    Millau viaduct geotechnical studies and foundations

    F. Schlossera,?, C. Servantb, A. Guillouxc, A. Bergerec
    aENPC, France

    bEiffage Travaux Publics, France

    cTerrasol, France

    ARTICLE INFO

    Article history:

    Received 26 March 2013

    Received in revised form 1 May 2013

    Accepted 15 May 2013

    Cable stayed bridge

    Foundation design

    Pile settlement

    Rotation

    Observational method

    The Millau viaduct over the Tarn River is an exceptional bridge considering the height under the deck and the 2.5 km total length. Each of the seven high piers is founded on a thick raft setting on four large piles of 5 m in diameter and 10–15 m deep. The ground schematically consists of limestone in the north and of marls in the south. As the bridge is very sensitive to foundation settlements, the concessionary company decided to use the observational method for controlling the displacements and if necessary stabilize the foundations. The measurements show that the movements have remained small and admissible, particularly in terms of the rotations. The settlements have not occurred continuously under the load, but by steps.

    ? 2013 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V. All rights reserved.

    1. Geological and geotechnical context

    The Millau viaduct links two limestone plateaus separated by a deep valley eroded by the Tarn River. The sedimentary basins, which started to form during the middle of the Secondary Era, appear to be particularly well preserved. The Tarn has revealed the stratigraphy of the zone which shows Triassic formations at the bottom of the valley and then displays the full sequence up to the end of the Jurassic Era which is represented by the limestone at the top of the Larzac plateau to the south of the viaduct as shown on the right of Fig. 1.

    The rock encountered on the site is exclusively sedimentary, composed partly of dolomitic limestone and partly of compact marls (Mennessier and Collomb, 1983).

    A study of local tectonics shows that there are old faults which affect the older horizons in the sequence, back as far as the Lias. The old faults are located to the north of the viaduct but do not affect the more recent horizons of the geological structure of the top of the southern plateau, such as the Kimmeridgian stage. This typeof fault was specifically encountered by the northern abutment of the viaduct (C0) as shown in Fig. 1.

    There are also some more recent non-active faults that affect the whole stratigraphy of the zone and cut across the viaduct site by pier P4 and again between pier P7 and the southern abutment C8 (Fig. 1). The strike slips on these faults, particularly where the pier P4 is located, have caused difficulties for the construction and have required an adaptation of the foundations.

    Before starting the earthworks, the concession company and its public works contractor EIFFAGE TP systematically carried out additional geotechnical surveys of the soils to support the foundations by means of destructive drilling down to 10 m below the deepest level of the pile shafts and 15 m below the base of the foundation plates for the abutments.

    As everyone knows, the main difficulty with rock mechanics is obtaining representative samples (Panet, 1976; Duncan, 1996). Laboratory tests carried out on small samples are not representative of the scale of all the discontinuities in the rock masses (especially the direction and size of the faults), which means that direct use of the results is not at all reliable. Thus the overall mechanical properties of a rocky block, generally assumed to be isotropic (φ, c: internal friction angle and cohesion, respectively; E: modulus of deformation) are more and more frequently determined by semi-empirical methods which combine geotechnical tests with geological observation of the borehole samples and existing outcrops (the RMR (rock mass rating) classification (Bieniawski, 1989) in accordance with the empirical method proposed by Hoek and Brown (1988) and Hoek et al. (1995)).

    The RMR varies from 0 to 105. The mean values recorded on the Millau viaduct site are 65 for the limestone and 53 for the marls.

    Fig. 1. Simplified geotechnical cross section of the viaduct.

    There are three different types of foundation rocks along the viaduct. The first one, the Bajocian dolomitic limestone at the northern abutment (C0), is a very hard rock with an unconfined compressive strength Rc= 110 MPa but with karsts filled with clay. At the top of the platform where the raft was placed, a RMR value of 70–80 was determined.

    The compacted marls from pier P7 to pier P6 constitute the second rock type. Slides are visible at the soil surface due to the 2 m thick scree layer underlain by soft clay above the marls. Laboratory tests have given: Rc= 10–15 MPa, E = 3–6 GPa, γ = 25 kN/m3. The mean values of shear strength have been determined in the 15 m thick top layer of marls: RMR = 45, c = 0.1 MPa, φ = 30°.

    The Hettangian limestone on the two sides of the Tarn River from pier P4 to the abutment (C0) constitutes the third rock type. Its bedding is sub-horizontal on the south side and at a 10°/15°angle on the north side. The results from laboratory tests are: Rc= 50–70 MPa, E = 8 to 15 GPa, γ = 25 kN/m3. The determined shear strength values are: RMR = 65 to 70, c = 2.5 MPa, φ = 37°.

    It can be concluded that the marls are less resistant than the limestone. It is the reason that the piles in marls are enlarged at their base and are longer than the piles in limestone (Fig. 2).

    2. Foundation system

    The viaduct design produced by the authorities defined and designed the foundation systems for the piers and abutments. Although the final system is based on the same principles, it varies slightly depending on whether a given bearing is located on limestone or on marls. The marls not only have weaker mechanical properties than the limestone, but also show superficial slide which affects the upper part.

    Fig. 2. Standard cross sections of piers in marls and limestone.

    Spread foundations were chosen for abutments C0 and C8 which are founded on limestone. The foundation system is a monolithic set composed of a 1 m thick raft foundation for each front abutment, connected to two side footings for each rear abutment with the abutment platforms at different levels.

    The foundation system (Fig. 2) for each of the 7 piers is composed of 4 reinforced-concrete piles with a diameter of 5 m and a depth of 10–15 m drilled in the rock and bonded together at the top by a 3.5 m thick reinforced-concrete footing, which is itself bonded to the pier. In marls, the footing is thicker and the piles deeper, with their base diameter being increased to 7 m.

    Foundations of piers 2 and 6 have been taken as the typical examples in the present paper. The pier 2 is the highest one (245 m) and is founded in limestone, while the pier 6 is founded in marls and has a medium height.

    The behaviour of this type of pier foundation system is complex. It is a piled raft foundation system in which part of the load is transferred to the footing. The way that this behaviour was simplified is particularly restrictive as it was assumed that firstly, the footing bears none of the load and secondly that no skin friction (qs= 0) is created along the shaft except in the case of tensile stress.

    This comes down to assuming that bearing capacity depends solely on the ultimate pressure on the rock at the bottom of the shaft and that settlement results only from deformations of the rock at the bottom of the shaft, which makes the foundations more flexible than they really are.

    Bearing capacity was de fined using standard Terzaghi equations adapted to take into account the inclination of the load and the proximity to the hillside, to which an overall stability calculation was added for shafts drilled in marly hillsides, as well as for the foundation of pier P3 in limestone whose overall stability had to be improved by a reinforced soil retaining wall (Tervoile).

    With regard to settlement and foundation rotation subsequent to service loads (serviceability limit states), the calculation method used was the modulus of reaction to the behaviour hypotheses described above.

    Several pile-loading trial tests were carried out in the marly soils to assess the skin friction along the shaft. Fig. 3 shows the results of one of these tests on a bored pile with a diameter of 0.80 m. Critical creep load at point Qcis approximately 5200 kN (qc= 10 MPa) for a shaft head settlement of 5.6 mm.

    Despite the uncertainties regarding the assessment of the mechanical properties of the rock and the calculation methods used, the design for the pier foundations seems to be quite reliable.

    3. Foundation design

    To optimize the foundation design by using the observational method required iterations between the calculation results of the most probable behaviour of the foundation and the results of a constant monitoring during the construction. The overall stability of the foundation with regard to the proximity to the hillside was not to be optimized and a large safety factor was taken into account. As indicated before, a retaining structure has been constructed at pier P3 in order to increase the factor of safety. However the monitoring was also used to verify that for every pier no problem was encountered with regard to this stability.

    The load bearing capacity and settlement of the foundations were calculated taking the least favourable combinations for the ultimate limit and serviceability limit states. Vertical load distribution was applied at the centre of the foundations to evaluate normal and horizontal strains and the longitudinal and transverse bending moments (Fig. 4) (Yu and Vayssade, 1991; Duncan, 1996). Wind load was examined separately (meteorology and wind tunnel tests).

    Unlike the working assumption taken for the authorities’ design of the project, the construction calculations also took into account the behaviour of a piled raft foundation where part of the load is supported by the footing, and skin friction and tip resistance in the pile shafts are taken into consideration. This assumption, which is more like the actual behaviour, had to be adopted while the observational method was to be used.

    The foundation system was designed by SETEC on the basis of the elastoplasticity calculated at the ultimate and serviceability limit states, modelling soil behaviour by means of springs positioned vertically beneath the pile shaft and horizontally along it. This design, which does not take into account either the bearing capacity of the footing or skin friction along the shaft, was requested by the concession management authorities for greater safety.

    TERRASOL used its own software, FoXta, to study the foreseeable deformations of the piled raft foundation system and define vigilance and alarm levels for deformation (settlement and rotation), for permanent loads and for three types of loads (dead weight of piers, dead weight of piers and deck, permanent loads and maximum oblique wind load).

    Fig. 4. Loads applied to pier P2.

    In this calculation, the footing is assumed to be stiff and stiffness springs are applied at several points in order to simulate the ground and the shaft. The skin friction mobilization law is that of Frank and Zhao (1982) whilst the Young’s modulus for each geological layer of soil, which is assumed to be isotropic, is defined by the empirical equation (Hoek and Brown, 1988, 1996):

    where RMR is the rock mass rating of the rocky layer, d is the rock decompression factor, and Rc(MPa) is the unconfined compressive strength.

    The behaviour is different depending upon the ground conditions: in limestone, only 35% of the load is carried by the shafts, while in marls this ratio reaches about 90%. In addition, nearly 90% of the load transferred to the shaft is supported by the skin friction, whether the ground is limestone or marl. This shows that the shafts react very little at the base (Table 1).

    4. Use of the observational method

    From the outset, the concession-holding company, backed by its consultants and design and construction supervisor, adopted a cautious approach for the viaduct foundation design. The approach consisted primarily of using the observational method (Peck, 1969, 2002; Allagnat, 2005) to reduce areas of uncertainty and risk. It was continued throughout the construction of the viaduct and was composed of the following stages:

    (1) Additional investigations for each pier, particularly by means of destructive drilling down to 10 m below the bottom of the pile shafts.

    (2) Geotechnical monitoring of all earthworks (slopes and pile shafts), using the RMRs to validate or modify the initial geotechnical properties.

    Table 1Settlement and rotation of foundations for piers P2 and P6 for three types of loads.

    (3) Adaptation or even modification of pier and abutment foundations.

    (4) Calculation of the serviceability limit state of the piled raft foundation of each pier for each type of load, based on newly identified rock properties and load transfer to the footing and skin friction along the shafts.

    (5) Close supervision and monitoring of foundation movements during construction, combined with the definition of thresholds beyond which pre-defined reinforcement measures are to be implemented.

    It should be noted that the observational method is not just a question of measurements; its purpose is to reduce areas of uncertainty by constantly comparing the forecasts and the actual behaviour during the monitoring process, and implementing reinforcement measures whenever the behaviour of the structure goes beyond certain levels.

    Adapting the foundations principally involved: (1) turning the bearing foundation into deep foundations (abutment C0), (2) replacing with concrete a zone with weak mechanical properties, like faults or clay-filled karsts, (abutment C8, pier P4), (3) widening the base of some shafts to reduce differential settlement and improve load bearing capacity (pier P4), and (4) removing any contact between piers and slopes (pier P7).

    The instrumentation installed for the observational method mainly consisted of markers on the four corners of each footing on the bases of the piers and clinometers. These allowed precise topographic measurements to be taken as well as spirit level measurements. Measurements were taken every month during viaduct construction.

    Two types of thresholds have been defined: (1) a vigilance level beyond which measurements must be taken at short intervals to confirm the evolution of the displacements, and (2) an alert level at which pre-defined reinforcement measures are to be implemented (Table 2). A distinction has been made in the displacements between the average settlement “s” of the footing and its rotation“ω”.

    With regard to the vigilance level for footing rotation, it was agreed that the threshold would represent a very cautious degree of displacement at deck level. The limit was thus set at a rotation ω = 5 × 10–4rad.

    The alert level is reached when a series of measurements at short intervals over a period of one to two months confirms that the vigilance level has been exceeded. During this period, specific investigations were carried out at the pier foundation in order to identify the problem and adapt the reinforcement workaccordingly. The reinforcement measures depended on the problem encountered.

    Table 2Definition of vigilance and alert levels.

    Fig. 5 compares the actual settlement and rotation values recorded for piers P2 (foundation in limestone) and P6 (foundation in marls) in relation to time and concrete mass, with the theoretical values. It is noted that the settlement values recorded in the limestone show abrupt variations followed by progress in plateaus, whereas the settlement observed in the marl is more continuous. It seems likely that this is due to extensive natural fracturing in the limestone on one hand, and the disorganization of soil structure caused by the explosives used to excavate the pile shaft on the other. Furthermore, the slopes of the average settlement curves are generally below the vigilance level, bearing in mind the previous comment. The rotation values are very low and always well below the vigilance level, which is very important for the structure. It waschecked, by the yearly controls, that the foundations deformations did not change 8 years after their completion.

    Fig. 5. Comparison of calculations and observations for the total settlements of the piers (a) P2 in limestone and (b) P6 in marls.

    5. Conclusions

    The findings of the studies and monitoring of the Millau vaduct foundations during pier construction are as follows:

    (1) Despite its limitations, the RMR method which was originally developed for tunnelling in rock masses provides a fairly reliable assessment of the mechanical properties for the foundations on the limestone and compacted marl encountered on the site.

    (2) The actual behaviour of the pier foundations proved to be that of a piled raft foundation in which the load carried by the footing increases with the stiffness of the soil on which it is laid, which is particularly relevant for piers with foundations in limestone.

    (3) The foundation settlement and rotation values recorded during the construction and after completion are quite close to the results of the piled raft foundation calculation.

    (4) The settlement observed as the piers went up varied according to the type of ground. Although it was fairly continuous in the marl, it showed abrupt increases in the limestone, which then continued in plateaus.

    (5) The observational method has been proved to be a sound tool for monitoring the risk of movement in the pier foundations, given the possibility of discovering unidentified karsts or zones of heterogeneity.

    (6) Overall settlement of the piers under their own weight does not exceed 5 mm. The rotations are minimal and can barely be measured. This means that the thresholds used for the implementation of the observational method have not yet been reached.

    Allagnat D. La méthode observationnelle pour le dimensionnement interactif des ouvrages. Paris: Presses de l’Ecole Nat. des Ponts et Chaussées, Mai; 2005 (in French).

    Bieniawski ZT. Engineering rock mass classifications. New York: Wiley; 1989.

    Duncan CW. Foundations on rock. London: E & FN Spon/Chapman & Hall; 1996.

    Frank R, Zhao SR. Estimation par les paramètres pressiométriques de l’enfoncement sous charge axiale des pieux forés. Bull. Liaison LCPC No. 119; 1982.

    Hoek E, Brown ET. The Hoek-Brown failure criterion – a 1988 update. In: Curran JH, editor. Proc. 15th Canadian Rock Mech. Symp. Toronto: Department of Civil Engineering, University of Toronto; 1988. p. 31–8.

    Hoek E, Brown ET. Underground excavations in rock. London: E & FN Spon/Chapman & Hall; 1996.

    Hoek E, Kaiser PK, Bawden WF. Support underground: excavations in hard rock. Rotterdam: A.A. Balkema; 1995.

    Mennessier G, Collomb P. Carte géologique de Millau et sa notice géologique. Orléans Cedex: BRGM; 1983.

    Panet M. La mécanique des roches appliquée aux ouvrages de génie civil. Nationale des Ponts et Chaussées: association amicale des ingénieurs anciens élèves de l’Ecole Nationale des Ponts et Chaussées; 1976 (in French).

    Peck RD. Advantages and limitation of the observational method in applied soil mechanics. Geotechnique 1969;19(2):171–87.

    Peck RD. The observational method can be simple. Proceedings of the ICE Geotechnical Engineering 2002;149(2):71–4.

    Yu Xianbin, Vayssade B. Joint profiles and their roughness parameters. International Journal of Rock Mechanics and Mining Sciences 1991;28(4): 333–6.

    ?Corresponding author.

    E-mail address: schlosserfr@wanadoo.fr (F. Schlosser).

    Peer review under responsibility ofinstitute of Rock and Soil Mechanics, Chinese Academy of Sciences.

    1674-7755 ? 2013 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V. All rights reserved.

    http://dx.doi.org/10.1016/j.jrmge.2013.05.002

    亚洲av五月六月丁香网| 亚洲电影在线观看av| 午夜免费成人在线视频| 久久人人爽人人爽人人片va| 一边摸一边抽搐一进一小说| 校园春色视频在线观看| 色5月婷婷丁香| 悠悠久久av| 五月伊人婷婷丁香| or卡值多少钱| 午夜精品久久久久久毛片777| 老师上课跳d突然被开到最大视频| 国产毛片a区久久久久| 村上凉子中文字幕在线| 国产精品日韩av在线免费观看| 毛片女人毛片| 男女那种视频在线观看| 夜夜看夜夜爽夜夜摸| 搡老岳熟女国产| 偷拍熟女少妇极品色| 非洲黑人性xxxx精品又粗又长| 可以在线观看毛片的网站| 亚洲电影在线观看av| 黄色女人牲交| 性插视频无遮挡在线免费观看| 精品午夜福利视频在线观看一区| 少妇熟女aⅴ在线视频| av中文乱码字幕在线| 欧美一区二区国产精品久久精品| 国产成人aa在线观看| 啦啦啦观看免费观看视频高清| 在线天堂最新版资源| 精品久久久久久久久亚洲 | 久久精品国产亚洲av天美| 不卡视频在线观看欧美| 成人三级黄色视频| 69人妻影院| 欧美3d第一页| 老司机深夜福利视频在线观看| 2021天堂中文幕一二区在线观| 成人特级av手机在线观看| 国产真实乱freesex| 中文字幕久久专区| 成人毛片a级毛片在线播放| 亚州av有码| 桃红色精品国产亚洲av| 观看免费一级毛片| 亚洲第一区二区三区不卡| 在线免费观看的www视频| 欧美成人一区二区免费高清观看| 亚洲久久久久久中文字幕| 黄色一级大片看看| 久久亚洲精品不卡| 亚洲精华国产精华精| 免费黄网站久久成人精品| 国产精品国产高清国产av| av国产免费在线观看| 欧美日韩乱码在线| 成人二区视频| 日本熟妇午夜| 久久精品久久久久久噜噜老黄 | 亚洲成人免费电影在线观看| 亚洲av免费在线观看| 久久国内精品自在自线图片| 久久久精品大字幕| 国产爱豆传媒在线观看| 欧美性猛交黑人性爽| 国产精品美女特级片免费视频播放器| 99精品在免费线老司机午夜| 此物有八面人人有两片| 欧美性感艳星| 啦啦啦啦在线视频资源| 日韩精品中文字幕看吧| 久久久成人免费电影| 性插视频无遮挡在线免费观看| 色尼玛亚洲综合影院| .国产精品久久| 国产精品av视频在线免费观看| 性插视频无遮挡在线免费观看| 久久久久精品国产欧美久久久| 国产精品亚洲一级av第二区| 亚洲18禁久久av| 日本欧美国产在线视频| 成人一区二区视频在线观看| 久久欧美精品欧美久久欧美| 免费看美女性在线毛片视频| 一卡2卡三卡四卡精品乱码亚洲| 白带黄色成豆腐渣| 91麻豆精品激情在线观看国产| 国产亚洲精品久久久com| 久久久精品大字幕| 久久欧美精品欧美久久欧美| 亚洲av第一区精品v没综合| 免费看日本二区| 又黄又爽又免费观看的视频| 久久中文看片网| 欧美成人一区二区免费高清观看| 人妻丰满熟妇av一区二区三区| 日韩欧美 国产精品| 久久久久久国产a免费观看| 无人区码免费观看不卡| 亚洲性久久影院| 日韩中字成人| 日韩高清综合在线| 欧美一级a爱片免费观看看| 1000部很黄的大片| 狂野欧美激情性xxxx在线观看| 在线看三级毛片| 欧美激情国产日韩精品一区| 一区福利在线观看| 美女cb高潮喷水在线观看| 联通29元200g的流量卡| 午夜免费成人在线视频| 色播亚洲综合网| 精品久久久久久久久久久久久| 动漫黄色视频在线观看| 国产av不卡久久| 好男人在线观看高清免费视频| 色av中文字幕| 久久久久久久亚洲中文字幕| 成人高潮视频无遮挡免费网站| 麻豆久久精品国产亚洲av| 自拍偷自拍亚洲精品老妇| 一进一出好大好爽视频| 综合色av麻豆| 国产v大片淫在线免费观看| 波野结衣二区三区在线| 亚洲熟妇中文字幕五十中出| 99热这里只有是精品在线观看| 亚洲va日本ⅴa欧美va伊人久久| 精品国产三级普通话版| 成年人黄色毛片网站| 欧美最黄视频在线播放免费| 日本与韩国留学比较| 91在线精品国自产拍蜜月| 亚洲图色成人| 22中文网久久字幕| 69人妻影院| 精品人妻一区二区三区麻豆 | ponron亚洲| 极品教师在线免费播放| 国产精品永久免费网站| 99久久久亚洲精品蜜臀av| a级毛片a级免费在线| 一级av片app| 亚洲av二区三区四区| 亚洲精品色激情综合| bbb黄色大片| 国产精品99久久久久久久久| 99久久精品热视频| 久9热在线精品视频| 尾随美女入室| 在线观看一区二区三区| 国产欧美日韩一区二区精品| 欧美人与善性xxx| 久久精品夜夜夜夜夜久久蜜豆| 99riav亚洲国产免费| 99热精品在线国产| 精品久久久久久久久亚洲 | 成人国产一区最新在线观看| 69人妻影院| 久久人妻av系列| 亚洲专区中文字幕在线| 亚洲欧美日韩卡通动漫| 天堂网av新在线| 婷婷精品国产亚洲av在线| 国产高清有码在线观看视频| 天堂网av新在线| 日本五十路高清| 免费搜索国产男女视频| 99热精品在线国产| 国产一区二区在线观看日韩| 国产淫片久久久久久久久| 亚洲性久久影院| 一进一出好大好爽视频| 国产日本99.免费观看| 白带黄色成豆腐渣| 亚洲精品粉嫩美女一区| 欧美日韩亚洲国产一区二区在线观看| 1000部很黄的大片| 亚洲aⅴ乱码一区二区在线播放| 老女人水多毛片| 97碰自拍视频| 日本 欧美在线| 国产精品电影一区二区三区| www日本黄色视频网| 久久久久九九精品影院| 搡老熟女国产l中国老女人| 久久精品国产亚洲av香蕉五月| 麻豆国产av国片精品| 欧美+日韩+精品| 色综合亚洲欧美另类图片| 能在线免费观看的黄片| 久久久久国产精品人妻aⅴ院| 日本精品一区二区三区蜜桃| 成人二区视频| 日韩欧美 国产精品| 狠狠狠狠99中文字幕| 亚洲在线自拍视频| 亚洲国产精品sss在线观看| 午夜免费激情av| 免费av观看视频| 九九久久精品国产亚洲av麻豆| 国产淫片久久久久久久久| 日韩,欧美,国产一区二区三区 | 在线国产一区二区在线| 99热网站在线观看| 亚洲欧美激情综合另类| 亚洲精品一卡2卡三卡4卡5卡| 国产精品日韩av在线免费观看| 欧美极品一区二区三区四区| 亚洲 国产 在线| 日韩av在线大香蕉| 18+在线观看网站| 精品一区二区免费观看| 夜夜夜夜夜久久久久| 亚洲中文字幕日韩| 嫩草影院新地址| 人妻丰满熟妇av一区二区三区| 搡老岳熟女国产| 麻豆国产av国片精品| 国内精品一区二区在线观看| 久久久久久国产a免费观看| 日韩欧美在线二视频| 22中文网久久字幕| 色精品久久人妻99蜜桃| 国产伦在线观看视频一区| 久久久久久久久久黄片| 免费看日本二区| 我的老师免费观看完整版| av视频在线观看入口| 成人综合一区亚洲| 欧美bdsm另类| 少妇人妻精品综合一区二区 | 黄色丝袜av网址大全| 神马国产精品三级电影在线观看| 亚洲va在线va天堂va国产| 亚洲无线观看免费| 亚洲熟妇中文字幕五十中出| 欧美高清性xxxxhd video| 中文字幕av成人在线电影| 中亚洲国语对白在线视频| 免费av观看视频| 精品一区二区免费观看| 91精品国产九色| 1000部很黄的大片| 欧美成人a在线观看| 免费av观看视频| 免费不卡的大黄色大毛片视频在线观看 | 日韩中字成人| 韩国av在线不卡| 成人特级黄色片久久久久久久| 一个人免费在线观看电影| 欧美一级a爱片免费观看看| 少妇丰满av| 国产中年淑女户外野战色| 久久香蕉精品热| 日本免费a在线| 免费观看精品视频网站| 久久精品国产清高在天天线| 亚洲av电影不卡..在线观看| av中文乱码字幕在线| 在现免费观看毛片| 国产高清不卡午夜福利| 欧美激情在线99| 波多野结衣巨乳人妻| 亚洲综合色惰| 人妻久久中文字幕网| 日韩一本色道免费dvd| 欧美黑人巨大hd| 人人妻人人看人人澡| 日韩欧美三级三区| 蜜桃久久精品国产亚洲av| 人人妻,人人澡人人爽秒播| a在线观看视频网站| 不卡视频在线观看欧美| 欧美性猛交╳xxx乱大交人| 国产在线精品亚洲第一网站| 国产伦精品一区二区三区视频9| 最新在线观看一区二区三区| 大型黄色视频在线免费观看| 欧美色视频一区免费| 黄色日韩在线| 欧美激情在线99| 亚洲国产日韩欧美精品在线观看| 久久久久久久午夜电影| 成人综合一区亚洲| 他把我摸到了高潮在线观看| 老司机福利观看| 日韩欧美国产一区二区入口| 乱系列少妇在线播放| 在线观看免费视频日本深夜| 啪啪无遮挡十八禁网站| 国产探花极品一区二区| 俄罗斯特黄特色一大片| 成人精品一区二区免费| 天堂√8在线中文| 99热这里只有精品一区| av国产免费在线观看| 国内精品久久久久久久电影| 嫩草影视91久久| 日本欧美国产在线视频| 免费观看在线日韩| 亚洲精品久久国产高清桃花| 网址你懂的国产日韩在线| 欧美一区二区亚洲| 国产亚洲精品av在线| 变态另类丝袜制服| 成人综合一区亚洲| 天堂动漫精品| 九色国产91popny在线| 一a级毛片在线观看| 日本撒尿小便嘘嘘汇集6| 成人av一区二区三区在线看| 亚洲av免费高清在线观看| 国产高清不卡午夜福利| 欧美xxxx黑人xx丫x性爽| 日韩国内少妇激情av| 黄色视频,在线免费观看| 日韩一区二区视频免费看| 97超视频在线观看视频| 观看免费一级毛片| 丰满人妻一区二区三区视频av| 免费黄网站久久成人精品| 久久国产乱子免费精品| 99久国产av精品| av天堂在线播放| 国产成人aa在线观看| 精品一区二区三区视频在线观看免费| 男插女下体视频免费在线播放| 成年版毛片免费区| 欧美成人a在线观看| 人妻制服诱惑在线中文字幕| 麻豆精品久久久久久蜜桃| av在线老鸭窝| 美女高潮喷水抽搐中文字幕| 国产精品一区二区免费欧美| 丰满人妻一区二区三区视频av| 在线播放国产精品三级| 久久精品国产清高在天天线| 九色国产91popny在线| 精品一区二区免费观看| 一本精品99久久精品77| 色吧在线观看| 真实男女啪啪啪动态图| 天堂动漫精品| 成人欧美大片| 少妇丰满av| 午夜精品久久久久久毛片777| 色播亚洲综合网| 美女被艹到高潮喷水动态| 高清日韩中文字幕在线| 一本久久中文字幕| 久久久午夜欧美精品| 波多野结衣高清作品| 最近在线观看免费完整版| 成人美女网站在线观看视频| 悠悠久久av| 少妇猛男粗大的猛烈进出视频 | 成年女人毛片免费观看观看9| 欧美一级a爱片免费观看看| 国产熟女欧美一区二区| 色在线成人网| 日日干狠狠操夜夜爽| 中文字幕免费在线视频6| 国产精品亚洲一级av第二区| 久久亚洲精品不卡| a在线观看视频网站| 九色国产91popny在线| 成人特级黄色片久久久久久久| 国产91精品成人一区二区三区| a在线观看视频网站| 精品久久久噜噜| 亚洲精品一区av在线观看| 少妇的逼好多水| 别揉我奶头 嗯啊视频| av中文乱码字幕在线| 精品无人区乱码1区二区| 五月玫瑰六月丁香| 欧美精品国产亚洲| 给我免费播放毛片高清在线观看| 日韩大尺度精品在线看网址| 日韩中文字幕欧美一区二区| 亚洲一级一片aⅴ在线观看| 99久久精品国产国产毛片| 精品一区二区三区av网在线观看| 国内精品美女久久久久久| 成年女人永久免费观看视频| 很黄的视频免费| 黄色配什么色好看| 美女黄网站色视频| 99在线视频只有这里精品首页| 成人一区二区视频在线观看| 亚洲av中文av极速乱 | 欧美日韩瑟瑟在线播放| 久久亚洲真实| 在线观看免费视频日本深夜| 在线观看午夜福利视频| 亚洲第一区二区三区不卡| 高清毛片免费观看视频网站| 亚洲一区二区三区色噜噜| 亚洲国产色片| 欧美+亚洲+日韩+国产| 中文字幕精品亚洲无线码一区| 此物有八面人人有两片| 桃色一区二区三区在线观看| 五月伊人婷婷丁香| 精品久久久久久成人av| 国产91精品成人一区二区三区| 九色国产91popny在线| 天堂动漫精品| 国产伦精品一区二区三区四那| 亚洲无线在线观看| 久久久久免费精品人妻一区二区| 国产黄色小视频在线观看| 日韩国内少妇激情av| 亚洲欧美日韩卡通动漫| 免费av不卡在线播放| 97热精品久久久久久| 欧美区成人在线视频| 久久九九热精品免费| 91久久精品电影网| 在线看三级毛片| 日本与韩国留学比较| 夜夜夜夜夜久久久久| 国产 一区精品| 色av中文字幕| 久久久久久久久大av| 久久国产精品人妻蜜桃| АⅤ资源中文在线天堂| 中文字幕av在线有码专区| av在线天堂中文字幕| 日韩,欧美,国产一区二区三区 | 全区人妻精品视频| 在线免费十八禁| 男女啪啪激烈高潮av片| 亚洲精品456在线播放app | 精品久久久久久久久久免费视频| 男女边吃奶边做爰视频| 国产免费男女视频| 91久久精品国产一区二区成人| av天堂中文字幕网| 日本欧美国产在线视频| 又粗又爽又猛毛片免费看| 免费在线观看成人毛片| 国产一区二区在线观看日韩| 国产又黄又爽又无遮挡在线| 国产黄a三级三级三级人| 看黄色毛片网站| 我要搜黄色片| 波野结衣二区三区在线| 久久久色成人| 国产av在哪里看| 91麻豆av在线| 亚洲综合色惰| av专区在线播放| 中文字幕熟女人妻在线| 国产免费男女视频| www.www免费av| 国产精品一区二区性色av| 很黄的视频免费| eeuss影院久久| 日韩欧美国产在线观看| 床上黄色一级片| 搡老熟女国产l中国老女人| 日韩av在线大香蕉| 午夜福利在线观看免费完整高清在 | 12—13女人毛片做爰片一| 亚洲欧美激情综合另类| 成人国产麻豆网| 九色国产91popny在线| 久久精品综合一区二区三区| 在线观看午夜福利视频| 日本-黄色视频高清免费观看| 午夜爱爱视频在线播放| 久久久午夜欧美精品| 欧美日韩亚洲国产一区二区在线观看| 免费电影在线观看免费观看| 小蜜桃在线观看免费完整版高清| 最近中文字幕高清免费大全6 | 听说在线观看完整版免费高清| 天天一区二区日本电影三级| 少妇熟女aⅴ在线视频| 亚洲五月天丁香| 身体一侧抽搐| 国产日本99.免费观看| 欧美bdsm另类| 99热这里只有是精品50| 中文字幕熟女人妻在线| 白带黄色成豆腐渣| 99在线视频只有这里精品首页| 2021天堂中文幕一二区在线观| 成人亚洲精品av一区二区| 久久精品国产清高在天天线| 久久久久久久亚洲中文字幕| 舔av片在线| 亚洲经典国产精华液单| 国产欧美日韩一区二区精品| 国产精品久久久久久亚洲av鲁大| 精品99又大又爽又粗少妇毛片 | av在线亚洲专区| 少妇猛男粗大的猛烈进出视频 | 欧美日韩瑟瑟在线播放| 男插女下体视频免费在线播放| 22中文网久久字幕| 如何舔出高潮| 国产亚洲91精品色在线| 熟妇人妻久久中文字幕3abv| 国产精华一区二区三区| 婷婷精品国产亚洲av在线| 一卡2卡三卡四卡精品乱码亚洲| 在线免费观看的www视频| 国产伦精品一区二区三区四那| 少妇裸体淫交视频免费看高清| 一级黄色大片毛片| 久久久色成人| 免费看a级黄色片| 亚洲av不卡在线观看| 国产成年人精品一区二区| 亚洲精华国产精华液的使用体验 | 亚洲最大成人av| 成人国产综合亚洲| 久久久色成人| 亚洲精品成人久久久久久| 久久久精品大字幕| 观看美女的网站| 久久精品91蜜桃| aaaaa片日本免费| 黄色女人牲交| 亚洲av中文字字幕乱码综合| 亚洲国产精品成人综合色| 我的老师免费观看完整版| 老司机午夜福利在线观看视频| 我的女老师完整版在线观看| 真人做人爱边吃奶动态| 啪啪无遮挡十八禁网站| 国产高清视频在线播放一区| 色av中文字幕| 男女边吃奶边做爰视频| 一个人看的www免费观看视频| 午夜精品久久久久久毛片777| 亚洲国产精品sss在线观看| 日本在线视频免费播放| 狂野欧美激情性xxxx在线观看| 精品福利观看| av女优亚洲男人天堂| 国产真实伦视频高清在线观看 | av在线天堂中文字幕| 国产亚洲精品久久久久久毛片| 久久99热6这里只有精品| 99久久中文字幕三级久久日本| 亚洲精华国产精华液的使用体验 | 狠狠狠狠99中文字幕| 免费在线观看影片大全网站| 91精品国产九色| 精品午夜福利在线看| 搞女人的毛片| 给我免费播放毛片高清在线观看| av国产免费在线观看| 啦啦啦观看免费观看视频高清| 一区二区三区四区激情视频 | 三级男女做爰猛烈吃奶摸视频| 国产成人aa在线观看| 亚洲美女视频黄频| 亚洲精华国产精华液的使用体验 | 亚洲aⅴ乱码一区二区在线播放| 1000部很黄的大片| 色av中文字幕| 91久久精品国产一区二区三区| 三级男女做爰猛烈吃奶摸视频| 国产视频内射| 日本精品一区二区三区蜜桃| 老司机深夜福利视频在线观看| 久久国内精品自在自线图片| 婷婷色综合大香蕉| 成人一区二区视频在线观看| 亚洲精华国产精华精| 亚洲精品在线观看二区| 一本精品99久久精品77| 亚洲内射少妇av| 日日摸夜夜添夜夜添av毛片 | 日韩精品中文字幕看吧| 欧美黑人巨大hd| 在线观看免费视频日本深夜| 午夜精品久久久久久毛片777| 日本与韩国留学比较| 精品久久久噜噜| 色播亚洲综合网| 99国产极品粉嫩在线观看| 乱码一卡2卡4卡精品| 国内毛片毛片毛片毛片毛片| 国产精品一区二区性色av| 亚洲美女搞黄在线观看 | 麻豆精品久久久久久蜜桃| 日韩欧美三级三区| 国产毛片a区久久久久| 无人区码免费观看不卡| 国产精品国产三级国产av玫瑰| 国产精品乱码一区二三区的特点| av女优亚洲男人天堂| www.色视频.com| 久久久久久久久久成人| 国产人妻一区二区三区在| 国产免费av片在线观看野外av| 亚洲国产日韩欧美精品在线观看| 久久九九热精品免费| 久久精品夜夜夜夜夜久久蜜豆| 看黄色毛片网站| 亚洲av免费高清在线观看| 午夜福利欧美成人| 午夜视频国产福利| 日韩欧美精品免费久久| 亚洲精品日韩av片在线观看| 日日摸夜夜添夜夜添小说| 中国美女看黄片|