    Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs

    2012-08-11 15:02:31JingchunFENGYafangRENZhongnanDUANZhanjunLIUHaiyangLI
    Water Science and Engineering 2012年3期

    Jing-chun FENG*, Ya-fang REN, Zhong-nan DUAN, Zhan-jun LIU, Hai-yang LI

    1. Institute of Project Management Informationization, Business School, Hohai University, Nanjing 211100, P. R. China

    2. Construction and Administration Bureau of South-to-North Water Diversion Middle Route Project, Beijing 100053, P. R. China

    Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs

    Jing-chun FENG*1, Ya-fang REN1, Zhong-nan DUAN1, Zhan-jun LIU2, Hai-yang LI2

    1. Institute of Project Management Informationization, Business School, Hohai University, Nanjing 211100, P. R. China

    2. Construction and Administration Bureau of South-to-North Water Diversion Middle Route Project, Beijing 100053, P. R. China

    According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably.

    program establishment; program management; bidding section construction period; critical path method (CPM); penalty model; South-to-North Water Diversion Project

    1 Introduction

    Program management is one of the main contents of large and medium-sized project management. Progress goal control of large and medium-sized projects is one of the important ways to achieve strategic objectives. There is a close relationship between progress goals and strategic objectives, and strategic objectives determine progress goals. Strategic objectives are composed of general goals and sub-goals. In order to achieve the strategic objectives of different levels, large and medium-sized projects need to be decomposed into work breakdown structures corresponding to the strategic objectives of different levels; therefore large andmedium-sized projects are a typical multi-project system. Considering the close relations between progress goals and strategic objectives and such factors as multiple levels of progress goals, high requirements for the construction period and project completion rate, and strong conditionality between the progress goals of different levels of large and medium-sized projects, it is necessary to control the progress goals of different levels, especially those of higher levels. Progress goals of higher levels often depend on multi-projects; therefore, program management is necessary, and penalty for delay of the construction period is one of the measures to control the progress goals.

    The existing methods for calculation of penalty for construction delay are suitable for a single project but cannot solve multi-project problems effectively. A single project consists of several pieces of work that coordinate with each other. If a piece of work is delayed, the delay time can be made up by accelerated construction; even if it cannot be offset completely, it only influences the schedule of itself. However, for large and medium-sized projects, program schedule management with the basic unit placed on progress goals of bidding sections is more important, and the progress goals of the program are related to different contractors, who take charge of different bidding sections. Compared with a single project, it is difficult to remove the impact of delay in bidding sections by accelerated construction. When the delay in a bidding section influences not only the construction period of itself but also the earliest start times of the next bidding section and other subsequent bidding sections and the construction period of the program, the claims include the following parts: the employer’s claim for the delayed bidding section itself, the contractors’ claims for the impacts on the next bidding section and other subsequent bidding sections, and the employer’s claim for the influence on the program. If the delay in a bidding section does not exceed its free float, it does not influence the earliest start time of the next bidding section; if it does not exceed its total float, it does not influence the construction period of the program. Thus, the influences of delay in bidding sections on a program are complex, and it is necessary to study the penalty for delay of the bidding section construction period in different situations.

    Some scholars have performed research as follows: Wang and Yang (2005) developed methods to optimize multi-contract incentive and chose the optimal construction period by establishing a leader-follower hierarchical decision model to keep the balance between the employer and contractor. He et al. (2005) solved the problems of project payment schedule with reward and punishment structures, and constructed a reward and punishment model based on time and payment. Zheng (2008) investigated the project incentive mechanism from the perspective of quality, safety, and schedule. The existing research focuses on the construction period incentive mechanism of a single project. However, there are few research and achievements on penalty for delay of the bidding section construction period from the perspective of programs.

    While in practical analysis, the penalty model for delay of the bidding sectionconstruction period mainly relies on the relevant provisions (FIDIC 1999) and engineering practical experiences. According to the current penalty calculation method, a fixed penalty rate is taken, and the penalty for delay of the bidding section construction period is equal to the penalty rate multiplied by the contract amount. The method is only suitable for the case of a single project’s contract but not suitable for program cases. The reasons are as follows: on the one hand, the penalty calculation method only considers the loss caused by the delay in a bidding section itself but does not consider the effects on the earliest start times of the next bidding section and other subsequent bidding sections; on the other hand, it does not consider the impact on the construction period of the program. In the program case, the degree of influence on the program caused by delay in a bidding section only depends on days of delay but has nothing to do with the contract amount of the bidding section. However, according to the current penalty calculation method, the penalty for delay of the bidding section construction period depends on both the contract amount and penalty rate, which can not reflect the influence of the delay in the bidding section on the program objectively, and obviously, the amount of penalty calculated with the current penalty calculation method is unreasonable.

    Progress goals of a program will directly influence the realization of strategic objectives, and it is necessary to establish a penalty model for delay of the bidding section construction period based on the analysis of the influences of progress goals of the bidding sections on those of the program. In this study, through analysis of the progress goal system of large and medium-sized projects and construction of programs, we adopted the program management theory and the critical path method to establish a penalty model for delay of the bidding section construction period, and applied the penalty model to the Baoying station program in the South-to-North Water Diversion Project.

    2 Program based on progress goals

    2.1 Definition of program

    A program is a group of projects with common objectives, including the functional and controlling objectives, which cannot be achieved by a single project or part of projects, and the loss or failure of any project may lead to the failure of the common objectives. According to this definition, the division standards of a program should be common objectives; therefore, the components of a program are associated with each other. There are two kinds of programs: one consists of a group of relevant projects that have common objectives; the other is a combination of a series of purposeful and changeable activities. With the progress goal system, it is possible to establish programs with respect to different levels of progress goals (Feng et al. 2010, 2011; Reiss et al. 2006; Turner et al. 2000). The construction period of programs is so important that it will directly influence the realization of the corresponding strategic objectives. Thus, attention should be paid to the following two points: one is the influences of theconstruction periods of single projects or bidding sections on those of the program; the other is the interactions between single projects or between bidding sections.

    2.2 Generation of program based on progress goals

    According to the work breakdown structure, generally, large and medium-sized projects can be classified into stage projects, individual projects, bidding sections, and pieces of work. Accordingly, the progress goal system of large and medium-sized projects usually includes four levels: level 1 is the progress goal of different stage projects; level 2 is the progress goal of individual projects, which is also called the controlling goal; level 3 is the progress goal of bidding section schedules, which is also called the guiding objective; and level 4 is the progress goal of pieces of work, which is also called the implemental progress goal. According to the definition and the construction principle of the programs, it is possible to generate programs of large and medium-sized projects based on the progress goal system: the program corresponding to the progress goal of level 1 is composed of different stage projects; the program corresponding to the progress goal of level 2 is composed of different individual projects included in each stage project; the program corresponding to the progress goal of level 3 is composed of different bidding sections included in each individual project; and the program corresponding to the progress goal of level 4 is composed of different pieces of work included in each bidding section.

    3 Penalty model for delay of bidding section construction period

    Programs corresponding to progress goals of levels 1, 2, 3, and 4 focus on different projects. The penalty model for delay in bidding sections corresponding to the progress goal of level 3 is discussed in this paper.

    3.1 Influence of delay of bidding section construction period on programs

    In order to calculate the amount of penalty for delay in a bidding section scientifically, it is necessary to analyze the influence of delay in the bidding section on the program, which probably includes the influence on its own construction period, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program. Based on that, the penalty model is constructed, and the influence can be quantified by means of the losses caused by the delay in different aspects of the program (Browning 2001; Bubshait 2003; Pillai et al. 2002; Tareghian and Taheri 2006; Woodbine 2004; Broome and Perry 2002).

    3.2 Construction of penalty model

    3.2.1 Steps of model construction

    According to the critical path analysis and the program principle, if a delay takes place in a bidding section on the critical path, it will prolong the construction period of the programinevitably. For non-critical bidding sections, if the delay in a bidding section exceeds its total float, it will influence the construction period of the program. Therefore, through analyzing the actual delay time, free float, and total float of the critical and non-critical bidding sections, it is possible to construct a penalty model for delay of the bidding section construction period. The steps of model construction are as follows:

    (1) According to the duration of the bidding sections and the mutual logical relationships between them, a double code network diagram for the program of bidding sections is drawn.

    (2) The critical path and the construction period of bidding sections are calculated and determined.

    (3) The total float and free float of each bidding section are calculated.

    (4) Based on the actual completion date and the delay time of each bidding section, the influence of delay in each bidding section on the program is analyzed.

    (5) According to the relationships between the actual delay time, the free float, and the total float of the bidding section, the penalty model for delay of the bidding section construction period is constructed for the following cases: (a) the actual delay time is less than or equal to the free float, (b) the actual delay time is more than the free float but less than or equal to the total float, and (c) the actual delay time is more than the total float.

    (6) For a given bidding section program, various losses of the program caused by delay in bidding sections are analyzed and calculated.

    3.2.2 Analysis of delay in bidding sections from perspective of programs

    Supposing that the number of bidding sections of a program isn, and the actual delay time of theith bidding section isTi, the influences of delay in bidding sections are analyzed.

    3.2.2.1 Analysis of delay in bidding sections on critical path

    If a bidding section on the critical path is delayed, it will influence the program in the following aspects: the earliest completion time of itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program.

    3.2.2.2 Analysis of delay in bidding sections on non-critical path

    If a bidding section on the non-critical path is delayed, the influence on the program caused by the delay should be analyzed in three cases:

    (1) If 0<Ti≤FFi, whereFFiis the free float of theith bidding section, the delay in theith bidding section only influences the construction period of itself, but has no influence on the earliest start times of the next bidding section and other subsequent bidding sections and the construction period of the program.

    (2) IfFFi<Ti≤FTi, whereFTiis the total float of theith bidding section, the delay in theith bidding section influences not only the construction period of itself, but also the earliest start times of the next bidding section and other subsequent bidding sections. It has no influence on the construction period of the program.

    (3) IfTi>FTi, the delay of theith bidding section influences not only the construction period of itself, but also the earliest start times of the next bidding section and other subsequent bidding sections and the construction period of the program.

    3.2.3 Penalty function for delay of bidding section construction period from perspective of programs

    Considering the influence of delay in bidding sections on the critical and non-critical paths on the program, the penalty function for delay in bidding sections of the program is constructed.

    3.2.3.1 Penalty function for delay in bidding sections on non-critical path

    If a bidding section on the non-critical path is delayed by the contractor, the penalty function for delay in the bidding section is as follows:

    wheref(Ti) is the penalty function;Ciis the amount of claim from the employer against the contractor of theith bidding section for its delay in the bidding section;Ci+kis the amount of claim from the contractor of thekth subsequent bidding section against the employer for delaying the construction period of theith bidding section, andk=1, 2,…,n?i; andCtis the amount of claim from the employer against the contractor of theith bidding section for delaying the program resulted from the delay in theith bidding section.

    3.2.3.2 Penalty function for delay in bidding sections on critical path

    If a bidding section on the critical path is delayed by the contractor, it will inevitably influence the earliest start times of the next bidding section and other subsequent bedding sections and the construction period of the program. The penalty function for delay of the construction period in the bidding section included in the program is derived as follows:

    4 Practical analysis of penalty for delay in Baoying station program in South-to-North Water Diversion Project

    The South-to-North Water Diversion Project is a complex large-scale project composed of numerous construction projects. Establishing an effective penalty model can help control the progress goals effectively. According to the work breakdown structure and objective decomposition system of the South-to-North Water Diversion Project, a program system of the South-to-North Water Diversion Project was constructed based on the progress goals. The Baoying station program belongs to the progress goal of level 3 of the South-to-North WaterDiversion Eastern Route Project, which is composed of 14 bidding sections, including the housing project of control station (E), the green plant project of control station (N), civil construction and equipment installation (A), the Yanghuai Road (J), building construction and decoration engineering (M), pump and its affiliated equipment (B), motor and its affiliated equipment (C), sets of high- and low-voltage electrical equipment of 10 kV or below (L), sets of electrical cables with voltage lower than 11 kV (H), sewage disposal equipment manufacturing (G), bridge crane manufacturing (F), GIS switch group (I), main transformer (D), and microcomputer monitoring and video surveillance system (K). In this study, we conducted practical analysis of the penalty model from the perspective of the Baoying station program.

    4.1 Amounts of penalty obtained by current penalty calculation method

    The planned construction period, actual construction period, and contract amount of each bidding section of the Baoying station program and the penalty for delay in each bidding section that was calculated with the current penalty calculation method are listed in Table 1.

    Table 1 Penalty for delay in bidding sections of Baoying station program calculated with current penalty calculation method

    The calculation of the amounts of penalty for the Baoying station program with the current penalty calculation method obeys the following rules: the penalty for delay of the principal projects is 0.5% per day of the contract amount; the penalty for delay of projects related to equipment fabrication and installation is 0.2% per day of the contract amount. The amount of penalty for delay of a bidding section is the product of the days of delay, the contract amount, and the penalty ratio of the bidding section. The highest amount of penalty is5% of the contract amount.

    The problems in the current penalty calculation method for the Baoying station program are as follows: it does not consider the effects of delay in bidding sections on the earliest start times of the next bidding section and other subsequent bidding sections and the construction period of the program, and the penalty rate is predetermined. It is too simple and subjective, and lacks quantitative models; moreover, the calculation of the penalty for delay in bidding sections based on the contract amount is not in accordance with the actual situation from the perspective of programs.

    4.2 Amounts of penalty obtained by present penalty model

    By drawing the network planning diagram of the Baoying station program and calculating the time parameters, the critical path was found, which is A-D-H-I-K-N. Meanwhile, the total float and free float of each bidding section can be calculated with the critical path method. The network planning diagram and related parameters are shown in Fig. 1. The data in the left column of the tables are the earliest start time and earliest finish time of each bidding section, the data in the middle column are the latest start time and latest finish time of each bidding section, and the data in the right column are the total float and free float of each bidding section. The data in parentheses are the planned construction period of each bidding section, and the data in circles are the serial number of nodes. The solid line indicates the real construction process, and the dotted line indicates the virtual construction process.

    Fig. 1 Network planning diagram of bidding sections of Baoying station program

    With the data of investigation, delayed bidding sections were determined under different constraints. The penalty for delay of bidding section construction periods is calculated with the present penalty model. According to the location of bidding sections and the loss of the program caused by delay of the construction period, the delays in bidding sections are classified into two kinds: the delay in critical bidding sections and the delay in non-criticalbidding sections. Of all the critical bidding sections, sections D, H, and I are delayed, and the delay in these projects influences not only the construction period of themselves, but also the earliest start times of the next bidding section and other subsequent bidding sections and the construction period of the program. Of all the non-critical bidding sections, six bidding sections are delayed, in which the delay times of sections E and L are less than their free floats, and based on the analysis above, they only influences the construction periods of themselves; the delay time of bidding section B is more than its free float but less than its total float, with an effect on the earliest start time of the next bidding section, but with no effect on the construction period of the program; and the delay times of bidding sections M, G, and F are more than their total floats, having influence not only on the construction periods of themselves but also on the earliest start times of the next bidding section and other subsequent bidding sections as well as the construction period of the program.

    The amounts of penalty for delay in bidding sections calculated with the penalty model presented in this paper are listed in Table 2.

    Table 2 Penalty for delay in bidding sections of Baoying station program calculated with present penalty model

    4.3 Results and discussion

    Penalties for delay in the six bidding sections D, H, I, M, G, and F calculated with the present penalty model are all more than those calculated with the current penalty calculation method. The main reason is that the delay in bidding sections D, H, I, M, G, and F influences not only the construction periods of themselves but also the earliest start times of the next bidding section and other subsequent bidding projects and the construction period of the program.

    Penalties for delay in bidding sections E, L, and B calculated with the present penalty model are all less than those calculated with the current penalty calculation method, as the delay in bidding sections E and L just influences the construction periods of themselves, andthe delay of bidding section B influences both the construction period of itself and the earliest start time of the next bidding section, but they have no influence on the construction period of the program.

    Taking bidding sections B and M as examples, the contract amount of bidding section B is 8.87 times that of bidding section M. Although both of them are delayed by 120 d, the penalty for the former is only 1.84 times that for the latter. The main reason is that the delay in bidding section B only has influence on the construction period of itself and the earliest start time of the next bidding section, while the delay in bidding section M has influence not only on the construction period of itself and the earliest start time of the next bidding section but also on the construction period of the program. The same case occurs in bidding sections H and L.

    5 Conclusions

    (1) Compared with the current penalty calculation method, the present penalty model considers the influence of delay in a bidding section not only on the construction period of itself but also on the earliest start times of the next bidding section and other subsequent ones and the construction period of the program, and the amounts of penalty for delay in the critical and non-critical bidding sections are determined under different conditions. The present penalty model is more reasonable to reflect the losses caused by delay in bidding sections.

    (2) If the delay in a bidding section only has influence on the construction period of itself, it is reasonable to calculate the penalty based on the contract amount of the bidding section; however, if the delay in a bidding section has influence not only on the construction period of itself, but also on the earliest start times of the next bidding section and other subsequent ones and the construction period of the program, the penalty for delay in the bidding section should be calculated with the present penalty model.

    (3) In the penalty model given in this paper, the penalty rate can be obtained by the amount of penalty divided by the number of days delayed.

    (4) The empirical results show that the greater the influence of delay in bidding sections on the program, the more reasonable the result obtained by the penalty model given in this paper.

    The losses caused by delay in bidding sections are influenced by many factors, even involving multilateral game; thus, it is necessary to perform further study on the quantification of the losses from different aspects of projects by combining with their practical schedules to get more reasonable results.

    Broome, J., and Perry, J. 2002. How practitioner set share fractions in objectives cost contract.International Journal of Project Management, 20(1), 58-64. [doi:10.1016/S0263-7863(00)00035-1]

    Browning, T. R. 2001. Applying the design structure matrix to system decomposition and new directions.IEEE Transactions on Engineering Management, 48(3), 292-306.

    Bubshait, A. A. 2003. Incentive/disincentive contracts and its effects on industrial projects.International Journal of Project Management, 21(1), 63-70. [doi:10.1016/S0263-7863(01)00078-3]

    Federation International Des Ingenieursconseils (FIDIC). 1999.Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer. International Federation of Consulting Engineers.

    Feng, J. C., Hong, Y. Z., Zhang, J., Zhou, Z. B., Sun, W. J., and Wen, S. Y. 2010. Research on the life cycle of the program.Statistics and Decision, (9), 38-40. (in Chinese)

    Feng, J. C., Li, L., Yang, N., Hong, Y. Z., Pang, M., Yao, X., and Wang, L. C. 2011. Research on construction of project critical chain model in South-to-North Water Diversion Project with multi-resource constraints based on portfolio technology.Water Science and Engineering, 4(2), 237-248. [doi:10.3882/ j.issn.1674-2370.2011.02.010]

    He, Z. W., Xu, Y., and Zhu, S. Y. 2005. Study on project payment scheduling problems with bonus-penalty structure from two viewpoints.Systems Engineering—Theory and Practice, 25(10), 39-45. (in Chinese)

    Pillai, A. S., Joshi, A., and Rao, K. S. 2002. Performance measurement of R&D projects in multi-projects concurrent engineering environment.International Journal of Project Management, 20(20), 165-177. [doi:10.1016/S0263-7863(00)00056-9]

    Reiss, G., Anthony, M., Chapman, J., Leigh, G., Pyne, A., and Rayner, P. 2006.Gower Handbook of Programme Management. Aldershot: Gower Publishing Limited.

    Tareghian, H. R, and Taheri, H. 2006. An application of randomized minimum cut to the project time/cost trade-off problem.Applied Mathematics and Computation, 173(2), 1200-1207. [doi:10.1016/j.amc.2005. 04.063]

    Turner, J., Rodney, J., and Simister, S. J. 2000.Gower Handbook of Project Management. 3rd Ed. Aldershot: Gower Publishing Limited.

    Wang, Y. L., and Yang, Y. H. 2005. Incentive optimization and the determination of optimal project duration to multi-contracts.Forecasting, 24(2), 60-63. (in Chinese)

    Woodbine, G. F. 2004. Moral choice and the declining influence of traditional value orientations within the financial sector of a rapidly developing region of the People’s Republic of China.Journal of Business Ethics, 55(1), 43-60. [doi:10.1007/s10551-004-5592-5]

    Zheng, W. Y. 2008.A Study on Incentive Mechanism of Construction Project Based on the Theory of Principal-agent. M. E. Dissertation. Tianjing: Tianjing University. (in Chinese)

    (Edited by Ye SHI)

    This work was supported by the National Science and Technology Plan of China (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A13), the Philosophy and Social Science Fund of Education Department of Jiangsu Province (Grant No. 07SJD630006), the Third Key Discipline (Techno-Economics and Management) of the Project 211, and the Key Disciplines of Jiangsu Province (Engineering and Project Management).

    *Corresponding author (e-mail:feng.jingchun@163.com)

    Received Jul. 14, 2011; accepted Mar. 7, 2012

    精品一区二区三区视频在线| 插阴视频在线观看视频| 国产三级在线视频| 国产毛片a区久久久久| 国产大屁股一区二区在线视频| 色5月婷婷丁香| 国产综合懂色| 国产成人a区在线观看| 亚洲精品第二区| 亚洲成人一二三区av| 午夜福利成人在线免费观看| 成年免费大片在线观看| 日韩一区二区三区影片| 婷婷色av中文字幕| 国产在视频线精品| 精品一区二区三卡| 中文字幕免费在线视频6| av专区在线播放| 欧美激情国产日韩精品一区| 黄色配什么色好看| 久久精品熟女亚洲av麻豆精品 | 一二三四中文在线观看免费高清| 在线a可以看的网站| 国产爱豆传媒在线观看| 国产 一区精品| 日韩大片免费观看网站| 最新中文字幕久久久久| 黄片wwwwww| 国产国拍精品亚洲av在线观看| 亚洲熟妇中文字幕五十中出| 日日撸夜夜添| 2018国产大陆天天弄谢| 男女下面进入的视频免费午夜| 2021天堂中文幕一二区在线观| av.在线天堂| 久久精品国产亚洲av涩爱| 欧美97在线视频| 在线免费十八禁| videossex国产| 久久午夜福利片| 91精品伊人久久大香线蕉| 亚洲av成人av| 欧美另类一区| 亚洲最大成人av| 国产高潮美女av| 亚洲成人av在线免费| 亚洲成色77777| 人人妻人人澡人人爽人人夜夜 | 联通29元200g的流量卡| 最近2019中文字幕mv第一页| av卡一久久| 免费观看无遮挡的男女| 婷婷色综合www| 51国产日韩欧美| 建设人人有责人人尽责人人享有的 | 看免费成人av毛片| 亚洲人成网站在线播| 18禁动态无遮挡网站| 熟女人妻精品中文字幕| 国产亚洲精品久久久com| 国产老妇伦熟女老妇高清| 成人二区视频| 亚洲美女搞黄在线观看| 成人综合一区亚洲| 午夜福利成人在线免费观看| 欧美高清性xxxxhd video| 熟妇人妻不卡中文字幕| 久久精品国产亚洲av天美| 内地一区二区视频在线| 国产 一区 欧美 日韩| 亚洲在久久综合| 国产探花极品一区二区| 成年女人在线观看亚洲视频 | 18禁在线无遮挡免费观看视频| 舔av片在线| 淫秽高清视频在线观看| 一级a做视频免费观看| 久久精品国产亚洲网站| 中国美白少妇内射xxxbb| 大又大粗又爽又黄少妇毛片口| 大又大粗又爽又黄少妇毛片口| 99久久精品一区二区三区| 国产免费又黄又爽又色| 婷婷色综合www| 一二三四中文在线观看免费高清| 美女xxoo啪啪120秒动态图| 国产综合精华液| 激情 狠狠 欧美| 99久久中文字幕三级久久日本| 天堂√8在线中文| 高清日韩中文字幕在线| av又黄又爽大尺度在线免费看| 又粗又硬又长又爽又黄的视频| 久久久久久国产a免费观看| 久久久精品欧美日韩精品| 国产成人福利小说| 97在线视频观看| 国产免费视频播放在线视频 | 久99久视频精品免费| 亚洲高清免费不卡视频| 久久韩国三级中文字幕| 免费观看性生交大片5| 欧美zozozo另类| 亚洲va在线va天堂va国产| 精品久久久精品久久久| 乱系列少妇在线播放| 晚上一个人看的免费电影| 在线观看人妻少妇| 亚洲欧美成人精品一区二区| 欧美区成人在线视频| 天天躁夜夜躁狠狠久久av| 亚洲av.av天堂| 嫩草影院精品99| 少妇猛男粗大的猛烈进出视频 | 一级毛片电影观看| 一级片'在线观看视频| 久久综合国产亚洲精品| 禁无遮挡网站| 国产精品国产三级国产专区5o| 干丝袜人妻中文字幕| 日本三级黄在线观看| 可以在线观看毛片的网站| 欧美一级a爱片免费观看看| 成人美女网站在线观看视频| 国产综合懂色| 国产伦精品一区二区三区四那| 国产在线男女| 中文字幕久久专区| 秋霞伦理黄片| 欧美高清成人免费视频www| 成人亚洲欧美一区二区av| 国产亚洲5aaaaa淫片| 91av网一区二区| 99久久精品国产国产毛片| 网址你懂的国产日韩在线| 麻豆成人av视频| 精品少妇黑人巨大在线播放| 亚洲成色77777| 精品不卡国产一区二区三区| 十八禁网站网址无遮挡 | 亚洲欧美清纯卡通| 午夜福利视频精品| 国产一区二区亚洲精品在线观看| 国产成人91sexporn| 又大又黄又爽视频免费| 91av网一区二区| 国产黄频视频在线观看| 又大又黄又爽视频免费| 美女国产视频在线观看| 久久久精品94久久精品| 听说在线观看完整版免费高清| 亚洲国产精品成人综合色| 搡老妇女老女人老熟妇| 亚洲精品国产av成人精品| 麻豆乱淫一区二区| 一级av片app| 99热全是精品| 精品亚洲乱码少妇综合久久| av黄色大香蕉| 久久亚洲国产成人精品v| 最近中文字幕2019免费版| 日韩av不卡免费在线播放| 亚洲国产精品专区欧美| 欧美激情在线99| 色视频www国产| 观看免费一级毛片| 国产伦一二天堂av在线观看| 大话2 男鬼变身卡| 国产av码专区亚洲av| 精品人妻偷拍中文字幕| 最新中文字幕久久久久| 男女国产视频网站| 18禁在线无遮挡免费观看视频| av女优亚洲男人天堂| 久热久热在线精品观看| 亚洲在线观看片| 欧美+日韩+精品| 岛国毛片在线播放| 亚洲国产高清在线一区二区三| 男人舔奶头视频| 婷婷色综合大香蕉| xxx大片免费视频| 美女xxoo啪啪120秒动态图| 日韩大片免费观看网站| 国产av不卡久久| 欧美性感艳星| 青青草视频在线视频观看| 国产高清有码在线观看视频| 综合色丁香网| 日本一二三区视频观看| 国产精品国产三级国产专区5o| 成年av动漫网址| 日本三级黄在线观看| 十八禁国产超污无遮挡网站| 国产色婷婷99| 亚洲在线自拍视频| 亚洲无线观看免费| 你懂的网址亚洲精品在线观看| 亚洲精品自拍成人| 汤姆久久久久久久影院中文字幕 | 成人亚洲欧美一区二区av| www.av在线官网国产| 最近中文字幕2019免费版| 边亲边吃奶的免费视频| 少妇被粗大猛烈的视频| 高清av免费在线| 搡老乐熟女国产| videossex国产| 韩国av在线不卡| 夜夜爽夜夜爽视频| 天天一区二区日本电影三级| 久久久久久久久久久免费av| 精品国产一区二区三区久久久樱花 | 国产在线一区二区三区精| 最近最新中文字幕大全电影3| 免费人成在线观看视频色| 一个人看视频在线观看www免费| 午夜福利在线观看免费完整高清在| 在线观看一区二区三区| av一本久久久久| 日本一二三区视频观看| 国产色婷婷99| 亚洲激情五月婷婷啪啪| 日韩av免费高清视频| 亚洲av免费高清在线观看| 精品一区二区三卡| 99久久九九国产精品国产免费| 免费无遮挡裸体视频| 久久这里只有精品中国| 能在线免费看毛片的网站| 成年女人在线观看亚洲视频 | 午夜日本视频在线| a级毛片免费高清观看在线播放| 日韩亚洲欧美综合| 天堂影院成人在线观看| 在线a可以看的网站| 久久精品夜夜夜夜夜久久蜜豆| 天天躁日日操中文字幕| 精品亚洲乱码少妇综合久久| .国产精品久久| 国产 亚洲一区二区三区 | 国精品久久久久久国模美| 中文字幕制服av| 国内精品一区二区在线观看| 亚洲精品日韩av片在线观看| 国产黄色小视频在线观看| 啦啦啦啦在线视频资源| 搞女人的毛片| 久久精品久久久久久噜噜老黄| 69av精品久久久久久| 亚洲美女搞黄在线观看| 最近中文字幕2019免费版| 黄片wwwwww| 免费观看性生交大片5| 欧美成人精品欧美一级黄| www.av在线官网国产| 久久精品国产自在天天线| 日本爱情动作片www.在线观看| 色视频www国产| 久久久久久久久久成人| 久久99蜜桃精品久久| 偷拍熟女少妇极品色| 日本黄色片子视频| 中文资源天堂在线| 神马国产精品三级电影在线观看| 久久久久久国产a免费观看| 久99久视频精品免费| 久久久精品免费免费高清| 男女边摸边吃奶| 亚洲最大成人av| 国产乱来视频区| 欧美一级a爱片免费观看看| 欧美日韩一区二区视频在线观看视频在线 | 精品久久久久久久久久久久久| 插逼视频在线观看| av免费在线看不卡| 在线 av 中文字幕| a级一级毛片免费在线观看| 日韩人妻高清精品专区| 国产黄a三级三级三级人| 久99久视频精品免费| 美女被艹到高潮喷水动态| 欧美精品一区二区大全| 天堂√8在线中文| 久久久久精品性色| 免费黄网站久久成人精品| 女人久久www免费人成看片| 亚洲自拍偷在线| 欧美一区二区亚洲| 免费看av在线观看网站| 伦精品一区二区三区| 3wmmmm亚洲av在线观看| 卡戴珊不雅视频在线播放| 亚洲久久久久久中文字幕| 黄色一级大片看看| 日韩中字成人| 免费观看性生交大片5| 91精品国产九色| 色综合色国产| 国产成人91sexporn| 五月天丁香电影| 久久久欧美国产精品| 久久热精品热| 国产精品人妻久久久影院| 禁无遮挡网站| 天堂av国产一区二区熟女人妻| 男人舔奶头视频| 免费观看性生交大片5| 别揉我奶头 嗯啊视频| 免费av不卡在线播放| 高清日韩中文字幕在线| 免费观看的影片在线观看| 99久久精品一区二区三区| 国产午夜精品久久久久久一区二区三区| 日日干狠狠操夜夜爽| 99热这里只有精品一区| h日本视频在线播放| 久久久久久久久久黄片| 国产亚洲av嫩草精品影院| 国产色婷婷99| 亚洲激情五月婷婷啪啪| 一个人免费在线观看电影| 免费看日本二区| 赤兔流量卡办理| 日本与韩国留学比较| 少妇猛男粗大的猛烈进出视频 | 日韩一区二区三区影片| 国产午夜精品一二区理论片| 亚洲精品视频女| 一个人免费在线观看电影| 亚洲av不卡在线观看| 精品国产露脸久久av麻豆 | 免费观看无遮挡的男女| 日本黄色片子视频| 免费看光身美女| 五月伊人婷婷丁香| 在线观看免费高清a一片| 午夜久久久久精精品| 精品不卡国产一区二区三区| 一边亲一边摸免费视频| 免费看av在线观看网站| 99视频精品全部免费 在线| 成人国产麻豆网| 五月天丁香电影| 欧美激情国产日韩精品一区| 亚洲自拍偷在线| 日韩成人av中文字幕在线观看| 中文字幕亚洲精品专区| 你懂的网址亚洲精品在线观看| 91久久精品国产一区二区三区| 欧美日韩亚洲高清精品| 亚洲电影在线观看av| a级毛片免费高清观看在线播放| 欧美 日韩 精品 国产| 亚洲成人av在线免费| xxx大片免费视频| 欧美日韩视频高清一区二区三区二| 如何舔出高潮| 你懂的网址亚洲精品在线观看| 乱人视频在线观看| 亚洲国产精品国产精品| 成人毛片a级毛片在线播放| 啦啦啦中文免费视频观看日本| 又爽又黄a免费视频| 国产永久视频网站| 91在线精品国自产拍蜜月| 老女人水多毛片| 日日啪夜夜撸| 一个人观看的视频www高清免费观看| 亚洲精品一区蜜桃| 国产永久视频网站| 一夜夜www| 伊人久久国产一区二区| 成人毛片a级毛片在线播放| 青青草视频在线视频观看| 国产在线一区二区三区精| 91久久精品电影网| 一区二区三区四区激情视频| 免费黄网站久久成人精品| 精品人妻偷拍中文字幕| 欧美激情在线99| 日韩欧美一区视频在线观看 | 国产黄a三级三级三级人| 久久草成人影院| 免费观看在线日韩| 一区二区三区四区激情视频| av在线老鸭窝| 91午夜精品亚洲一区二区三区| 一个人免费在线观看电影| 亚洲天堂国产精品一区在线| 中文天堂在线官网| 久久精品久久精品一区二区三区| 久久久久久久久久久丰满| 身体一侧抽搐| 嫩草影院精品99| 欧美成人午夜免费资源| 国内精品美女久久久久久| 亚洲最大成人av| 丝瓜视频免费看黄片| ponron亚洲| 性插视频无遮挡在线免费观看| 赤兔流量卡办理| 菩萨蛮人人尽说江南好唐韦庄| 一级黄片播放器| 三级男女做爰猛烈吃奶摸视频| 国产国拍精品亚洲av在线观看| 男人狂女人下面高潮的视频| 亚洲欧美一区二区三区黑人 | 欧美日韩精品成人综合77777| 国产精品熟女久久久久浪| 亚洲在久久综合| 国产一区二区亚洲精品在线观看| 亚洲美女搞黄在线观看| 亚洲精品日韩在线中文字幕| 美女内射精品一级片tv| 亚洲精华国产精华液的使用体验| 99久久中文字幕三级久久日本| 人妻系列 视频| 寂寞人妻少妇视频99o| 嫩草影院新地址| 午夜免费观看性视频| 99热网站在线观看| 啦啦啦啦在线视频资源| 亚洲精品aⅴ在线观看| 亚洲国产精品成人综合色| 国产欧美日韩精品一区二区| 日日撸夜夜添| 午夜福利成人在线免费观看| 只有这里有精品99| 男人爽女人下面视频在线观看| 精品不卡国产一区二区三区| 最近中文字幕高清免费大全6| 看黄色毛片网站| 亚洲国产欧美在线一区| 高清毛片免费看| 亚洲成人中文字幕在线播放| 99热6这里只有精品| 国产一级毛片七仙女欲春2| 少妇猛男粗大的猛烈进出视频 | 免费观看精品视频网站| 蜜臀久久99精品久久宅男| 69av精品久久久久久| 国产午夜精品一二区理论片| 国产精品av视频在线免费观看| 51国产日韩欧美| 国产男女超爽视频在线观看| 免费看美女性在线毛片视频| 国产 一区 欧美 日韩| 日韩中字成人| 久久精品久久久久久久性| 久久久久久九九精品二区国产| 一区二区三区乱码不卡18| 免费看光身美女| 国产高清国产精品国产三级 | 床上黄色一级片| av黄色大香蕉| 看非洲黑人一级黄片| 国产精品美女特级片免费视频播放器| 人人妻人人澡人人爽人人夜夜 | 亚洲久久久久久中文字幕| 精品人妻视频免费看| 建设人人有责人人尽责人人享有的 | 国产午夜精品久久久久久一区二区三区| 久久久久精品性色| 欧美xxⅹ黑人| 午夜免费激情av| 欧美最新免费一区二区三区| 久久99热这里只频精品6学生| 亚洲性久久影院| a级毛片免费高清观看在线播放| 亚洲在线自拍视频| 久久99热这里只有精品18| 免费看日本二区| 日本与韩国留学比较| 久久精品国产亚洲网站| 我的老师免费观看完整版| 18禁裸乳无遮挡免费网站照片| 三级经典国产精品| 免费看a级黄色片| 国产av码专区亚洲av| 最近中文字幕高清免费大全6| 亚洲精品一二三| 夫妻午夜视频| 免费少妇av软件| 久久久久久久久久黄片| 国产色爽女视频免费观看| 菩萨蛮人人尽说江南好唐韦庄| 99热这里只有精品一区| 亚洲精品成人久久久久久| 国产单亲对白刺激| 日本与韩国留学比较| 日韩一区二区三区影片| 神马国产精品三级电影在线观看| 在线免费十八禁| 国产免费一级a男人的天堂| 国产片特级美女逼逼视频| 欧美最新免费一区二区三区| 亚洲欧美清纯卡通| av在线蜜桃| 麻豆成人午夜福利视频| 日韩av不卡免费在线播放| 最近2019中文字幕mv第一页| 亚洲激情五月婷婷啪啪| 一级黄片播放器| 深夜a级毛片| 内地一区二区视频在线| 热99在线观看视频| 亚洲图色成人| 一本—道久久a久久精品蜜桃钙片 精品乱码久久久久久99久播 | 亚洲va在线va天堂va国产| av.在线天堂| 好男人在线观看高清免费视频| 三级国产精品欧美在线观看| 毛片女人毛片| 国产午夜福利久久久久久| 午夜福利视频1000在线观看| 插逼视频在线观看| 日韩欧美精品免费久久| 国产男女超爽视频在线观看| 欧美xxxx黑人xx丫x性爽| 精品不卡国产一区二区三区| 国产在视频线精品| 你懂的网址亚洲精品在线观看| 亚洲va在线va天堂va国产| 国产熟女欧美一区二区| 国产亚洲av嫩草精品影院| 亚洲av日韩在线播放| 成人性生交大片免费视频hd| 我的老师免费观看完整版| 亚洲成人久久爱视频| 男人舔奶头视频| 建设人人有责人人尽责人人享有的 | 久久这里只有精品中国| av线在线观看网站| 国产成人91sexporn| 天堂影院成人在线观看| 久久久久久久久久黄片| 成人综合一区亚洲| 777米奇影视久久| 国产激情偷乱视频一区二区| 国产精品爽爽va在线观看网站| 亚洲性久久影院| 91在线精品国自产拍蜜月| 国产白丝娇喘喷水9色精品| 一级毛片我不卡| 免费观看av网站的网址| 亚洲国产精品成人久久小说| 亚洲精品视频女| 女人被狂操c到高潮| 又大又黄又爽视频免费| 久久久久久久久久久丰满| 国产欧美另类精品又又久久亚洲欧美| 夜夜爽夜夜爽视频| 久久久久久久午夜电影| 日韩在线高清观看一区二区三区| 国产精品爽爽va在线观看网站| 久久亚洲国产成人精品v| 在线观看美女被高潮喷水网站| 国产成人freesex在线| 毛片一级片免费看久久久久| 精品国产一区二区三区久久久樱花 | 成人二区视频| 国产不卡一卡二| av黄色大香蕉| 一本—道久久a久久精品蜜桃钙片 精品乱码久久久久久99久播 | 久久久久九九精品影院| 人体艺术视频欧美日本| 男人和女人高潮做爰伦理| ponron亚洲| 建设人人有责人人尽责人人享有的 | 国国产精品蜜臀av免费| 人人妻人人看人人澡| 亚洲最大成人av| 国产成人freesex在线| 亚洲婷婷狠狠爱综合网| 国产一级毛片七仙女欲春2| 乱系列少妇在线播放| av在线观看视频网站免费| 啦啦啦啦在线视频资源| 日韩伦理黄色片| 又爽又黄a免费视频| 中文精品一卡2卡3卡4更新| 免费看不卡的av| 国产高清有码在线观看视频| 国产精品一区二区在线观看99 | 观看免费一级毛片| 少妇的逼好多水| 91精品一卡2卡3卡4卡| av在线播放精品| 国产男女超爽视频在线观看| 国内精品宾馆在线| 男人舔奶头视频| 国产精品蜜桃在线观看| 99久久精品热视频| 国产成人精品一,二区| 精品久久久久久久久av| 欧美日本视频| 99九九线精品视频在线观看视频| 欧美激情国产日韩精品一区| av卡一久久| 亚洲精品aⅴ在线观看| 久久精品久久久久久久性| 久久久久精品久久久久真实原创| 久久精品国产鲁丝片午夜精品| 国产男人的电影天堂91| 国产精品不卡视频一区二区| 欧美激情在线99| 在线天堂最新版资源| 简卡轻食公司| 深夜a级毛片| 日日啪夜夜爽| 床上黄色一级片| 麻豆成人av视频| 精品久久久精品久久久| 国产乱人视频|