费看| 国产精品秋霞免费鲁丝片| 青春草国产在线视频| 国产免费一级a男人的天堂| 亚洲婷婷狠狠爱综合网| 宅男免费午夜| 国产激情久久老熟女| 日日啪夜夜爽| 国产精品一国产av| 国产日韩欧美视频二区| 哪个播放器可以免费观看大片| 中文字幕制服av| 我的女老师完整版在线观看| 久热这里只有精品99| 欧美性感艳星| 成人免费观看视频高清| 久久韩国三级中文字幕| 日本黄色日本黄色录像| 一级毛片电影观看| 国产日韩欧美亚洲二区| 一区二区三区精品91| 五月天丁香电影| www.av在线官网国产| 97在线视频观看| 新久久久久国产一级毛片| av福利片在线| 天堂俺去俺来也www色官网| 国产免费一级a男人的天堂| 国产1区2区3区精品| 日本色播在线视频| 成年人午夜在线观看视频| 一级毛片黄色毛片免费观看视频| 男男h啪啪无遮挡| 日韩成人伦理影院| 亚洲国产欧美在线一区| 欧美日韩亚洲高清精品| 久久免费观看电影| 中文乱码字字幕精品一区二区三区| 大香蕉久久网| 天堂8中文在线网| 少妇的逼水好多| 草草在线视频免费看| 啦啦啦啦在线视频资源| 一级,二级,三级黄色视频| 亚洲精品日本国产第一区| 最近中文字幕2019免费版| 高清不卡的av网站| 免费在线观看完整版高清| 欧美少妇被猛烈插入视频| 男人添女人高潮全过程视频| 女人精品久久久久毛片| 精品99又大又爽又粗少妇毛片| 国产精品成人在线| a 毛片基地| 午夜福利网站1000一区二区三区| 国产精品久久久久成人av| 精品国产一区二区三区久久久樱花| 亚洲精品久久午夜乱码| 99国产精品免费福利视频| 精品第一国产精品| 久久精品aⅴ一区二区三区四区 | 人人妻人人澡人人爽人人夜夜| 亚洲精品久久午夜乱码| 少妇被粗大的猛进出69影院 | 日韩 亚洲 欧美在线| 99视频精品全部免费 在线| 男男h啪啪无遮挡| 亚洲国产精品999| 在线观看国产h片| 少妇的逼水好多| 有码 亚洲区| 亚洲三级黄色毛片| xxx大片免费视频| 国产高清三级在线| 十分钟在线观看高清视频www| 日韩制服丝袜自拍偷拍| 久久精品国产自在天天线| 久久精品久久久久久久性| 蜜臀久久99精品久久宅男| 中文乱码字字幕精品一区二区三区| 久久人妻熟女aⅴ| 欧美人与性动交α欧美软件 | 午夜激情av网站| 最黄视频免费看| 欧美97在线视频| 日本av手机在线免费观看| av.在线天堂| 性色av一级| 久久久久久伊人网av| 18+在线观看网站| 亚洲成人手机| 亚洲精品视频女| 亚洲国产精品国产精品| 中文字幕最新亚洲高清| 人体艺术视频欧美日本| 99热这里只有是精品在线观看| 99热网站在线观看| 亚洲国产精品999| 婷婷色综合www| 日本与韩国留学比较| 久久久国产欧美日韩av| 人人澡人人妻人| 香蕉丝袜av| 啦啦啦啦在线视频资源| av又黄又爽大尺度在线免费看| 在线精品无人区一区二区三| 亚洲av免费高清在线观看| 一区二区三区精品91| 国产亚洲av片在线观看秒播厂| 亚洲国产精品一区三区| 免费观看av网站的网址| 丝袜在线中文字幕| 亚洲国产欧美在线一区| 免费大片黄手机在线观看| 亚洲欧美中文字幕日韩二区| 视频区图区小说| 欧美变态另类bdsm刘玥| 欧美日韩国产mv在线观看视频| 免费高清在线观看视频在线观看| 老女人水多毛片| 观看美女的网站| 亚洲第一区二区三区不卡| 亚洲精品456在线播放app| 亚洲成国产人片在线观看| 99re6热这里在线精品视频| 热99国产精品久久久久久7| 观看av在线不卡| 亚洲精品久久成人aⅴ小说| 男男h啪啪无遮挡| 亚洲精品日韩在线中文字幕| 丁香六月天网| 亚洲精品久久午夜乱码| av网站免费在线观看视频| 黑人巨大精品欧美一区二区蜜桃 | 国产精品一区二区在线观看99| 日韩 亚洲 欧美在线| 色婷婷av一区二区三区视频| 国产成人一区二区在线| 中文乱码字字幕精品一区二区三区| 久久精品国产自在天天线| 久久精品熟女亚洲av麻豆精品| 国产成人a∨麻豆精品| 日韩av不卡免费在线播放| 新久久久久国产一级毛片| 国产综合精华液| 大话2 男鬼变身卡| 九九爱精品视频在线观看| av天堂久久9| 天堂中文最新版在线下载| 久久久久久久大尺度免费视频| 多毛熟女@视频| 精品国产一区二区三区久久久樱花| 欧美丝袜亚洲另类| 亚洲国产欧美在线一区| 日韩熟女老妇一区二区性免费视频| 一级黄片播放器| 亚洲精品色激情综合| 精品酒店卫生间| 一边摸一边做爽爽视频免费| 日韩三级伦理在线观看| 伦理电影大哥的女人| 亚洲,一卡二卡三卡| 国产免费一级a男人的天堂| 欧美成人午夜免费资源| 夫妻午夜视频| 色网站视频免费| 久热久热在线精品观看| 一级毛片电影观看| av.在线天堂| 中文字幕免费在线视频6| 在线观看国产h片| 高清黄色对白视频在线免费看| 丝瓜视频免费看黄片| 亚洲情色 制服丝袜| 中文天堂在线官网| 国产日韩欧美亚洲二区| 亚洲 欧美一区二区三区| 1024视频免费在线观看| 精品亚洲成国产av| xxxhd国产人妻xxx| 22中文网久久字幕| tube8黄色片| 美女福利国产在线| 两性夫妻黄色片 | 日韩中文字幕视频在线看片| 女人久久www免费人成看片|